<?xml version="1.0" encoding="UTF-8"?>
<itemContainer xmlns="http://omeka.org/schemas/omeka-xml/v5" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://www.nal.usda.gov/exhibits/speccoll/items/browse?advanced%5B0%5D%5Belement_id%5D=49&amp;advanced%5B0%5D%5Btype%5D=is+exactly&amp;advanced%5B0%5D%5Bterms%5D=Ranch+Hand+aircraft&amp;sort_field=Dublin+Core%2CTitle&amp;page=1&amp;sort_dir=a&amp;output=omeka-xml" accessDate="2026-09-12T23:56:51+00:00">
  <miscellaneousContainer>
    <pagination>
      <pageNumber>1</pageNumber>
      <perPage>15</perPage>
      <totalResults>24</totalResults>
    </pagination>
  </miscellaneousContainer>
  <item itemId="1229" public="1" featured="0">
    <fileContainer>
      <file fileId="1113">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/430775cddb875139c1a668b530b471b0.pdf</src>
        <authentication>76714eb4ca6e132a123fda36b73f6942</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63062">
                    <text>Item ID Number:

00039

Author
Corporate Author

Hayes International Corporation

RepOrt/ArtlGlB Title A/A45Y-1 Internal Defoliant Dispenser System

Journal/Book Title
Year

000

°

Month/Day
Color

IJ

Number of Images

15

DeSCrlptOU NOtBS

Filed witn

Thursday, November 16, 2000

documents from 1970 in the Alvin L. Young Collection on Agent Orange

Page 39 of 46

�Anoymous
A/A45Y-1 Internal Defoliant Dispenser System
Hayes International Corporation

RNAL DEFOLIANT

DISPENSER SYSTEM

INTERNATIONAL1 CORPORATION

�THE A/A45Y-1 INTERNAL DEFOLIANT DISPENSER

The A/A45Y-1 Internal Defoliant Dispenser, designed and manufactured
by Hayes International Corporation, Birmingham, Alabama, is a complete
airborne defoliant dispensing system. The dispenser is packaged to permit
rapid installation into, and removal from, C-130 and C-123 aircraft, with only
minor modifications required to the affected aircraft. See figures 1 and 2.
The Internal Defoliant Dispenser, Part No. A/A45Y-1, provides for loading,
transporting and dispensing of 1000 gallons of defoliant chemical, and in case
of an emergency, dumping the full load overboard in less than 45 seconds. The
tank and cradle assembly is mounted on detachable casters which are removed
before anchoring in the host aircraft. A control console is electrically connected
into an electrical network which in turn is connected to the aircraft electrical
system, certain controls and indicators in the flight compartment and the electrically operated units within the system. Pressure is applied to defoliant
chemical, by an engine and pump assembly mounted on the same frame with the
tank. The defoliant is transported to a nozzle assembly mounted in the slipstream of the aircraft in such a manner that a strip 250 feet wide along the line
LEADING PARTICULARS

Length (app)
Width (app)
Height (app) (without casters)
Weight
Empty
Full
Capacity
Normal operating pressure
Normal dispensing interval
Emergency dump duration
Electrical system
Dump valve operation
Refill time (app)
Dump valve
Spray valve
Suction valve

16 feet, 4 inches
4 feet, 10 inches
6 feet, 5 inches

1420 Ibs
12,420 Ibs
1000 gallons
60 + 5 psi
3 to 4 minutes
Less than 45 sec.
28 volts dc (supplied by host aircraft)
Electrical or manual
20 minutes
Electrical, 10 inch
Electrical, 3 inch
Manual, 3 inch

�TANK VENT
MANHOLE
COVER
DUMP VALVE
(See figure 4)

TANK

LIQUID LEVEL
TEMPERATURE
INDICATOR

ENGINE
EXHAUST

VIBRATION
ISOLATOR SEGMENT

CENTRIFUGAL PUMP
(See figure 3)

MAIN SPRAY
VALVE
TIE-DOWN
FITTINGS
CONTROL
CONSOLE
(See figure 5)

RECIRCULATING
LINE

JET PUMP
REFILL
CRADLE

NOTE: SEE FIGURE 6 FOR TAIL BOOM
AND ASSOCIATED EQUIPMENT.
SEE FIGURES 7 AND 8 FOR
INSTALLATION IN C-123 AIRCRAFT.

Figure 1. Major Components of Defoliant Dispenser

�Figure 2. Defoliant Dispenser (right side)

�of flight is effectively covered. The nozzle assembly is designed for the most
effective atomizing of the defoliant and coverage of foliage to be destroyed. The
dispensing operation and, in emergency, the dump valve operation can be controlled from either the control console near the tank and cradle assembly or
from the pilot's position in the flight compartment.
CAPABILITIES AND LIMITATIONS

The internal defoliant dispenser is capable of containing 1000 gallons of
defoliant which can be completely dumped overboard by remote control or
manually in less than 45 seconds. The pump is capable of maintaining 60 + 5
psi pressure during the normal 4 minute (app) period of operational spraying.
Refilling the tank assembly is accomplished with power and equipment contained
within the defoliation dispensing system.
TANK AND CRADLE ASSEMBLY

The tank and cradle assembly is the major unit of the entire system, having;
a 1000 gallon tank with baffles, manhole, tube connections and stabilizing and
tiedown brackets; an engine and pump assembly which consists of a four cylinder
horizontally opposed engine and pump directly coupled to the engine crankshaft;
and a cradle which carries the tank, and engine and pump assembly and is
provided with four casters which are readily detachable. A temperature gage
and a fluid quantity gage are installed in the tank. The engine is slightly modified
from its original configuration to achieve adaptability to the requirements of the
dispenser system. The detachable casters are to provide limited mobility and
are removed when the unit is tied down.
The defoliant used in the dispenser is stored in the tank and is fed through a
suction line to the pump (two assemblies used on C-130 aircraft). The pump is
driven by an air-cooled engine and forces the defoliant through a discharge line
to a spray valve. A recirculation line is provided so that when the spray valve
is closed, the defoliant will recirculate back through the tank. When the spray
valve is open, the defoliant is forced into the spray boom and atomized by spray
nozzles. When the tank is empty, a float-operated switch, located in the tank,
automatically stops the engines. On C-130 aircraft, when either tank is empty,
the engine of the empty unit will automatically shut down. The spray valve will
not automatically close until the second unit's tank empties and the float switch
is actuated, shutting down its engine.

�The centrifugal pump consists essentially of an impeller and a pump body,
and is driven by the engine through a direct drive. The engine drives the pump
and the speed of the engine controls the quantity of defoliant being dispensed.
See figure 3.
The recirculation line incorporates a jet-pump (ejector) tank refilling system which utilizes the fluid left in the tank from prior operation to initially
operate the jet pump.
TEMPERATURE GAGE

Temperature gage, located on the side of the tank, indicates temperature of
the defoliant in the tank.
LIQUID METER

A liquid meter, located on the side of the tank, indicates the defoliant quantity
in the tank.
DUMP VALVE

The dump valve is a 10 inch gate valve having both electrical or manual
activation. It is designed for horizontal (vertical flow) installation and liquid
flow in only one direction. The bottom of the defoliant tank incorporates a
vortex interupter and adapter to which the dump valve is secured and is in
perfect alignment with an opening and spring loaded door in the belly of the
aircraft. A high speed motor coupled to an actuator provides 2 second operation of the dump valve in either direction and circuit manipulation to indicate
open condition. See figure 4.
CONTROL CONSOLE

The control console is the nerve center of the defoliation system. All
functions are controlled from this position; all monitoring equipment is located
in this position; and the electrical supply is channeled and protected at this
position. Prefabricated electrical cables tie the control console to all related
parts of the system, including the controls on the pilot's instrument panel and
the aircraft electrical supply system. Tandem or single installations are
controlled and monitored from the control console without any changes or
alterations being performed. In the event of electrical power failure of the
aircraft electrical system, certain critical functions have an option of
manual operation. See figure 5.

�Figure 3. Centrifugal Pump

�Figure 4. Dump Valve

�FLUID

POWER

REFILL
FLOAT SWITCH
OVERRIDE
FWD UNIT
AFT UNIT

STARTER
AND
SPRAY
CHOKE THROTTLES INDICATORS VALVE

TANK EMPTY
FWD UNIT
AFT UNIT

ENGINES
FWD UNIT
OIL PRESSURE
LOW
OPERATE

SPRAY VALVE

THROTTLES

OPEN

t
FWD /~\
UNIT \\~J\

^ AFT
\{-J\ UNIT

\
CLOSED

Figure 5. Control Console

AFT UNIT
OIL PRESSURE
LOW
OPERATE

�MAGNETO SWITCH

The MAGNETO switch (AFT UNIT and FWD UNIT) is a single-pole, doublethrow toggle switch used to control the engine magneto. In the down position
the engine magneto is grounded; in the up position the ground is removed from
the magneto, permitting the engine to run (if tank is not empty).

CHOKE SWITCH

The CHOKE switch (AFT UNIT and FWD UNIT) is a spring-loaded pushbutton
switch used to control the solenoid that actuates the engine choke. When pushed
in, the CHOKE switch applies power to the engine choke solenoid.
START SWITCH

The START switch (AFT UNIT and FWD UNIT) is a spring-loaded pushbutton
switch used to control the engine starter. When pushed in, the START switch
applies power to the engine starter. The START switch is guarded to prevent
accidental engagement of the engine starter.
THROTTLE SWITCH

The THROTTLE switch (AFT UNIT and FWD UNIT) is a three-position toggle
switch, spring-loaded to the neutral position. The switch has INCREASE and
DECREASE positions and is used to electrically control the engine throttle through
a geared servo-motor. The engine throttle may be set at any intermediate position between minimum and maximum engine rpm by positioning the switch to
INCREASE or DECREASE and releasing to the neutral position when desired
engine RPM is reached. A governor on the engine regulates maximum engine
RPM.

SPRAY VALVE SWITCH

The SPRAY VALVE switch is a single-pole, double-throw toggle switch used
to electrically open and close the spray valve. In the OPEN position power is
applied to open the spray valve; in the CLOSED position power is applied to close
the spray valve. The SPRAY VALVE switch is guarded in the CLOSED position.
A cockpit SPRAY VALVE switch is provided for control of the spraying
operation by the pilot.

�DUMP VALVE SWITCH

The DUMP VALVE switch, located at the extreme left side of the control
panel (figure 5), provides electrical control for the dump valve. The switch
is provided with a guard which maintains the switch in the CLOSED position.
Placing the switch in the OPEN position actuates the valve motor and opens
the dump valve.
The cockpit DUMP VALVE switch provides positive electrical control for
opening the dump valve by the pilot. Operation is in conjunction with the
console DUMP VALVE switch. Placing either switch in the OPEN position
will actuate the dump valve motor and open the dump valve.
FLOAT SWITCH OVERRIDE

The FLOAT SWITCH OVERRIDE (AFT UNIT and FWD UNIT) is a singlepole, double-throw toggle switch (with a holding coil) used to override the
float switch (in tank) when the float switch has grounded the magneto. The
FLOAT SWITCH OVERRIDE is spring-loaded in the down position and when
placed in the up position, enables the engine to be run when the tank is empty
(in order to fill the tank using the pump). The holding coil holds the FLOAT
SWITCH OVERRIDE in the up position until the float switch is actuated.

ENGINE TACHOMETER

The engine tachometer is dual indicating (two needles) and indicates engine
speed in hundreds of RPM.

FLUID PRESSURE INDICATOR

The FLUID pressure indicator indicates fluid pressure in increments of 4
PSL When properly calibrated this gage can be used as a flow-rate indicator.
CIRCUIT BREAKERS

Four circuit breakers (STARTER AND CHOKE, THROTTLES, INDICATORS,
and SPRAY VALVE) control power to the control panel and provide protection from
electrical overload and short circuits.

10

�SPRAY BOOM

The spray boom (figure 6) is desinged to accommodate 18 spray nozzles and
provide a method for dispensing the defoliant over a wide area. The spray boom
is constructed of 4-1/2 inch diameter steel tubing. The discharge line is off-set
from the centerline of the spray boom to allow the aircraft's ramp to operate
with the dispenser installed. Eighteen spigots are welded to the spray boom to
receive the spray nozzles. C-123 aircraft utilize only 12 of the spray nozzles
and the remaining six spigots are capped. The spray boom is attached to the
fuselage with six struts.
AIRCRAFT INSTALLATION

The dispenser installation in C-123 aircraft consists of towing the tank and
cradle assembly (unfilled) into the aircraft and securing it to the aircraft floor
utilizing twenty 10, 000-pound hook and chain assemblies and the cargo floor
tie-down fittings (figures 7 and 8). All piping and hose assemblies are installed
and the console assembly mounted to the aircraft floor. The spray boom and
connecting struts are attached to outside fittings on the aircraft and the electrical cables are connected. In the case of the C-130 aircraft, two dispensers
are installed in the same manner, and interconnected.

n

�TIE-DOWNS

SPRAY
NOZZLE

TAIL BOOM

INSTALLATION
STRUTS

Figure 6. Spray Boom and Associated Plumbing

12

�r.
Figure 7. Installation in C-123 (left side)

13

�Figure 8. Installation in C-723 (right side)

14

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4865">
              <text>004</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4867">
              <text>0039</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4869">
              <text>Series I</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4866">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;Hayes International Corporation</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4868">
                <text>A/A45Y-1 Internal Defoliant Dispenser System</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4870">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="4871">
                <text>Ranch Hand aircraft</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1399" public="1" featured="0">
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6438">
              <text>020</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6439">
              <text>0291</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6442">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6440">
                <text>1966-09-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6441">
                <text>Clipping: Spray Planes Shield Crippled Craft From Ground Fire</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6443">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6444">
                <text>popular press</text>
              </elementText>
              <elementText elementTextId="6445">
                <text>military impact</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1347" public="1" featured="0">
    <fileContainer>
      <file fileId="1181">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/5f9ee0dc48e3ce9eaf0b7eb8ac0668d6.pdf</src>
        <authentication>16db34463a85f49de8f4cf645cd61bd5</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63130">
                    <text>Item ID Number

00220

Author
Commanding General, United States Army, Vietnam

R8DOPt/ArtlClB TitlO Command Health Report for June 1969 (RCS MED-3
(B-4))

Journal/Book Title
Year

000

°

Month/Day
Color
Number of Images

n

4

Descriptor) Notes

Monday, January 22, 2001

Page 232 of 341

�DEPARTMENT OF THE ARMY
HEADQUARTERS. UNITED STATES A R M Y VIETNAM
APO SAN FRANCISCO

66375

AVHSU-PM

SUBJECT: Command Health Report for June 1 6 (RCS MED-3 (Rr-4))
99

3 3 F~//.

Commanding General
United States Army Vietnam
APO San Francisco 96375

A. Health of the Command
1. Personal
(a) Physical condition of troops s Most major consolidated and individual Command Health Reports describe the physical condition of ITS Aray personnel
as adequate or satisfactory while a few reports indicate the physical statue
of their personnel as being excellent. The overall health of the command remains at a satisfactory level although there were again increases in total
disease admissions. (See Tab A).
(b) Sanitary discipline: The following selected comments are included
because it is felt that they most accurately describe the level of sanitary
discipline and personal hygiene among US Army personnel.
The 1st Infantry Division reports* "Sanitation standards remain at a high
level throughout most of the Division base camp areas. Some units have
reached, and continue to maintain, superior sanitation standards. These units
are examples of what • good command emphasis can accomplish in improving the
living conditions and morale of the troops. The sanitation of IDP's and fire
support bases continues to present problems. The Division Surgeon plans to
visit these areas as often as air transportation will permit. Any difficulties
of, a medical nature should be brought to his attention so that corrective
action can be initiated at this level.. Sanitation teams should make frequent
Inspections of their unit areas and report the results to the Medical Operations
Officer for his action."
^

The 4th Infantry Division makes this comment on personal hygiene: "With a
few exceptions personal hygiene is adequate. The monsoon season presents
particular difficulty in maintaining clothing resupply. Some units, the
tactical situation permitting, have periodic rotation of troops through fire

�AVHSD-PM

28 July 1969
SUBJECT: Command Health Report for June 1969 (RCS MED-3 (R-4))

bases or trains area for rest, clean-up, drying out and a change of clothes.
The 1 1 Infantry reports such a policy and also supplies a change of clothing
/4
every four days and socks every two days. The 1/35 Infantry reports a similarly successful program which allows also health education, dental check-ups,
and other medical activities."
The status of sanitary discipline within the llth Armored Cavalry Regiment is
described as follows: "Sanitary discipline is generally good but continued
command support is still needed in the field locations. Increased emphasis
on field sanitation teams with a proposed plan to have squadron MSC officers
assume more supervisory control over the teams is hoped to improve sanitation
in the field."
From the 3d Brigade, 82d Airborne Division conies this report: "The sanitary
discipline within the Brigade is good. Because of operational conditions in
some of the areas} i.e., inundated areas, personal hygiene is sometimes less
than desirable but it is good as can be expected under existing conditions.
Adequate shower facilities are available in all permanent installations and
fire bases. There is a fly problem around one of the fire bases (Hardcore,
1/508 Infantry). This is due mainly to the civilian garbage dumps surrounding
the fire base. This will continue to be a problem until the garbage sites
can be destroyed or relocated. Trash and garbage cans are covered within
the fire base itself and field sanitation is excellent. Arrangements are
being made through Brigade Vietnamese Liaison Officer to look into the possibility
of relocating garbage sites away from the fire base. Rodent control seems
adequate. There were only two rat bites on post during this period. There
are adequate rat traps within the Brigade."
Finally the 1st Infantry Brigade, 5th Infantry Division (Mech) reports:
"Rodents have not been a major problem in base camp areas, primarily because
of good area sanitation. Sanitation of bunker areas on camp perimeters has
been of variable quality. Food and refuse in bunker areas will attract rats
which in turn attract snakes, creating a hazard to those on guard duty*.
Pacific Architects and Engineers have assumed the Post Engineer functions of
entomology and rodent control at Red Devil and LZ Sharon. They have set out
rodent anticoagulant bait boxes on these bases and refill them at scheduled
intervals. Steps have been taken to insure better police in perimeter bunkers.
They havealso assumed responsibij^ty^^fjgr^JLBjgJB^M^
"
baseia. General area sanitationfinal water monitoring before consumption and waste disposal are still under the responsibility of each company
through its Field Sanitation Teams."
(c) Bathing facilities, adequacy of clothing and status of training
in personal hygiene and field sanitation: The 1st Infantry Division Surgeon
states: "Some units continue to need work on their shower drainage systems.
Several small marshes, heavily populated with insects, have been found in the

�rnjU-PM

28 July 1969

rBJECT: Command Health Report for June 1969 (RCS MED-3 (R-4))
are again meaningless due to the constant variation of numbers and locations
of collecting stations, and the inability of units to timely process all
collections. Trends are important, and even with the inaccuracies it can
clearly be concluded that mosquito populations are sharply increasing in
locations affected by the monsoon rains. Total numbers identified this
quarter were: 7582 for April, 13,060 for May, and 28,830 for June. Disease
and epidemiological data found elsewhere in this report indicate the continuing rise of known and suspected mosquito-borne diseases in RVN.

6. Medical Zoology Section
(a) Small animal processing: Five hundred and twenty-eight (528)
rodents were processed during the month of June.
(b) Plague analysis: Rodent spleens, flea pools and aerology samples
were forwarded to the Institute of Pasteur at Nha Trang or Saigon for plague
analysis. Serology of a Bandicota indica (a large rat type rodent) from
Long Binh Post was plague positive. No spleens or flea pools were positive
for plague.
(c) The overall average number of fleas per rodent (flea index)
continued to increase as April was 0*59; May was 0.95 and June was 1.2.
Whereas, this overall index may be inaccurate and of questionable value it
is interesting to note that off-post the index was about 3.0 while on-post
it was only O c ?c The only similarily significantly high individual location
index was at Cam Ranh Bay off-post with a 3*07 which though high is down from
the 3c97 of May.
(b) Rodent mites were of significance in the Cu Chi area. A marked
increase in Leptotrombida mites indicates a greater than usual danger of
scrub typhus in that area*
*
7. Aerial Dispersal of Insecticides
(a) Air Force C-123 "Ranch Hand"« Both C-123 aircraft continued in
use.. The target interval varied, but is approaching the desired of 10 days,
The following missions were flown in the month of June. The number accompanying
the area indicates the number of missions if more than one: Phu Cat (3),
Hue/Phu Bai (3), Due My (6), Da Nang (6), Ninh Hoa (3), Phan Rang (3), Chu
Lai U), Men Hoa (2), Ap Nam/Phuoc Tho (3), Tan Son Nhut (2), Long Binh
199th FSBs, Cam Ranh ( ) Dong Ha/Quang Trl ( ) and Pleiku. A total of
2,
3,
15,775 gallons of 95$ malathion was applied to the areas listed in"the 46
missions completed.
;
(b) Helicopter Spraying: Eight Agavenco insecticide sprayers
finally arrived. Four each were assigned to the 20th and 172d Preventive
Medicine Units respectively. The rigs as received were unsuitable for ultra
low volume (ULV, which is 0.5 Ib/acre) application of malathion. Commendable

I

Zl

�AVHSU-PM
28 July 1969
SUBJECTS Command Health Report for June 1969 (RCS MED-3 (R-4))
work has been done by MAJ Waddell, Staff Entomologist, 20th Preventive
Medicine Unit to calibrate the rigs using available nozzles and components.
Due to his success helicopter spray missions should begin sometime in
July.
(c) Unauthorized Aerial Sprayings
(1) Jfelicopter herMcide_8joijyej^_j£QjjyjaiejbQ_j)e used for.._tJie
unauthorized dispersajTof Tnagcticides^incontradiotion to the provisi
"
Directive 4 - 0
01.
"
(2) From 28 February 1968 thru 1 March 1969, USAF, PA&amp;E,
and Preventive Medicine Unit activities utilized or had in stock at the
end of this period about 3960 55-gallon barrels of 57J6 malathion. However,
USA Inventory Control Center, Vietnam figures show that 8686 barrels were
issued during the same period. Approximately 2 0 0 0 gallons of CONCENTRATED
6,0
malathion appears to have been used by unauthorized sources.
(3) Authority and thus responsibility for helicopter application of insecticides has been delegated to the conaanders of the preventive
medicine units and detachments. Such missions must be conducted under the
supervision of a medical entomologist. Such authority has not been granted
to major tactical unit chemical officers or even surgeons.
NOTE: When helicopter application of insecticides are deemed advisable by
the unit surgeon the nearest preventive medicine unit, detachment or section
should be contacted. A list of such preventive medicine units, their addresses, and telephone numbers is contained in Appendix I, Change 1 to USARV
Regulation 4 0 1 .
.-2
8. Pesticides
(a) Safety and Toxicology: As malathion is an insecticide with acute
dermal toxicity of approximately one half that of DDT all supervisors of
personnel handling malathion must adhere to the provisions of USARV Regulation
4-7
04.
(b) Shortages of several items continue to exist. All instances
of insecticide supply problems at any level should be documented and forwarded
direct to. Headquarters, USARV, Office of the Surgeon, ATTNs Entomology
Consultant, APO 96375.

28

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6053">
              <text>018</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6055">
              <text>0220</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6057">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6054">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;Commanding General, United States Army, Vietnam</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6056">
                <text>Command Health Report for June 1969 (RCS MED-3 (B-4))</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6058">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6059">
                <text>pesticide application</text>
              </elementText>
              <elementText elementTextId="6060">
                <text>pesticide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1360" public="1" featured="0">
    <fileContainer>
      <file fileId="1193">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/4242c11bdf97e51356fa69dce748eb0c.pdf</src>
        <authentication>bdd23ee31f1fcb10cb1ed20e7e8c2e9b</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63142">
                    <text>Item ID Number

00237

Author
Corporate Author
Report/Article Title F°rm: Military Insecticides, Use in Vietnam,
AOPA/November-December 1983, Document Source:
Historical Summary (RCS: MACSJS-01) June 67

Journal/Book Title
Year

000

°

Month/Day
Color

U

Number of Images

1

DOSOrlptOU NOteS

Summarizes equipment used for dispersal of
insecticides in March 1967

Monday, January 22, 2001

Page 249 of 341

�Military Insecticides
Use In Vietnam
AOPO/ttovember-December 1983

Document Source
•.-^\

S

I

» V x^_ ^ \
^

™

—\ ^^^

Date of Document

°
^

Insecticides Mentioned
(Type/Quantity/Use)

MfcCV I

O

o
C

Other Information If Available
Method of Application

:

location of Application

Military Unit if Different from Above

Names of Personnel Mentioned

Significant Event(s) - Spill, Fire, Explosion, Clean-up

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6152">
              <text>019</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6153">
              <text>0237</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6155">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6154">
                <text>Form: Military Insecticides, Use in Vietnam, AOPA/November-December 1983, Document Source: Historical Summary (RCS: MACSJS-01) June 67</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6156">
                <text>pesticide application</text>
              </elementText>
              <elementText elementTextId="6157">
                <text>Ranch Hand aircraft</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1304" public="1" featured="0">
    <fileContainer>
      <file fileId="1146">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/90b72923a486d86fddcbfa9031178e82.pdf</src>
        <authentication>4f245730fb6d4f290356ece15974756c</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63095">
                    <text>Item ID Number:

001 eo
Howard, John D.

Corporate Author
RBDBPt/ArtitiB TltlB Herbicides in Support of Counterinsurgency Operations: A Cost-Effectiveness Study

Journal/Book Title
Yaar
i Bui

1972

Month/Day

March

Color

D

132

Introduction and background gives brief overview of Operation Ranch Hand and use
of herbicides in Vietnam.

Friday, January 05, 2001

Page 160 of 194

�Howard, J. D,,
5 ^ 1972
.
Herbicides in support of counterinsurgency
operations: a cost effectivness study

I/UNLIMITED

AD A0745180

Technical
Report
£EJEIOMEDICAL LIBRARY
JAW 10 1980

distributed by

fiQClIMENTS

Defense Technical Information Center
DEFENSE LOGISTICS AGENCY
Cameron Station*Alexandria, Virginia 22314

UNCLASSIFIED/UNLIMITED

�* - -4

1.0

11.25

�o
00

NAVAL

SCHOOL
Monterey, California

T-H

THESIS
HERBICIDES IK SUPFOl^ OF
COUNTERIKSURGEKCy OPERATIONS:
A COST-EFFECTIVENESS STUDY

John DaXton Howard

Thesis Advisor:
NATIONAL TECHNICAL
INFORMATION SERVICE

James R. Caora
March 1972

ion pubtic. x.e£e&amp;!&gt;e.; datuiittien untuniltd.
K.
\

�Herbicides in Support of Counterinsurgency operations:
A Cost-Effectiveness Study

John DaIton Howard
Major, United States Army
B.S., United States Military Academy, 1964

Submitted in partial fulfillment of the
requirements for a degree of

MASTER OF SCIENCE IN OPERATIONS RESEARCH

from the
NAVAL POSTGRADUATE SCHOOL
March 1972

Author

Approved by:
Thesis Advisor

Chainrari, Department of Operations Research
// and Administrative Sciences

Academic Dean

�UNCLASSIFIED
Cl as&lt;unration

DOCUMENT CONTROL DATA - R &amp; D
!.*!• avrrstt rmptttt tt
j*. REPORT SECURITY cn-.iif ic* TIO«

t of title, fcodr ttf *t&gt;*tr*ft
TtN6 A C T I V I T Y

Unclassified

Naval Postgraduate School
Monterey, California 93940

J*. SltOU*

Herbicides In Support Of Courterinsurgency Operations:
A Cost-Effectiveness Study
of t*«6tt •nd.inC*ir»ire &lt;****»

Master's Ihesisj March 1972
John D. Howard
C NO. O

EPOBT D A T E

130

March 1972
M. C O M T K A C T Oft G R A N T NO.

44

M. OntCIMATOM't HE'QMT MUMICHIH

». fHOJECT NO.

• 6. O T H E R *E»O*T HO(I&gt; (

tft/«

IS. D I J T A i e u T I O M t T A T E M E M T

Approved for public release; distribution unlimited.
It. SUPPLEMENTARY NOTES

11. SPONSORtNC UILIT A R T A C T I V I T Y

I). A K S f K A C T

This study develops costs, effectiveness criteria, and
cost-effectiveness ratios for military herbicide systems and three
other alternatives which can perform the missions of foliage removal
and crop destruction in support of counterinsurgency operations.
The results reflect the Vietnam combat environment wheie all systems
were employed at sometime during the period 1965-1971. The systems
considered are aerial delivery of herbicides by UH-1 helicopters
and ue-123 Air Force aircraft, tactical land clearing with crawler
tractors, "slash and burn" clearing with indigenous cutters, and
fireboizbing with CH-47 helicopters. The effectiveness criteria
focus on the ability of these systems to perfona the two missions
and withstand the rigorous constraints of a hypothetical combat
mission. From these criteria, two sets of cost-effectiveness vectors
are obtained to allow a decision maker the opportunity to evaluate
each system and determine a possible force structure to accomplish
the two missions in a Vietnam-type insurgency.

DD/r.,1473

UNCLASSIFIED

S/N 01 Of*«Q7-«S!t

Security Ctatsificitio*

�UNCLASSIFIED
S«eurit¥ Classification
LIM K A

l*N K

•

KKT W0»0»
»OLt

tri&gt;. • c
«« T

Cost-effectiveness
Herbicides
Tactical Land Clearing
Firebombing
"Slash and Burn" Clearing
Counterins urgency

|

1

DD /,T.,!473 «8*«&gt;

^^

UNCLA SSIFI ED
Security CUstiftcttiet

&gt;.]«BI

�ABSTRACT

This study davelops costs, effectiveness criteria, and
cost-effectiveness ratios for military herbicide systems and
three other alternatives which can perform the missions of
foliage removal and crop destruction in support of counterinsurgency operations. The results reflect the Vietnam
combat environment where all systems were employed at
sometime during the period 1965-1971. The systems considered
are aerial delivery of herbicides by UH-1 helicopters and
UC-123 Air Force aircraft, tactical land clearing with
crawler tractors, "slash and burn" clearing with indigenous
cutters, and firebombing with CH-47 helicopters.

The effec-

tiveness criteria focus oh the ability of these systems to
perform the two missions and withstand the rigorous
constraints of a hypothetical coiribat mission. From these
criteria, two sets of cost-effectiveness vectors are
obtained to allow a decision maker the opportunity to evaluate each system and determine a possible force structure to
accomplish the two missions in a Vietnam-type insurgency.

�TABLE OP CONTENTS
I.

INTRODUCTION
A.

II.

PURPOSE

B.

6
•

BACKGROUND

•

•

6
7

THE ALTERNATIVES

14

A.

AERIAL DELIVERY OF HERBICIDES

14

1.

UC-123 —

14

2.

UH-1

•

•

16

•

20

B.
C.

"SLASH AND BURN" CLEARING

28

D.
III.

TACTICAL LAND CLEARING ~

PIREBOMBING

30

METHODOLOGY

33

A.

ASSUMPTIONS

•

33

B.

PARAMETERS

C.

COST ANALYSIS

D.

EFFECTIVENESS CRITERIA AND COST-EFFECTIVENESS

•
•

34
•

35

MEASURES
E.

36

PARAMETER SENSITIVITY

—

38

IV.

ANALYSIS OF AERIAL DELIVERY OF HERBICIDES

40

V.

ANALYSIS OF TACTICAL LAND CLEARING

75

VI.

ANALYSIS OP "SLASH AND BURN" CLEARING

92

VII.

ANALYSIS OF FIREBOKBING

100

VIII.

INSIGHTS AND CONCLUSIONS

109

A.

RESULTS OF THE ANALYSIS

109

B.

INSIGHTS

C.

CONCLUSIONS

•
•

•
—

112
114

�APPENDIX A:

DETAILED HERBICIDE COSTS

116

APPENDIX B: DETAILED COSTS FOR TACTICAL LAND CLEARING— 118
APPENDIX C:

DETAILED COSTS FOR FIREBQMBING

APPENDIX D: DATA SOURCES

120

—

BIBLIOGRAPHY

— 121

—

124

INITIAL DISTRIBUTION LIST
FORM DD 1473

•

—

128
•

,»—

__

..

�ACKNOWLEDGEMENT

This study was made possible through the contributions
and assistance of the V. S. Array Engineer Strategic Studies
Group, Washington, D. C., and Major Richard C. Bennett,
senior project director in that office. A special acknowledgement, goes to Mr. J. T. Soules, Vice President of the
International Depar-iaent of the Rome Plow Company, whose
correspondence and interest in the study provided the author
with a wealth of data and many insights into the salient
features of tactical land clearing.

�I.
A.

INTRODUCTION

PURPOSE

The purpose of this study is to conduct a costeffectiveness evaluation of military herbicide systems in
a counterinsurgency environment. The test case for the
determination of relevant costs will be those dollar costs
incurred during the systems' empJoyment in vegetation
renoval and crop destruction missions .in support of combat
operations in the Republic of Vietnam (RVN) during 1965-1971.
Since costs are the values of alternatives foregone, the
study will address three other techniques used for foliage
clearance and crop control in RVN during the same timeframe.

The alternatives to herbicide operations which will

be considered are:
1. Tactical land clearing operations.
2. "Slash and burn" clearing using indigenous
labor forces.
3. Firebomb?ng.
Each method will be discussed in detail in Chapter II.
Specifically excluded from the scope of the study is
consideration of the externalities that night result from
possible damage to the ecological balance of the host
country.
The cost measures will attempt to show the relative
dollar expenditores araong the systems involved. Several

�measures of effectiveness will be used to Judge their output
and ability to accomplish the missions of foliage reioval
and crop des'

=tion under combat conditions. These,

coupled with the cost measures, will yield cost-effectiveness
figures which will be the basis for comparisons, These
comparisons will present the decision maker with sets of
data on the strengths and weaknesses of the individual
alternatives and combinations of the systems.

B.

BACKGROUND

The proper use of cover and concealment has always been
a critical factor ..n planning military operations.

History

is full of examples of armies that effectively used natural
cover and foliage.

Often, judicious use of these elements

made up for other deficiencies in the forces.

The colonial

settlers of early America learned the arts of cover and
concealment from the Indians and later put them to good use
in the War of Independence.

As warfare evolved from the

strjiight-line formations of the 19th century and the
trenches of World War I, it became apparent that strict
adherence to the principles of concealment was not reserved
solely for the guerrilla or irregular soldier.

Hence,

tactics and methods were developed in an attempt to deny
any potential enemy, insurgent or conventionally organized,
the protection and sustenance that might be offered by the
vegetation.

�The term "herbicide" was coined in the 1930's to
enctmpass that family of chemicals which are antiplant
agents.

Some members of this family were found to be

systemic hormones which entered broad-leaf plants touching
off wild growth and eventually killing then. Others were
determined to be dessicants which injured the foliage by
direct chemical action on contact. Throughout World War u,
military research in chemical warfare played an important
role in the development of the potent herbicides now in
world-wide use. Although initial efforts were directed at
the discovery of suitable dessicants (for use as antierop
agents), scientists from the university of Chicago determined that some of these growth regulators might be applied
to grasses and tropical plants. This generated a great deal
of interest in the defoliation or foliage removal properties
of the chemicals since many tons of explosives had been
expended on Pacific islands to deny the Japanese concealment
afforded by the tropical rain forests.

In early 1945,

successful tests were conducted in the Florida Everglades
concerning the possibility of using several inorganic
defoliants in aerosol form, The results from this work
prompted the Army to recommend the use of ammonium thiocynate in the Pacific theater.

This recommendation was not

adopted for fear of the repercussions that might arise from
the agent's association with chemicals of the cyanide
faaily.

The war ended prior to the testing of a more

suitable agent.

8

�In the late forties, the research generated during World
War II was readily employed by civilian industry.

The

previous discovery of the organic chemicals 2,4-D and 2.4,5-T
fostered revolutionary steps in chemical plant control and
stimulated the development of a host of new agents. These
herbicides were more effective, more selective, and less
hazardous than the former compounds.

Chemicals such as

piclorara, bromacil, cacodylic acid, and paraquat were
tailored to perform specific kinds of vegetation control.
Consequently, their use at home and abroad became widespread.

In 1950 the estimated market for herbicide? came

to §1.5 million while by 1965, it had gruwii to over $211
million.

(This was prior to extensive military purchase of

certain agents for use in RVN.) In 1959 alone, American
farmers treated 53 million acres of acres of agricultural
land not to mention the thousands of miles sprayed by local
government agencies and private corporations to control
growth along highways, powerline right-of-ways, fire breaks,
and ditches.

(House and others, 1967.1
&gt;,
J
The Department of Defense (DOD) did not become involved

in herbicide operations until 1958.

The success of British

defoliation operations with helicopters in Malaya prompted
several feasibility studies on acceptable defoliants and
delivery techniques.

In 1961, on request of President Diem

and the government of RVK, a test program was established to
assist in countering that nation's growing Communist-inspired
insurgency.

The Vietnamese army (ARVN) found that the most

�difficult and frustrating task was locating the enemy.

The

dense forests and jungles offered the Viet Cong (VC) excellent concealment which permitted them to cove with relative
impunity to within striking distance of key military installations , lines of communications (LOG), and government
centers. By removing parts of the foliage, the Allied
forces hoped to increase aerial and ground surveillance capabilities and deny the use of certain areas as sanctuaries.
The actual herbicide operations began under the codename
RANCH HAND in January 1962 with three specially configured
U.S. Air Force (U3AF) UC-123B aircraft.

The operations

proceeded for the next two years at a moderate scale but
with increased enemy resistance.

Ground fire became so

intense that in March of 1965 fighter escorts were provided
on a permanent basis.

The demand for defoliation and

controlled crop destruction missions increased as U.S.
participation in the war grev. This resulted in the RANCH
HAND program being expanded in 1966 into a squadron-size
unit, 12th Air Coimr-ando Squadron (later the 12th Special
Operations Squadron), with an equipment level of 18 aircraft
and headquarters at Bien Hoa Air Base.

In the peak years of

defoliation operations (1967-1968), the squadron was
increased to 24 aircraft.

jKcConnell, 1970.1

To supple-

ment the 12th Special Operations Squadron, some U.S. division commanders were given the authority to conduct local
defoliation and crop destruction missions in their area of
operations (AO) with U.S. Army helicopters.

These operations

�were usually complementary to the RANCH HAND sorties and
employed local aviation assets thit were diverted froia other
lift tasks.
From the inception of the test program, great effort was
oade to insure proper targets were picked and spraying of
friendly areas was prevented.

Each mission was approved by

the local Vietnamese province chief, the Military Assistance
Command Vietnam (KACV), and the U.S. Embassy, crop destruction targets were subject to special scrutiny so that the
most harm would be done to the VC and the least to the local
inhabitants. A commission was established to contpensate and
reimburse those people who had suffered financial loss as a
result of herbicides.

Although friendly areas were never

specifically targeted, some spray did occasionally drift
causing damage to rice crops or rubber trees.

U.S. authori-

ties attempted to take prompt action on any claims whenever
this situation occurred.

Iconzales

1968 J

Concurrent with increased herbicide operations in
Vietnam, there was an expanding controversy over the program
in the united States.

Critics asserted that if chemical

herbicides were coroaonly used, it might not be long before
more noxious chemical agents are considered usable.

Others

have claimed that such an indiscriminate weapon results in
as much suffing for the local populace as the VC.
19681

and

fLewallen

|Hersh

1971 J . The scientific community

raised the question of the ecological consequences of
repeated herbicide applications.
11

The American Association

�for the Advancement of Sciences (AAAS) has been and still is
the center of the controversy. Probably the most vocal and
widely quoted critic within AAAS is Dr. Matthew Meselson, a.
Harvard University biologist.

Or. Meselson chaired the AAAS

Herbicide Assessment Commission and visited Vietnam on a
five-week tour.

In the committee statement to an AAAS

convention, the following assertions were mades
1. fhe Army's crop destruction program was a
failure.
2.

Cae-fifth to one-half of Vietnam's mangrove
forests had been "utterly destroyed."

3.

One-half the trees in the mature hardwood
forests north and west of Saigon were
dead. 1

Several other scientists who had previously visited RVH in
1958-19S9 strongly recommended and lobbied for the cancellation of the herbicide operations until scientists had time
to study the long-term effects of the program,
Pfeiffer

[orians and

1970]

These recommendations coupled with severe criticism from
certain members of Congress and other citizens helped bring
about the suspe: sioa of herbicide operations in the summer
of 1970.

On 7 October 1970, Public Law 91-441 directed the

Secretary of Defense to prepare a study to identify the role
%offey, Phillip M., "Herbicides in Vietnam: AAAS Study
Finds Widespread Devastation," Science, 15 January 1971,
p. 43.
12

�of herbicides in support of combat operations and evaluate
their utility in KVB. It also required him to contract
with the National' Academy of Sciences (HAS) for a comprehensive study to determine the ecological and physiological
effects of the herbicide program in RVN. By 1 March 1972,
the Secretary of Defense was required to transmit the DOD
findings together with the RnS study to the President and
the Congress.
It is against this background of U.S. use of herbicides
and Congressional concern about the role of herbicides that
the examination of the alternatives discussed in the next
section has been undertaken.

13

�II. ALTERHRTIVES
A.

AERIAL DELIVERY OF HERBICIDES

Aerial delivery is the prime method of dissemination of
chemical herbicides for large-scale defoliation or crop
destruction missions. Other methods, such as use of the
three-gallon hand-pucp sprayer, the M-106 riot control
dispenser, and boat-counted spray systems, have beep employed
in Vietnam but will not be considered in the context of this
study. However, all herbicide missions are designed to
accomplish some or all of the following objectives:
1. Deny tlie enemy cover and concealment and
channel his movement.
2. Deny the enemy the capability to forage
off tne land.
3. Deny tae enemy ambush sites adjacent to LOG.
4. Provide improved aerial and electronic
surveillance.
1. Delivery By Fixed Wing Aircraft (UC-123)
The major portion of the U.S. herbicide effort is
carried by a modified version of the Air Force's two-engine
medium cargo carrier, the C-123B "Provider."

Ahe

aircraft

is given a spray capability ("UC" designation) by the
installation of the Hayes AA-45 system which consists of a
1,000 gallon internal tank, an operator console, and three
high pressure spray booms. Since most missions are carried

14

�out at low altitudes and low speeds, the performance of the
aircraft is significantly upgraded by the addition of turbojet engines.

The intensity of enemy ground fire in Vietnam

has forced the Air Force to further protect the UC-123K with
additional armor plating for the crew ami engines.

The

DC-123K's travel in fighter escorted flights ranging anywhere from two to seven aircraft, depending on the target
configuration.

Each aircraft dispenses its 1,000 gallon

load in four minutes at less than 150 niles per hour and 150
feet off the ground.

The Hayes ays ten can be adjusted for

variable dissemination rates; however, these rates are
usually between one and one-half gallons to three gallons
per acre.

[Major Pyatt]

Photo # 1: Pour UC-123 aircraft of the 12th Air Commando
Squadron defoliating a jungle area east of Siigon. June 1968
U.S. Array Photograph

15

�2. Delivery By RotaryWing Aircraft (UH-1)
In certain areas, ground commanders are authorized
to conduct local herbicide operations. When CC-123 aircraft
are not available to do the Job or the target is too small
to merit fixed wing sorties, the UH-1 helicopter (commonly
known as the "Huey") can be equipped with an internal tank
and spray booms. In initial operations in RVU, some U.S*
Army nalts used a field expedient which employed a 55-gallon
drum fitted with rubber hoses and sprayers mounted on the
helicopter skids.

The second generation system used in the

UH-1 is the AGAVENCO sprayer, developed by a Las Vegas firm
for use in agricultural work. This system can be mounted in
the aircraft in less than one-half hour and consists of a
200 gallon tank, pump, and pressurized nozzles.
of the Array (DA) Training Circular (TC) 3-16

[Department

1969 ] . The

UH-1 fitted with the AGAVENCO provides the same dissemination rates as the UC-123 but its capacity is considerably
less. Although the system is designed for a 200 gallon
capacity, the combat requirements of two pilots, two door
gunners, and a system operator cut the UH-l's lii't capability
to such an extent that the tank can only be loaded with 100
gallons.

I^TC Rudrowj
The use of the helicopter in RVN for delivery of

herbicides has been far less standard than the operations of
the 12th Spscial Operations Squadron. Since division
comifcanders were the controlling authorities for these
missions in each AO, the methods used varied considerably

16

�throughout the theater.

Ideally, several "Hueys" should be

employed for efficiency's sake. However, since no helicopters were set aside specifically for herbicide missions,
they were normally diverted on a one-by-one basis from other
conibat sorties. The security escorts, the AH-lG ("Huey
Cobra"), faced the same problem, and while a defoliation
helicopter should be supported by two Cobras, on r«any occasions, none were available.
did not curtail the missions.

However, this lac'k of security
\LTC Rudrow and LTC Saiiches]

Photo # 2: UH-1 helicopter taking-off on a defoliation
mission.
U.S. Army Photograph

17

�3. Chemical Agents
ORANGE, WHITE, and BLUE will Toe the agents considered
in this study.

These chemicals do not constitute the

complete spectrum of herbicides, but they were the most
widely used in support of U.S. combat operations in RVN.

Table II-l: Composition and Use of Selected Agents
AGENT

COMPOSTTTQW

USES

ORANGE

5056 2,4-D(r»-butyl.2-4 dicholoroph*".noxyacetate)
50% 2,4,5--7(n-butyl,2,4,5trichorophenoxyacetate)

WHITE

20% Picloraro (4-araino-3,5,6- General defoliation:
trichloropicoline acid) Slower acting but
80% 2,4-D(trisopropanolamine| more persistent than

General defoliations
wangrove, jungle,
and low-land scrub
trees.

ORANGE

BLUE

3 pounds per gallon of
water of:
65?o cacoclylic acid
35% inert ingredients:
sodium chloride, sodium
sulfate, calcium sulfate
and water.

Crop destruction:
Most effective
against grassy plants,
rice, manioc, corn,
and banana trees,

During defoliation operations in RW, agents ORANGE
and WHITE were used interchangeably.

It was found that these

agents did not permanently destroy all vegetation, although
the mangrove swamps still show heavy effects of the spraying.
Recent pictures taken of heavily defoliated areas show
considerable regrowth of foliage in hardwood forests and
along waterways.

The NAS study will address this question

2
DA TC 3-16, Employment of Riot Coatrol Agents, Flaree,
Smoke, Antiplant Agents, and Personnel Detectors in CounterGuerrilla Operations, p. £0-81, April 1 6 .
39
18

�In detail along with other ecological effects of chemical
herbicir?s.

[Tschirley

1963] and [office of Deputy

Assistant Secretary of Defense (ODASD) 1971] ..
4. Coverage and Limitations
The present sprayer systems used in both fixed and
rotary wing aircraft allow variable dissemination of lierMcides. 'rhese rates are as follows:
Table I1-2: Herbicide Dissemination Rates
Mission Type

Rate

Defoliation
Crop Destruction

3ftree gallons/acre
One and one-half to three
gallons/acre
[DA TC 3-16 1969]

The use of herbicides in support of conibat operations
is limited in several respects.

The best time to apply them

is during the particular plant's most active growing period.
While spraying during the dry season (which corresponds to
the non-active period of most plants) does produce defoliation, the vegetation dies at a slower rate.

In ac'lition,

the proper atmospheric conditions must exist to insure
maximum coverage of the aerosol, assuming the aircraft is
flying at the proper speed and altitude. An inversion
temperature gradient and a wind of less than eight knots
insure not only proper coverage of the target but also minimize the probability of drift onto friendly areas.

This is

particularly important in an insurgency environment where
unintentional destruction of the indigenous population's
19

�property and crops would be detrimental to the position of
the counterinsurgent forces.
B.

TACTICAL LAND CLEARING

A tactical land clearing operation is designed to support
the ground tactical forces by denying the enemy any use or
benefit that might be gained from heavily vegetated terrain.
Unlike herbicide missions, a well-planned clearing operation
seeks to not only remove foliage but also the source of it
as well.

This produces an advantage above those received by

defoliation since surveillance is improved in the horizontal
dimension as well as the vertical.

This improvement is

realized by:
1. An increased ground-based anti-personnel
radar capability.
2. Increased visual observation.
3. Improved fields of fire.
4. Physical elimination of potential ambush
sites and base areas.
A secondary benefit derived from land clearing is the
possible economic enhancement of the area. Marketable
tiitiber felled during the operation can be extracte'"- for the
local lumbering industry, and if the tactical situation
pernits, there is the potential for conversion of this
unused land for productive agricultural cultivation.
Pamphlet (Pam) 525-6

1970 ] .

20

iDA

�1. Equipment and Organization
Tactical land clearing revolves around the proper
use of a standard crawler tractor equipped with the Rome K/G
blade and kit assembly. This item of equipment, commonly
referred to as the "Rome Plow," was developed by Ernest
Kissner of Lottie, Louisiana for land reclamation of heavily
wooded tracts. The success of the blade prompted Mr. Kissner
to sell the rights to his equipment to the Rome Plow Company
of Cedartown, Georgia.

Since 1957, it has been produced to

fit all standard sizes and makes of tractors

(Caterpillar,

Allis-Chalroers, International Harvester). The tractor and
Rome blade became the method accepted for pilitary land
clearing in 1966 after a test period at Fort Belvoir,
Virginia and Vietnam of practically all known commercial
clearing equipment. [Rome Plow Company, Training Program
November 19711.
The Rome K/G treedozer, unlike the bulldozer blade
which clears by uprooting, works on the shearing principle
in that the total horsepower of the tractor is applied to
the sharp cutting edge extending the length of the blade.
In addition to the cutting edge, a wedge-like projection,
the "stinger," extends forward from the left of the leading
edge of the blade.

This allows larger trees to be split in

one or more passes before they are actually felled by the
cutting edge.

In order to permit faster operation with less

operator fatigue, a flat sole is mounted on the heel of the
blade to float on the surface of the ground and conform to
21

�topographic irregularities. Through the technique of
shearing the vegetation at ground level or below, its disposal by burning or extraction is much faster because it is
soil free. There is less soil disturbance since the tilted
blade cuts the vegetation rather than uprooting it. [DA
Para 525-6 1970] .
'She "Rome Flew" has become the nucleus of the
recently organized Engineer Land Clearing Company whose
primary mission is, "... to destroy or clear extensive der.i,e
vegetation in critical areas for the purpose of denying its
use by the enemy as bases of operation, supply bases, marshalling areas, ambush sites, and cover and concealment."-5
This unit, part of the U.S. Army Corps of Engineer organization, has thirty medium crawler tractors each equipped with
the Rome kit. It was spawned by the success of the "Rome
Plow" used initially in twos and threes by practically all
engineer elements in RVH. The land clearing role became so
large that in 1969 the Army organized the 62nd Engineer
Battalion to handle the clearing requirements in M_litary
Region III. Usually one of its three plow companies was
placed in support of a divisional clearing mission.

Tha

company was found to be the primary unit for employment
since fragmenting it into smaller elements for prolonged
periods of time resulted in the loss of maintenance posture.
[62nd Engineer Battalion Letter February 1971]
United States Army Combat Developments Command, Table
of Organization and Equipment Number 5-87T - Engineer Land
ClearingConpany, p. 1, 7 February 1969.

22

�Photo #3: Rome K/G blade and protection group on a
Caterpillar D7F tractor.
Rose Plow Company Photograph

23

�2. Clearing Estimates and Limitations
It is virtually impossible to establish exact rates
at which any piece of equipment can clear land.

Such

factors as vegetation type, terrain, climate, enemy situation, and quality of assets available will directly influence this. Accurate estimates require a detailed clearing
reconnaissance to include several "tree counts" for tree
size, diameter of large trees, and secondary growth estimates. The information frcra this reconnaissance can be
placed into one of several forculas developed by the Rose
Plow Company to determine time required per acre cleared.
[Rome Industries Salesgram, 1 September 1971.1

In the event

that'this procedure cannot be followed, the Department of
the Army has established planning estimates for clearing
operations using one land clearing tractor for various types
of cuts:
Table II-3: Land Clearing Estimates
VEGETATION

UNIT

{Equipment-hours/unit)

AREA CLEARING

STRIP CLEARING

LIGHT: Less than
12 inches in diameter Acre

.4

.
6

MEDIUM: 12 to 18
inches in diameter

Acre

.
8

1.3

HEAVY: -Greater than
18 inches in diameter Acre

1.3

2.1

Several factors which constrain tactical clearing
operations are soil trafficability, support requirements.

4
Department of the Army Parphlet 525-6, Land Clearing
Lessons Learned, p. 60, 16 June 1970.
~

24

�and determination of the enemy to resist the land clearing
mission. Since the medium tractor with the Rome kit has a
gross weight of more than 20 tons, the ground must be relatively solid to permit movement.

This would restrict its

use in areas subject to heavy seasonal rainfalls and locations that are inundated on a regular basis, such as
mangrove swamps.

Even if the terrain permits movement of

the tractors, there is always the possibility that it is
interlaced with streams, canals, or steep-sided gullies.
Supporting troops are necessary to install bridging across
these obstacles and assist in tractor recovery operations.
Aviation support is required for proper command and control
of large scale cutting operations, m many cases, the
engineer commander must be airborne to guide the lead
tractors since, in heavy vegetation, the operators' visibility is negligible. Aerial reconnaissance of the cut is
also essential for sound planning and accurate assessment
of the clearing to be accomplished. During RVN clearing
operations, the land clearing companies of the 62d Engineer
Battalion were furnished observation helicopters on the
average of five hours per working day.

|62d Engineer

Battalion Letter, February 1971.J
For immediate protection of the land clearing
company, the desired security force is one armored cavalry
troop or one mechanized infantry company. Foot infantry
would have difficulty in keeping up with the tractors and
would have no protection from falling trees. If the area
25

��Photo # 5: Land clearing with the Rome K/G blade on a D7
Caterpillar tractor.
Rome Plow Cornpany Photograph

27

�C.

"SLASH AND BURN" CLEARING

Indigenous personnel can be hired to assist in many land
clearing operations or to conduct small-scale clearing
efforts on their own ("slash and burn" operations). They
can be eraplo*'ed in clearing vegetation adjacent to lines of
communications (LOG), around support bases, and removing/
burning debris from other operations.

The objectives of

this technique are similar to the tactical land clearing
operations with the additional function of releasing U.S.
troops for more pressing combat roles.
1. Organization
Usually, the personnel for the operations are
recruited and hired by the U.S. force's Civil Affairs staff
working in conjunction with the host country's local and
national labor office. These officials determine the
salaries and working conditions.

They attempt to get job

applicants with previous experience in clearing or lumbering.

The equipiiient, support, and supervision for the

clearers is furnished by the U.S. unit working in the AO.
This system was used by the Army during the Korean
War.

It was designed to help the Republic of Krrea's massive

unemployment problems and assist the allies in accomplishing
tasks requiring unskilled labor.

The Koreans served as

ammunition bearers, porters, kitchen police, and woodcutters.
Its success was such that at the end of the war the Korean
Service Corps (KSC) was formed on a paramilitary basis.
28

�To the present day, the KSC has provided labor augmentation
for the residual United Nations troops that have remained
in Korea.
2. Clearing Estimates and Limitations
Like tactical land clearing, production rates are
dependent upon many variables: morale, health, state of
experience, terrain, crew size, and supervision.

Planners

must also consider the tiice required to transport the
personnel to and froca the clearing sites since security
requirements would eliminate the possibility of remaining
in the area overnight.

The planning rates that have been

established by DA are:
Table I - : Clearing By Hand
I 4
VEGETATION

UNIT

HAN-HOURS PER UNIT

LIGHT: Less than 12
inches in diameter.

Acre

125

MEDIUM: 12 to 18 inches
in diameter.

Acre

350

HEAVY: Greater than 18
inches in diameter.

Acre

600

LIGHT: Same as above but
strip 10 meters wide.*

100 Linear
Meters

25

MEDIUM: Same as above
but strip 10 roaterr. wide.*

100 Linear
Meters

70**

**

*Strip clearing.
**Approxiir.ately 100 man-hours/linear acre and 280 man-hours/
linear acre.
5

Ibid.. p. 55.

29

�The use of "slash and burn" techniques for vegetation
removal is usually limited to secure areas or where major
combat operations are already in progress.

Time serves as

an additional constraint on the method since a great many
cutters are required to clear an area in a short period.
However, it is particularly useful in areas where the soil
trafficability will not support the heavy equipment required
for tactical land clearing.
D.

FIREBOMB1NG

Firebonibing is a method of reducing vegetation by burning
the foliage with incendiary munitions. The primary means to
accomplish this is by dropping drums of thickened fuel
(napalm) from helicopters or fixed wing aircraft.

The

technique is especially applicable to area clearance in locations where there is a definite dry season during the year.
The objectives of firebombing coincide with those of herbicide operations but the results differ in "zhat the trees are
permanently destroyed and not subject to regrowth. The
tactic ./as first used in RVN in 1967 during Operation PINK
ROSE in which Air Force aircraft were employed to drop the
cannisters of napalm on the target areas. Its purpose was
to burn-off enemy infiltration routes in the northern
provinces and base areas in War Zone C and D, all of which
had b^en previously treated with herbicides.

1970 I

30

[McCcnnsll

�1. Organization and Equipment
Authority to burn portions of an AO is usually
delegated to the division commanders. The Array uses the
twin-engine CH-47 helicopter ("Chinook") to conduct firebombing missions. Thickened fuel, consisting of gasoline
Mixed with M-4 fuel thickener, is placed in salvaged 55gallon drums and sling-loaded beneath the CH-47.

Fifteen

to twenty drums are carried in one lift, depending on the
aircraft's fuel load and weather conditions.

When the

aircraft is over the target, the drums are released and fall
in a cluster into the impact area.

The drops are supervised

by a command and control officer in a light observation
helicopter (LOH), and if air assets are available, security
is provided by several helicopter gunships (AH-lG).

JLTC

Rudrow j
2. Coverage and Limitations
Evaluation of the coverage of a firebombing mission
is very difficult since proper burning is subject to many
condition.0. Some of the factors that effect and limit the
coverage are:
(1) Dryness of the vegetation
(2) Wind and temperature
(3) Probability of a drum cluster detonation
upon contact with the ground
(4) Number of drums per lift.

31

�These variables dictate the use of a probabilistic model to
estimate the coverage of any particular firebombing mission.
In addition to the factors mentioned above, firebombing missions are limited by the utilization of the CH-47
in other roles.

The "Chinook" has become the workhorse for

the Army's medium lift tasks. In RVN, it has been extensively used for transportation of artillery pieces and
resupply of forward bases.

Hence, there is a high demand

for the aircraft, and the commander roust decide on which
missions he places the higher priority.

32

�III.

METMDODQGY

The alternatives for this study will be analyzed with
respect to the two primary missions of herbicide operations:
1. Removal of foliage (defoliation) in order to deny
the enemy cover and concealment.
2. Ths destruction of crops in the enemy's territory in
order to curtail his ability to forage off the land. To
accomplish this, costs for each method oust be isolated in
some uniform manner and in units to facilitate a costeffectiveness evaluation for several measures of effectiveness (MOE). The vectors resulting from this evaluation can
then be compared on an intra-systera, inter-system and forcemix basis.
The analysis of the alternatives will take the form of
the major subheadings below. Each of these sections
attempts to amplify the "how and why" of the methodology
used in Chapter IV through VII.
A.

GENERAL ASSUMPTIONS

Implicit in the assumptions for each alternative is the
adherence to the system descriptions of Chapter II. Several
general assumptions are also applicable.
In order to simplify the o-ialysis and the data collection, all alternatives are assisted to have commenced their
operations at the same point in time.

It is also assured

that all systems are in "steady state" and not subject to
33

�the initial erratic fluctuations in costs that new systems
often demonstrate prior to the occurrence of the "learning
curve" phenomena.

At the end of the systems' life, all are

given a zero residual value.
Finally, no adjustments are made to the costs for
inflation. While inflationary pressures have abated slightly, it is doubtful that the price stability of the early
1960's will return in the near future.

This could introduce

some bias when looking at yearly costs, total system cost
(T3C), and investment replacement of primary mission equipment (PME) over the planning horizon.

[Augusta and Snyder

197 oj
B.

PARAMETERS

The planning horizon for the analyses will be ten years.
Like the explicitly stated parameters for each alternative,
this is a reasonable estimate but in no way reflects any
official policy. The reviewer should be cautioned that the
planning horizon and other inputs are optimistic estimates
and adverse conditions car change thea significantly.

Where

a great deal of uncertainty exists as to the parameter
values, upper (U) and lower (L) cost bounds will be specified for each alternative. Most of these bounds reflect the
judgement of men who were involved with these systems during
counterinsurgency operations in RVN.

34

�C.

COST ANALYSIS

All costs will be determined in reference to one unit
equipment (UE) . A UE could be one specially equipped
aircraft, one crawler tractor with the Rome kit, or a crew
of indigenous cutters for "slash and burn* clearing.

With

this in mind, life cycle costs will be identified through a
generalized input structure.

Since no research and develop

ment (KD) costs are encountered, only the following major
cost categories will be investigated:
Investment Cost ( C
1)

Operating Cost (OC)

Procurement Costs

Maintenance

Stock Costs

Modernization

Replacement of Equipment due to
Attrition or Operational Loss
Initial Travel
Transportation

Replacement
Pay and Allowance
Fuel, oil and lubricants (POL)
Replacement Training
Munitions
Security
Special Control
Fisher 197 l

These inputs are used to obtain a system cost (SC) by
evaluating each cost category with respect to the major
subsystems of each alternative. The basic equation used in
the analysis is:

T LT

SC = a L«
i

j

TT

ICi-t + a L. *—
J
i j

OC&lt;&lt;
J

where a_ is a constant to obtain costs in the desired units
(i.e., $/year, ^/mission, or $/day) and ic*j is the jth
investment cost of the ith subsystem. Generally, costs will
be determined in units associated with basic operating tines.
35

�Ground-based systems will be evaluated in terms of dollars
per day and aviation systems in dollars per mission.
Included in the operating cost input program will be
several opportunity costs. Although they'will never be
reflected in tables of costs held by service comptrollers,
they are very real costs due to the scarcity of personnel
and equipment assets in combat. There is difficulty judging
what cost should be attached to a supervisory or security
force that could be gainfully employed in other combat operations, m order to tackle this problem in the study, the
cost assessed will be that operating cost incurred by the
force over the period that it was used.
D.

EFFECTIVENESS CRITERIA AND COST-EFFECTIVENESS MEASURES
1.

Effectiveness C r i t eria

The measures of effectiveness (MOE) should be
closely related to the mission objectives.

However, it is

very hard to quantify the results of any denial operation
because one soon gets into the realra of trying to determine
"why something did not happen."

These types of objectives

force the writer away from "objective-oriented" MOE's and
toward the "performance-oriented" effectiveness criteria.
Two KOE's will be utilized in order that a balanced
presentation of each alternative may be achieved.
a. MOE * 1 - "Area"
The first MOE will be that of "area treated,
cleared or burned per normal operating period."
36

These

�three terras show the different effects that each alternative
has on the terrain. However, they present an evaluation of
each system's effectiveness and give a specific indication
of their performance capability during a normal operating
period.
b. MOE # 2 - Constrained Cost Minimization
This MOE is designed to determine which alternatives can complete a given mission subject to the exigencies
of combat.

It attempts to take a reasonable mission of

denying the enemy cover and concealment in a given area and
requiring that this be completed prior to certain time
limits and within theater asset constraints.

In program

format:
Minimize the cost of denying cover and concealment in
a 6,000 acre base area
Subject to:

(1) Mission accomplishment in 30 days or less.
(2) Mission asset requirements w4thin the
supply capability of the responsible
commander.
A vegetation removal mission was chosen since

these were the roost common of the herbicide missions in RVN.
The figure of 6,000 acres was designated because thij is
approximately 25 grid squares on a 1:25,000 or 1:50,000
topographical map and could easily be a suspected insurgent
base area. Although this is a large scale mission, it is
not unreasonable since there have been defoliation/clearing
operations in War Zone C and other parts of Military Region
37

�Ill in RVN that encompassed larger areas (during Operation
3W3CTIO8 CITY). The effects of reducing the mission size
are also examined in Chapter VIII, Section B.
Constraint # 2 of the program retires the determination of what will be the "supply capability of the responsible coonander." To resolve this, the author will use his
judgement and past experience in RVN to determine whit are
"reasonable" and "unreasonable" asset requirement*? to
accomplish a particular mission.
2. Cost- E ffectIvenes s Measureg

Using the cost measures of the analysis section and
the effectiveness criteria, cost-effectiveness measures can
be developed for each system in dollars per acre.

These

measures can then be segregated into mission categories for
foliage removal and crop destruction with maximum and oiniraura cost limits. These coupled with the cost minimization
v. ctors will help illuminate the differences in the systems,
their costs, and their effectiveness in support of counterinsurgency operations.
E.

PARAMETER SENSITIVITY

Sensitivity analysis will be used to test the parametric
uncertainties in each system. The testing will examine the
system costs as the parameters vary over a reasonable range
of values. Although the only relevant costs are dollar
costs, the sensitivity tables will show dollars and cents.
Certainly, the calculation of costs to the actual pennies
38

�is not relevant or meant to be a serious cost estimate.
However, this is done since they demonstrate the orders of
magnitude of change over the range of the parameter values.

39

�IV.
A.

ANALYSIS OF AERIAL DELITSRY OF HERBICIDES

ASSUMPTIONS

1.

UC-123
a.

Each aircraft has an ejected life of ten years

after modification for herbicide operations.
b.
hours.

[Major Pyatt]

Each sortie has an expected duration of two

[Major Hidalgo]
c.

Flights over a given target consist of between

two and seven h^xbicide aircraft.
d.

Security for each flight consists of four USAF

A-1E "Skyraider" aircraft.

Control for each flight consists

of one forward air controller (FAC) in a USAF OV-10 "Bronco."
[Downs and Scrivner
e,.

1970J

Each UC-123K has a 90 per cent coverage effi-

ciency for its 1,000 gallon load.

{See sensitivity analy-

sis. Sec. E)
2.

UH-1

a.

A variety of "Hueys" haie been employed in RVN.

For this study, use of the UH-1H is assumed.
b.

Each sortie has a duration of one-half hour.

Rudrew]
c.

A flight over a given target consists of one

helicopter.
d.

The AGAVENCO sprayer wJH be the only helicopter-

raounted system considered.

Although the capacity of the

40

�tank is 200 gallons, weight limitations tinder combat
conditions curtail the load,
will be analyzed.
e.

A 100 gallon per mission load

[t,TC Sanchesj

When available, armed helicopter security

consists of two AH-lG "Cobras."
f.

and [DA -re 3-16 1969 ]

[LTC Rudrow]

the OT-lH has a 90 per cent coverage efficiency

for its 100 gallon load.

It is employed under the same

operational and climatic conditions as the UC-123 missions.
{Also see sensitivity analysts, Sec. E)
B.

PARAMETERS

!
•

Flying Hours
Since the DC-123K has a two-hour mission duration,

25 missions per month per aircraft (or 600 hours per year)
will be the study parameter. Data indicates that the sortie
rate varies considerably over a year's operation and that the
use of 25 sorties per month would not be unreasonable [Major
Hidalgo J . A similar number of flying hours per year for the
UH-lH would dictate a sortie rate of 100 missions per month.
However, this is probably less than the normal rate since
the UH-lH has a prograrsed flying-hour limit of up to 960
houis per year in an active combat environment.
Manual (FM) 101-20

[DA Field

1970J . This implies that the effects

of the sortie generation rate for both aircraft should be
examined in a sensitivity analysis (Section E).

41

�2-

Cost Bounds
Bounds on certain portions of the herbicide costs

are set by the variation in security, control, and transportation costs that can occur in normal operations.

These

parameters set the "optimistic and pessimistic" bounds for
system cost. Since the UC-123 flights range from two to
seven aircraft, the security and control cost (for four
A-lE's and one OV-10) must be pro rated in accordance with
the number of herbicide aircraft per flight to obtain a cost
for one unit equipment (UE). Costing the helicopter system
does not present this problem since the operations are
usually conducted with one UH-1 (assumption c&gt;.

Hence, the

security costs for a UH-1 mission can range from zero to the
cost of using two "Cobras" for one-half hour.

The UH-1 has

an additional bound on the i»..3stment cost formed by the
mode of transporting (surface or air) the AGAVENCO system to
the cornbat theater.
C.

COST ANALYSIS

1.

Is_o la t ion o f Re le vant Cos ts
A detailed breakdown of these costs can be found in

Appendix A.
a. UC-123K
Research and Development; None.
Investment Costs for the aircraft subsystem:
(1) Initial procurement of the aircraft is a
sunk cost since the C-123B's were drawn from air assets that
42

�existed in the Air Force inventory. Hence, it will not be
considered.
(2) Jet engine modification:
C-123B to a turbo-jet model (C-123K)i

Conversion of the

$302,732/aircraft.

[Miss Lucky]
Operating Costs for the aircraft subsystem:

[

(1) Operating and nsainteaance (O&amp;M): $7QO,000/
^
Captain Wallace j
(2) Modernization cost: h two per cent per year

cost is incurred by each aircraft for raodernization expenditures.

.02 x 5870,000/aircraft = $l?,400/aircraft/year.

[captain Wallace]
(3) Security costs:
A-1E is $200/AOur.

The operating cost for one~~

Major Sims

The munition expenditures

for one A-iF; are $1250/raission.

f LTC Cooper]

For a two-

hour mission with four A-lE's, the cost amounts to $6600/
mission.
(4) Control costs:

The operating cost for the

OV-10 is $54/liour and $1000/aircraft for a full load of
munitions.

[liTC Monoham 1 This amounts to a control cost
i
J
of $1108/roission.
(5) Combat attrition rates are negligible since
&lt;Nfc

only two aircraft have been lost to enemy fire since 1962.
j Downs and Scrivner

1970 ]

43

�Investment Cost for the aerosol subsystem;
(1) The dispenser mechanisii consists of the
installation of the Hayes AA-45 system at a cost of $37,254/
aircraft.

[Miss Lucky I
(2) Additional armor plating: $19,354/aircraft.

[Miss Lucky]
Operating Costs for the aerosol subsystem;
( ) Maintenance of the dispenser systcs* training
1
the operators, and stocking spare parts are included in the
cost of operating the aircraft.
( ) Cost of herbicides:
2

The USAF is responsible

for procurement of herbicides for all users. The cost of
the agent includes shipment and storage costs.

[Mr. Carter]

AGENT

COST/GALLON

COST/MISSION

WHITE

$7.78

$7,780

ORANGE

$7.24

$7,240

BLUE

$2.31

$2,310

b.

UH-1H

Research and Development: Hone.
Investment Cost for UH-lH; This is a sunk cost
since the helicopter used for herbicide operations is diverted from Army aviation assets on a "need* basis.
Operating Costfor UH-lH;
( ) O&amp;M costs are rated at 15 per cent of the
1
aircraft procurement cost.

JMr. Donaldson] Since the UH-lH

44

�costs $266,578 [DA FM 101-20 1970J , the O&amp;M cost is
approximately $40,000/year.
(2) Crew salaries are not included in Army O&amp;M
estimates.

Normal conibat crew on a UH-1 is two pilots and

two door gunners.

These yearly opportunity costs amount to:

2 x $14,000/officer/year = $28,000/year
2 x $10,000/enlisted man/year = $2Q,000/year [DA Fact
Sheet

1971j and I Major Howe ]
(3) Security costs range from zero (no security)

to $200/mission for two AH-lG "Cobras." (Appendix A)
Investment Costs forthe aerosol subsystem;
(1) Procurement of AGAVENCO system: $7,850
[MT. Drake|
(2) Transportation cost for the AGAVENCO: $545
by ship and $1,937 by aircraft. (Major Howe 1
(3) The expected life of the UH-1H equipped for
herbicide missions is ten years. [ Mr. Donaldson]
Operating Costfor theaerosol subsystem;
( ) The maintenance cost of the AGAVENCO system
1
is nine per cent of the procurement cost: S707/year. [ Mr.
Drake]
(2) The system requires one operator: $iO,000/
year.
(3) Herbicide costs:

45

�AGENT

COST/GALLON

COST/MISSION

WHITE

$7.78

§778

ORAHGE

$7.24

$724

BLUE

$2.31

$231

IW. CarltonJ
2. Yearly Costs
Using the relevant costs and the herbicide parameter,
a yearly system cost can be developed from the formula:

SC = a L, L, ICjj + b Lf L» OCii
J
i
j
i 1
wr«re

a_ is the reciprocal of the expected life (and equal

to the planning horizon) and b

is a dimensional constant

to obtain costs la dollars per year.
a.

Identification of Costs for UC-123K
Investmant Cost = 1/10 (Engine modification +•

spray system + arnor) = $35,934/year.
Operating Cost = O&amp;M cost + Security cost +
Control cost + Agent cost.
The security and control (S&amp;C) costs for a UE on any
particular mission can be found in the following manner:
Security cost (U):

Security cost ( )
L:

$6600/flight
2 aircraft/flight
S6600/fliaht
7 aircraft/flight

_ $3300/aircraft

=

?943/aircraft

(A similar procedure determines the control cost.) Using
the parameter that a UC-123K flies 25 missions per month,
46

�the yearly mission rate would be 300 missions (msn) per
year. A typical calculation, this one for the upper bound
using Agent WHITE, is as fallows:
Operating Cost = §700,000/yr + §17,400/yr + 300rasn/yrx
§33QO/msn + 300 msn/yr x §554/msn + 300 msn/yr x §778Q/rasn =
§4,207,600/year.
Table IV-1: Yearly Costs for UC-123K
(Costs in Millions of Dollars per Year)
AGENT

LOWER BOUND

UPPER BOUND

WHITE

§3.417

$.4
424

ORANGE

§3.257

§4.081

BLUE

§1.777

§2.603

b.

Identification of Costs for UH-1H
Investment Cost - 1/10 (AGAVEHCO Cost +

Transportation Cost) = $979/year (U) or $840/year ( )
L.
Operating Cost = O&amp;M Cost + Security Cost +
Agent Cost.
The UH-1 will fly 100 missions per month.

(Section B) An

upper bound cost using Agent WHITE: Operating Cost §98,707/yr 4- 1200 msn/yr x $200/msn + 1200 msn/yr x $778/msn
« §l,272,307/year.
Table *V-2: Yearly Costs for UH-1H
(Costs in Millions of Dollars per Year)
AGENT

LOWER BOUND

UPPER BOUND

WHITE

§1.033

§1.273

GRANGE

§ .968

§1.208

BLUE

§ .377

§ .617

47

�Table IV-2: Yearly Costs for UH-1H
(Costs in Millions of Dollars per Year)
AGEKT

LOWER BOUND

WRITE

$1.033

$1.273

ORANGE

$ .968

$1.208

BLUE

$ .377

$ .617

c.

UPPER BOUND

Remarks

At this point a total system cost could be
readily identified. However, like the yearly cost, it is
extremely sensitive to the particular input parameters, The
parameter of "missions per year" accounts for a major
portion of the system cost solely by virtue of its multiplicative role in the cost formula.

The reviewer must

consider this when evaluating the systems with respect to
the outlay of funds on a yearly basis for a UE. More
important than the magnitude of the costs involved is the
relative difference between the two systems.
3. Mission Costs
cost of a herbicide mission gives the reviewer
a better insight into the dollars involved for a UE. This
cost is more suitable to relate to an effectiveness
criterion that is oriented toward perfon=ance.
Mission Investment Costt
Summation of the Investment Costs
(Expected Life)x(Number of Xsn/Year)

48

�Mission Operating Cost:
Summation of O&amp;M Costs/year
Number of Msn/Year

Summation of Security, Control,
^ ^ent costs/Mission

fable IV-3: PC-123K Missioa Costs
(Dollars per Hission)
AGENT

LOWER BOUND

OPPER BOUND

1C

OC

SC

1C

OC

SC

WEITE

$120

$11,272

$11,392

$120 $14,025

$14,145

ORANGE

$120

$10.732

$10,852

.'12®

$13,485

$13,605

BLUE

$120

$ 5,802

$ 5,922

$128

$ 8,555

$ 8,675

The costs are not categorized for the helicopter since the
UE-lP investment cost is negligible.
Tal/le IV-4t UH-lH Miss JOB Costs
(Dollars per Mission)
AGENT

LOWER BOUN*?

PPfgR BOUND

WHITE

$861

$1061

ORANGE

$807

$1007

BLUE

$314

$ 514

It is evident after this analysis that the agent
cost comprises a large portion of the system cost for both
alternatives.

It accounts for approximately 50 per cent of

the UC-123K costs and about 80 of the 0«-1 mission cost.
The extent of this can be examined by locking at the two
systems participating in defoliation operations.

If the

cost of the agent is varied from one dollar to ten dollars
per gallon, the effect on "dollars per mission" can be

49

�better illustrated.

This can also allow the reviewer the

opportunity to examine the cost expectation of a sudden
technicological breakthrough in the chemical industry
causing a decrease in prices or if current trends in upward
prices continue.
Table IV-5s Cost Variation Due to Agent Costs
(Dollars per Mission)
COST OF &amp;GEHT

SYSTEM COST

($/Gal)

TJH-1

(S/Msn) UC-123

Hin

D.

Min

183
283
383
483
583
683
783
883
983

1
2
3
4
5
6
7
8
9
10

Max

383
483
583
683
783
883
983

4612
5612
6612
7612
8612
9612
10612
11612
12612
13612

1083
1183
1283

1083

Max

7365
8365
9365
10365
11365
12365
13365
14365
15365
16365

EFFECTIVENESS CRITERIA AND COST-EFFECTIVENESS MEASURES
1.

Effectiveness Criteria
a.

MOE fl - "Area"

This measure of effectiveness, "acres treated
per mission," presents the systems' overall or net effectiveness during a normal operating period.
.
Gallons/Mission
Effectiveness criterion (EC) = e x Gailons/Acre "
where e is the coverage factor.
EC

=

.9

x

For UC-123 operations,

1000 qal/tosn , 30Q
3 gal/acre

50

acres/mission

�EFFECTIVENESS CRITERIA (Acres/Mission)
AGENT

LOWSR BOUND
UH-1H

UC-123

UPPERBOUND
UH-1H

UC-123

WHITE

30

300

30

300

ORANGE

30

300

30

300

BLUE

60

600

30

300

b. MOE # 2 - Constrained Cost Minimizatior
This HOE takes the following mathematical
programming formats
Minimize the cost of defoliating 6000 acres
Subject to:
Mission completion 1 30 days
Assets required 1 Command's supply
capability
In addition to the assumptions of this chapter, several more.
are necessary to restrict the analysis.
(1) Flights by UC-123K's will be examined la
relation to a minimum of two and a maximum of seven aircraft
per flight.
( ) Agent ORANGE will be the defoliant.
2
( ) Spraying must be completed within five days.
3
The last restriction is necessary since herbicides require approximately three to four weeks t3 act on
tropical vegetation. For herbicides to be effective, they
must remove a sufficient amount of foliage to deny the
enemy use of the terrain for base areas and daylight
movement and to permit improved aerial observation.
51

The

�requirement is amplified by the following charts
Defoliant

Rate

1 \fk

2 Vk

1 H° 3 fto

ORANGE

3 gal/acre

1/
98

6 Ho

1 Yr

73/32 89/73 79

66

54

(The figure to the left of the slash represents percentage
of leaves desicated; that to the right represents the
percentage of leaves defoliated.

The single figure is

defoliation.)6
Therefore, it is imperative that the a«ent be
applied quickly to insure naximuin defoliation at the end of
30 days.
2. Cost-Sffeetiveness Hea sures
a. HOE tl

Cost-Effectiveness Measure =
Mission Cost
Effectiveness Criterion
Table IV-6A: Aerial Delivery of Herbicides
(Dollars per Acre)

AGENT

LOWER BOUND

UPPER BOUND

UH-lH

UC-123

UH-1H

UC-123

WHITE

§29

$38

$35

§47

ORANGE

$27

$36

§34

$45

BLUL

$ 5

$10

$17

$29

Breaking these costs into the two primary mission
categories (defoliation and crop destruction), isaxirauro and

House, W. B. and others. Assessment of the Ecological
Effects of Extensive or Repeated Use of Herbicides, p. 141,
Midwest Research Institute, 1967.
'
~~~

52

�minimum limits are formed.

The mission categories facilitate

comparison with the other alternatives.

This is readily

done since ORANGE and WHITE are general purpose defoliants
and BI-UE is exclusively used for crop destruction.

In the

next table, the tgaximuin and ^ntiimaa limits on defoliation
missions are formed by using Agent WHITE'S upper bound and
QRASGE's lower bound.

The uaximum and minimum cost vectors

for crop destruction can be taken directly from Table IV-6A.
Table IV-6B:

Cost-Effectiveness Measures for Aerial
Delivery of Herbicides
(Dollars per Acre)

MISSION

UH-1H

UC-123

MIN

MAX

MIN

MAX

Defoliation

$27

$35

$36

$47

Crop Destruction

$ 5

$17

$10

$29

b. HOE #2

Defoliation of a 6,000 acre area would require
ten flights of two UC-123K's or three flights of seven
IK-123K aircraft (each aircraft covering 300 acres per
mission).

The fiva-day dissemination period could easily

be accomplished even with the smallest flight.

If a

squadron organization existed, the requirement would have
little or no effect.
Upper Bound:
$13,605/aircraft/msn x 2 aircraft x 10 missions =» $272,100.

53

�Lower Bound:
$10,852/aircraft/n»sn x 7 aircraft x 3 nissions - $227,892.
Using the UH-lH's effectiveness criterion of 30
acres per mission, 200 sorties would be required.

This

implies that 100 helicopter flying hours would be needed in
a five-day period. This would be a tremendous drain on the
aviation assets of a division commander and would mean that
he would have to divert five to ten helicopters a day for
the better part of a week to psrlcrs the defoliation task,
Hence, a violation of the second constraint might be
realized.
Table IV-7: Minimum Cost Program For Defoliation
(Costs in Dollars)
SYSTEM

LOWER BOUND

UPPER BOUND

UC-123K

$227,892

$272,100

UH-1B**

$161,400

$201,400

The program constraints make the UH-1 virtually
infeasible for a mission of tteis scale.
E.

PARA1-CETER SENSITIVITY

The sensitivity analysis is presented to determine the
effect of variation of three of the parameterized inputs
for the herbicide alternative. The tests are performed on
the icaximura and minimum limits for the cost-effectiveness
categories in Table IV-6B.
1. Sensitivity of Sortie Generation Rate
a. UC-123 (Table IV-8A &amp; SBj
54

�A sensitivity analysis indicates that this
parameter is not as crucial to the system cost explanation
as one might expect. Examination of the costs indicates
that even at the lower number of sorties per month the
system cost does not experience any appreciable rise. As
flying hours increase past the 600 hour per year mark, the
cost begins to experience an almost linear decrease.

55

�TABLE IV-8A
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UC-123K
SENSITIVITY OF SORTIE GENERATION RATE ($/ACRE)
DEFOLIATION
0 &amp; M COST
MIN
MAX

SYSTEM COST
M|N
MAX

HOURS
PER YR.

INVESTMENT
COST

15.

360.

0.67

41.09

52.07

41.75

52.73

16.

384.

0.62

40.26

51.23

40.88

51.86

17.

408.

0.59

39.53

50.50

40.11

51.09

18.

432.

0.55

38.87

49.85

39.43

50.41

19.

456.

0.53

38.29

49.27

38,82

49.79

20.

480.

0.50

37.77

48.74

38.27

49.24

21.

504.

0.48

37.29

48.27

37.77

48.74

22.

528.

0.45

36.86

47.84

37.32

48.29

23.

552.

0.43

36.47

47.44

36.90

47.88

24.

576.

0.42

36.11

47.08

36.52

47.50

25.

600.

0.40

35.77

46.75

36.17

47.15

26.

624.

0.38

35.47

46.44

35.85

46.83

SORTIES
PER MO.

�TABLE IV-8A (Continued)
SORTIES
PER MO,

HOURS
PER YR.

INVESTMENT
COST

27.

648.

0.37

35.18

46.16

35.55

46.53

28.

672,

0.36

34.92

45.90

35.28

46.25

29.

696.

0.34

34.67

45.65

35.02

46.00

30.

720.

0.33

34.45

45.42

34.78

4.6
57

31.

744.

0.32

34.23

45.21

34.55

45.53

32.

768.

0.31

34, J3

45.01

14.34

45.32

33.

792.

0.30

33.84

44.82

34.14

45.12

34.

816. '

0.29

33.66

44.64

33.96

44.93

35.

840.

0.29

33.50

44.47

33.78

44.76

36.

864.

0.28

33.34

44.32

33.62

44.59

37.

88d.

0.27

33.19

44.17

33.46

4.4
44

38,

912.

0.26

33.05

44.02

33.31

44.29

39.

936.

0.26

32.91

43.89

33.17

44.15

40.

960.

0.25

32.79

43.76

33.03

44.01

OPERATING COST
MIN
MAX

SYSTEM COST
MIN
MAX

�TABLE IV-8B
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UC-123K
SENSITIVITY OF SORTIE GENERATION RATE ($/ACRE)
CROP DESTRUCTION
SORTIES
PER MOT

HOURS
PER YR,

INVESTMENT
COST

OPERATING COST
MIN

MAX

SYSTEM; COST
MIN

MAX

15.

360.

0.67

12.66

33.83

12.33

34.50

16.

384.

0.62

12.22

33.00

11.91

33.63

17.

408,

0.59

11.84

32.27

11.55

32.86

18.

432.

0.55

11.50

31.62

11.22

32.17

19.

456.

0.53

11.19

31.03

10.93

31.56

20.

480.

0.50

1.2
09

30.51

1.7
06

31.01

21.

504.

0.48

10.67

30.04

10.43

30.51

22.

528.

0.45

10.44

29.60

10.21

30.06

23.

552.

0.43

10.23

29.21

10.02

29.64

24.

576,

0.42

10,04

28.85

9.84

29.27

25.

600.

0.40

9.87

28.52

9.67

28.92

Ul

oo

�TABLE IV-8B (Continued)
SORTIES
PER KO.

HOURS
PER YR.

INVESTMENT
COST

OPERATING -COST
MIN.

MAX.

SYSTEM COST

MIN.

MAX.

26.

0.38

9.71

28.21

9.52

28.60

27.

648.

0.37

9.56

27.93

9.38

28.30

28.

672.

0.36

9.42

27.66

9.24

28.02

29.

696.

0.34

9.29

27.42

9.12

27.76

30.
in

624.

720.

0.33

9.17

27.19

9.01

27.52

31.

744.

0.32

9.06

26.97

8.90

27.30

32.

768.

0.31

8.95

26.77

8.80

27.09

33.

792.

0.30

88
.6

26.59

8.70

26.89

34.

816.

0.29

8.76

26.41

8.62

26.70

35.

840. '

0.29

8.67

26.24

8.53

26,53

30.

864.

0.28

8.59

26.08

8.45

26.36

37.

888.

0.27

8.51

25.93

8.38

26.20

30.

912.

0.26

84
.4

25.79

8.31

26.05

39.

936.

0.26

8.37

25.66

8.24

25.91

40.

960.

0.25

8.30

25.53

8.18

25.78

�CHART IV-1:

SENSITIVITY OF SORTIE GENE8ATION RATE (UC-123)
(System Cost (SC) in Dollars/Acre)

C

50..

DEFOLIATION

30 „ _

20 . ..

CROP D E S T R U C T I O N

10 . „

4
360

-I

-4

&amp;0

600

4

720

Plying Hours per Year
60

840

{-&gt;
960

�b.

UH-1H (Table IV-9A &amp; 9B)
fable 9A and 9B show that the costs per acre

fcr defoliation and crop destruction are virtually insensitive to the sortie generation rate of the aircraft.

"The

cause for this is the dominance of the agent cost.

For a

mission flown with Agent ORANGE (lower bound), the cost less
the defoliant is $83 per mission.

Shis condition persists

throughout this analysis.
2.

Sensitivity of Security and Control Costs

a.

UC-123K (Table IV-10)
In the analysis, S &amp; C costs range from $1100

per mission to approximately $3350 per mission.

The lower

spectrum of the scale shows the costs that might be incurred
in a low-intensity environment that would require little or
no security.

The costs above $4000 per mission indicate the

incremental changes when high-performance aircraft are allocated to security roles in lieu of propeller-driven "Slcyraiders."
b.

UH-1H (Table IV-11A &amp; 11B)

c.

Both sets of tables (10 and 11) show the effect

that security has on determining bounds on cost estimates.
They also point out that the difference in Agent WHITE and
Agent ORANGE for a similar security posture is almost
negligible.

61

�TABLE IV-9A
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UH-1
SENSITIVITY OF SORTIE GENERATION RATE ($/ACRE)
DEFOLIATION
SORTIES
PER MO.

HOURS
PER YR.

0 &amp; M COST
MAX.

INVESTMENT
COST

MIN V

SYSTEM COST
MAX.
MIN.

GO.

0.05

28.70

37.17

28.74

37.22

64.

384.

0.04

28.42

36.88

28.45

36.93

68.

cr&gt;
to

360.

408.

0.04

28.17

36.63

28.20

36.67

72.

432.

0.04

27.94

36.41

27.97

36.45

76.

456.

0.04

27.74

36.21

27. 77

36.24

80.

480.

0.03

27.56

36.03

27.59

36.06

84.

504.

0.03

27.40

35.86

27.43

35.90

88.

528

0.03

27.25

35.72

27.28

35.75

92.

552.

0.03

27.11

35.58

27.14

35.61

96.

576.

0.03

26.99

35.46

27.01

35.48

100.

600.

0.03

26.88

35.34

26.90

35.37

104.

624.

0.03

26.77

35.24

26.79

35.26

�TABLE IV-9A (Continued)
SORTIES
PER MO.

HOURS
PER YR.

INVESTMENT
COST

O &amp; M COST
MIN.
MAX.

SYSTEM COST
MIN.
MAX.

108.

648.

0.03

26.67

35.14

26.69

35.16

112.

672.

0.02

26.58

35.05

26.60

35.07

116.

696.

0.02

26.50

34.96

26.52

34.99

120.

720.

0.02

25.42

34.88

26.44

34.91

124.

744.

0.02

26.34

34.81

26.36

34.83

128.

768.

0.02

26.28

34.74

26.29

34.76

132.

792.

0.02

26.21

34.G8

26.23

34.70

136.

816.

0.02

26.15

34.62

26.17

34.64

140.

840.

0.02

26.09

34,156

26.11

34.58

144,

864.

0.02

26.04

34. 90

86.03

34.52

140.

883.

0.02

25.99

34.45

26.00

34.47

152.

912.

0.02

25.94

34,40

25.95

34.42

156.

936.

0.02

25.89

34.36

25.91

34.38

160.

960.

0.02

25.85

34.31

25.86

34.33

�TABLE IV-9B
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UH-1
SENSITIVITY OP SORTIE GENERATION RATE (§/ACRE)
CROP DESTRUCTION
SORTIES
PER MO.

HOURS
PER YR.

INVESTMENT
COST

O &amp; M COST

MIN.

MAX.

SYSTEM COST

MIN.

MAX.

60.

360.

0.05

6.13

18.94

6.15

18.98

64.

384.

0.04

5.99

18.65

6.01

18.69

68.

408.

0.04

5.87

18, 10

5.88

18.44

72.

432.

0.04

5.75

18,17

5.77

18.21

76.

456.

0.04

5.65

17.97

5.67

18.01

80.

480.

0.03

5.5b

3,7.79

5.58

17.83

84.

504.

0.03

5.4Q

17.63

5.50

17.66

88.

528.

0.03

5.41

17.48

5.42

17.51

92.

552.

0.03

5.34

17.35

5.42

17.51

96.

576.

0.03

5.28

17.22

5.29

17.25

600.

0.03

5.22

17.11

5.23

17.14

100.

�TABLE IV-9B (Continuea)
SORTIES
PER MO^

HOURS
PER YR.

INVESTMENT
COST

O &amp; M COST

SYSTEM COST

MIN.

MAX.

MIN.

MAX.

104.

624.

0.03

5.17

17.00

5.18

17.03

108.

648.

0.03

5.12

16.91

5.13

16.93

112.

672.

0.02

5.07

16.81

5.08

16.84

116.

690.

0.02

5.03

16.73

5.04

16.75

120.

720.

0.02

4.99

16.65

5.00

16.67

124.

744.

0.02

4.96

16.58

4.96

16.60

120.

768.

0.02

4.92

16.51

4.93

16.53

132.

792.

0.02

4.89

16.44

4.90

16.46

136.

816.

0.02

4.86

16.30

4.67

16.40

140.

840.

0.02

4.83

16.33

4.84

16.34

144.

864.

0.02

4.80

16.27

4.81

16.29

148.

888.

0.0?

4.78

16.22

4.78

16.24

152.

912.

0.02

1.75

16.17

4.76

16.19

1S6.

936.

0.02

4.73

16.12

16.14

160.

960.

0.02

4.71

16.08

4.74
4.71

Ul

16.10

�CHART? IV-2:

SENSITIVITY OF SORTIE GENERATION RATE (UH-1)
(Systes Cost {SC&gt; in Dollars/Acre)

SC

DEFOLIATION

30,.

25..

CROP

10..

360

480

DESItUCIIOH

600

Flying Hours per Year

�TABLE IV-10
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UC-123K
SENSITIVITY OF SECURITY &amp; CONTROL COST

($/MSN)

DEFOLIATION
SECURITY + CONTROL = TOTAL S &amp; C COST

SYSTEM COST
($/ACRE)

(S/MSN)
HIS.

0.
600.
1200.
10.
80
2400.
3000.
3600.
4200.
40.
80
50.
40
60.
00
6600.

0
100
200
300
400
500
600
700
800
900
1000
1100

0
.
700.
10.
40
2100.
2800.
3500.
40.
20
40.
90
5600.
6300.
70.
00
7700.

MAX.

32.50
34.84
37.17
39.50
41.84
44.17
46.50
48.84
51.17
53.50
55.84
58.17

34.30
36.64
38.97
•'•1.30
43.64
45.97
48.30
50.64
52.97
55.30
57.64
59.97

8.04
9.20
10.37
11.54
12.70
13.87
15.04
16.20
17.37
18.54
19.70
20.87

16.07
18.40
20.74
23.07
25.40
27.74
30.07
32.40
34.74
37.07
39.40
41.74

CROP DESTRUCTION

0.
600.
1200.
1800.
2400.
3000.
3600.
4200.
4800.
5400.
60.
00
6600.

0
100
200
300
400
500
500
700
800
900
1000
1100

0.
700.
1400.
21CO.
2800.
3500.
4200.
4900.
5600.
6300.
70.
00
7700.

67

�TABLE IV-11A
SENSITIVITY ANALYSIS... HERBICIDE DELIVERY BY 13H-1
SENSITIVITY OF SECURITY COSTS
DEFOLIATIGS
SECUKI7V COST ($/KSN)

SYSTEM COST ($/ACRS)

Mat.
0.
10.
20.
30.
40.
50.
(0.
70.
80.
90.
100.
110.
120.
130.
140.
150.
160.
170.
180.
190.
200.
210.
220.
230.
240.
250.
260.
270.
280.
290.
300.

MAX.

26.90
27.24

28.70
29.03

27.57
21. y&amp;

28.24
28.57
28.90
29.24

2S.57
25.90
30.24
30.57

30.90
31.24
31.57
31.90
32.24
32.57

32.90
33.24

33.57
33.90

34.24
34.57
34.90
35.24
35.57
35.90
36.24
36.57
36.90

29.37
2S.70
30.03
30.37
30.70
31.03
31.37
31.70
32.03
32.37
32.70
33.03
33.37
33.70
34.03
34.37
34.70
35.03
35.37
35.70
36.03
36.37
36.70
37.03
37.37
37.70
38.03
38.37
38.70

�TABLE IV-11B
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UH-1
SENSITIVITY OF SECURITY COSTS
CROP DESTRUCTION
SECURITY COST

SYSTEM COST
(S/ACRE)

(S/KSN)
MIN.

0.
10.
20.
30.
4.
0
50.
6.
0
70.
8.
0
9.
0
100.
110.
120.
130.
140.
150.
160.
170.
180.
190.
200.
210.
220.
230.
240.
250.
260.
270.
280.
290.
3QO.

MAX,

5.23
5.40
5.57
5.73
5.90
6.07
6.23
6.40
6.57
6.73
6.90
7.07
7.23
7.40
7.57
7.73
7.90
80
.7
8.23
8.40
8.57
8.73
8.90
9.07
9.23
9.40
9.57
9.73
9.90
10.07
10.23

10.47
1.0
08
11.13
11.47
11.80
12.13
12.47
12.80
13.13
13.47
13.80
14.13
14.47
1.0
48
15.13
15.47
15.80
16.13
16.47
16.80
17.13
17.47
17.80
18.118.47
18.80
19.13
19.47
1.0
98
20.13
20.46

�3. Sensitivity of Effectiveness Criterion (Table IV-12
and Table IV-13)
These tables demonstrate the effect on system cost
when commanders insist on conducting herbicide operations
when conditions such as temperature, wind, and weather are
less than favorable.
4. Remarks
Prior to completing the analysis, the effect of
variation of the agent cost in terms of dollars per acre c .
?n
be investigated.

(Reference Table IV-5) These show the

dominance of the agent costs.
Cost Variation Due to Agent Costs
(Cost in Dollars per Acre)
COST OF AGENT

§1

UC-123 ($/ACRE)

M1N.

§ 2
$ 3
$4
$ 5
$ 6
$7
$ 8
$9
§10

UH-1 ($/ACRE)
MAX.

MIK.

MAX.

$13

$15
$19
$22
$25
$29
$32
$35
$39
$42
$45

$25
$28
$31
$35
$38
$41
$45
$48
$51
$55

$ 6
$ 9

$16
$19
$23
$26
$29
$33
$36
$39
$43

$13
$16
$19
$23
$26
$29
$33
$36

70

�SABLE IV-12
SENSITIVITY ANALYSIS - HERBICIBg DELIVERY BY UC-123
SENSITIVITY OP EFFECTIVENESS OF COVERAGE
DEFOLIATION
COVERAGE
(ACRES/MSB)

SYSTEM COST
(I/ACRE)

% EFFECTIVE

KIN.
220.
230.
240.
250.
260.
270.
280.
290.
300.
310.
320.
330.

49.33
47.18
45.22
43.41
41.74
40.19
38.76
37.42
36.17
35.01
33.91
32.89

66.0
69.0
72.0
75.0
78.0
81.0
84.0
87.0
90.0
93.0
96.0
99.0

MAX.
64.30
61.50
58.94
56.58
54.40
52.39
50.52
48.78
47.15
45.63
44.20
42.86

CROP DESTRUCTION
COVERAGE
(ACRES/MSN)
MIN.

220.
230.
240.
250.
260.
270.
280.
290.
300.
310.
320.
330.

SYSTEM COST
($/ACRE)
MIN.

6.
60
6.
90
72.0
75.0
78.0
8.
10
8.
40
8.
70
9.
00
93.0
9.
60
9.
90

71

MAX.

13.46
12.87
12.34
11.84
11.39
10.97
10.58
10.21
9.87
9.55
9.25
8.97

MAX.

40
4.
460.
480.
50.
0.
520.
540.
560.
580.
60
0.
620.
640.
650.

EFFECTIVE

39.43
37.72
36.15
34.70
33.37
32.13
30.98
29.91
28.92
27.98
27.11
26.29

�CHART IV-3: SENSITIVITY OF EPFECTIVE2GSS OF COVERAGE (UC-123)

S60

$50 ' ~

S401--

S 3 0 --

S 20 . .

CROP

DESTRUCTION

S 10 ..

100

Percentage of Effectiveness
72

�TABLE IV-13
SENSITIVITY ANALYSIS - HERBICIDE DELIVERY BY UH-1
SENSITIVITY OF EFFECTIVENESS OF COVERAGE
DEFOLIATION
COVERAGE
(ACRES/MSN)

SYSTEM COST
($/ACRE)

% EFFECTIVE

MIN.

22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

36.68
35.09
33.62
32.28
31.04
29.89
28.82
27.83
26.90
26.03
25.22
24.45

66.0
69.0
72.0
75.0
78.0
81.0
84.0
87.0
90.0
93.0
96.0
99.0

MAX.

48.23
46.13
44.21
42.44
40.81
39.30
37.90
36.59
35.37
34.23
33.16
32.15

CROP DESTRUCTION
COVERAGE
(ACRES/MSN)
MIN.

22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

SYSTEM COST
($/ACRE)
MIN.

66.0
6.
90
72.0
75.0
78.0
81.0
8.
40
87.0
90.0
93.0
96.0
99.0

73

MAX.

7.14
6.83
6.54
6.28
6.04
5.81
5.61
5.41
5.23
5.06
4.91
4.76

MAX.

44.
4.
6
48.
50.
52.
54.
56.
58.
60.
62.
6.
4
66.

EFFECTIVE

23.37
22.35
21.42
20.56
19.77
19.04
18.36
17.73
17.14
16.58
16.06
15.58

�CHART IV-4:

SENSITIVITY OF EFFECTIVENESS OF COVERAGE (UH-1)
(System Cost (SC) in Dollars/Stare)

sc
,k

$50

$40 •

$30--

$20 ,

$10.

CROP

DESTRUCTION

-I

70

80

90

100

percentage of Effectiveness
74

9-

�V.
A.

TACTICAL LAKD CLEARING

ASSUMPTIONS

1. The vehicle examined will be the D7E/D7F medium
crawler tractor (made by the Caterpillar Tractor Company)
equipped with the Rone K/G clearing blade and protection

kit.
2. The expected life of the tractor under combat
conditions is two years.

| Major BennettJ The expected life

of the blade and protection kit is one year.

I 62d Engineer

BattalionJ
3. A land clearing company has 25 of its 30 medium
tractors operational at any one time.

I Planning factor from

DA Pam 526-6 197oJ
4. Security forces consist of one armored cavalry
troop or a comparable-size mechanized infantry unit.
[Major Bennett! The operation is controlled by the
commander who is airborne in a light observation helicopter
(LOH).
5. Crops are considered under the category of light
vegetation.
6. The discount rate is ten per cent.
B.

PARAMETERS

1. Utilization
The operating time for

^ Rome-equipped tractor

will be eight hours per day. .. &gt;rmally, these vehicles work
75

�in tine field for 45 days prior to returning to their base
areas for a 15-day "stand down" and maintenance period.
[&amp;2d Engineer Battalion Letter, February 1971j This implies
a 75 per cent work factor and 270 work days per year.
2.

Cost Bounds

a. Investment Cost
The investment cost for a tractor is bounded by
the consideration of inherited assets.

When the Rome

clearing blade was introduced in RVN, the tractors "in
country" were equipped with bulldozer blades. These blades
were simply converted by unit maintenance personnel. In
other situations, the kits and tractors were sent to RVN to
form land clearing units.

Thus, the upper bound considers

procurement of the initial tractor while the lower bound
considers the initial tractor to be a sunk cost.
b. Operating Cost
The operating costs are bounded by the security,
control, and readiness postures of the clearing unit.

The

desired security for a land clearing company is an armored
cavalry troop while a mechanized infantry company (-} is a
less desired but acceptable replacement. 1 DA Pam 525-6
1970J The security costs will be considered to range from
$130 per day to $80 per day for a UE.

(Appendix B) The

control costs are directly proportional to the use of the
LOU that is attached to the land clearing company during
clearing operations.

The attachment can be from several
76

�hours to all day. f62d Engineer Battalion 11 April
197 1]

The unit readiness rating determines the
equipment and personnel manning levels.

High ratings

dictate the assignment of two operators per tractor. However, during periods of budgetary austerity or when the
manpower pool cannot support this requireoent. this is
lowered to the assignment of one operator per tractor.
FuSACDC TOE 5-58T 1969^j
C.

COST ANALYSIS

1.

Isolation of Relevant Costs (Appendix Bj
a.

Investment Cost
(1) Investment cost for D7 Tractor.

This

investment cost is bounded by the requireraent to procure
the initial tractor.

Additionally, the expected life of

the D7 dictates replacement across the ten year planning
horizon.

Since replacement is necessary, the planner roust

consider the present value cf the dollars spent in order
for an equitable comparison to be made with the other
alternatives.

01

2

The replacement schedule will be:

345

67

8

9 10

The present value coefficients will be:
8
8
PV1 =

- _ = 3.5404 and PV2 =
£o (1 + r) 1
^

for i an even integer and r = .10.
77

--—j = 2.5404
( I f r) 1

I Hiishleif er

1970J

�D7 procurement cost:

$32,916

[DA Supply Bulletin (SB)
700-200 197l]
$ 2,400 [DA DCS, Logistics (LOG)
$35,316 1971]
(Appendix B)

Itotal -

Upper bound on the investment cost:

3.54 x $35,316=$125,019

Lower bound on the investment cost:

2.54 x $35,316=$ 89,703

(2) Investment cost for the Rome K/G blade and
kit.

The blade and kit have an expected life of one year in

cosbat which means purchase from time zero to the end of
year nine.

9
l

Z

4 n
i=0

i » 0,1,2,

_. _ 6.759 where

r = .10 and

(1+r)

,8,9.

Procurement cost:
$ 7,623
Transportation to RVN: $ 900
Total =
$ 8,523

[DA SB 700-200
fpA DCSLOG 197ij
(Appendix B)

Investment cost: 6.759 x $8,523 = $57,607.
(3) Investment cost due to combat attrition.
The Rome-equipped tractors of the 62d Engineer Battalion
(Land Clearing) have experienced a 25 per cent attrition
rate when engaged in tactical clearing.

[Major Bennett]

This would mean the replacement of the tractors and kits on
a yearly basis. The present value "ill be:
9
PV4 = )

r

= 5.759 where

~ (i+r)i

i - 1,2,...,8,9.

r « .10

and

The investment cost for a UE is:

5.759 x .25 x ($35,316 + $8,523) = $63,117.

78

�(4) The total investment a-jrtorized over the
planning horizon is §24,574 per year (U) and 521,043 per
year ( )
L.
b. Operating Cost
(1) Hourly costs. Unless otherwise noted, the
costs listed here come from the caterpillar Performance
Handbook.
Fuel:

(Light Vegetation) 5.5 gal/hr x $.15/gal * $.83/hr
(Medium Vegetation)

7.0 gal/hr x $.15/gal = $1.05Ar

(Heavy Vegetation) 9.0 gal/lir x $.15/gal = $1.35/hr
Lubricants and filters; $.33/hr.
Tractor repairs:

Using the Caterpillar repair factor, th«

repair cost would be $4.60 per hour. However, a review of
the data furnished by Major Bennett indicates that $7.00
per hour is a more realistic figure.
Rome blade and kit repairs:

$1.8Q/hr. 1 Major Bennett)

Total hourly costs:
Heavy vegetation

Medium Vegetation

Light Vegetation

$10.48

$10.18

$9.96

(2) Daily corts.
Operators' salaries:

Security cost:

Control cost:

$55 (U)

$130

$6 (U)

$27 (L)

(U)

$80 (L)

$4 (L)

(Appendix B)
2. Daily Costs
1C = Yearly cost/365 days and OC = 8 hours/day x
Hourly cost + Summation of Daily Costs.

�Tab le V-lj Daily Costs
(Dollars per Day)
VEGETATION

LOWER BOUND
1C

OC

UPPER BQUJJD

SC

1C

OC

SC

Light

$58

$191 $249

$67

$271 $338

Medium

$58

$193

$251

$67

$273

$340

Heavy

$58

$195

$253

$67

$275

$342

3.

Yearly Costs
Investment cost:

Operating coxtt

365 days/year x investment cost/day.

270 days/year* x Operating cost/day.

*

Tractors work 270 days per year (Section B ) .

Table V-2: Yearly Costs
(Dollird per Year)
VEGETATION

LOWER BOUND

UPPER BOUND

1C

OC

SC

1C

OC

SC

Light

21,043

51.570

72.613

24,574

73,170

97.744

Median

21,043

52,110

73,153

24.574

73,710

98,284

Heavy

21.043

52,650

73.693

24,574

74,250

96.824

D.

EFFECTIVENESS CRITERIA AND COST-F-FFEfTIV'^SS MEASURES
1.

EffectivenessCriteria
a.

KOE it 1 - "Area"
This HOE considers the system's net effective-

ness during a normal day's operation.

The criteria takes

into consideration the three classifications of vegetation
and the two principal types of cuts.
80

�__, . .
_ .. ,
Hours available
Effectiveness Criterion = •- , •. —•
Clearing rate
Using the clearing rates from Table II-3, the effectiveness
criteria for a UE can be obtained.
Table V-3t Effectiveness Criteria for One Tractor
(Acres per Day)
VEGETATION

AREA CLEARING

STRIP CLEARING

Light

20

13.33

Medium

10

6.15

Heavy

6.15

3,8

b. KOE # 2 - Constrained Cost Minimization
Minimize the cost of clearing 6000 acres
Subject to:
Mission completion £ 30 days
Assets required

£ Ability of commander to supply

In order to examine the performance of the land clearing
operation under constrained cost rsiniraization, several
additional assumptions are necessary:
(1) Vegetation is either categorized as heavy or
medium.
(2) Area clearing is required.
(3) Cost per day is based on 30 tractors in the
unit although only 25 are operational.
( ) Land clearing cornpany has a high readiness
4
rating and security is provided by a cavalry troop (i.e.,
upper bound cost figures for heavy and medium area clearing
will hold). Area clearing rates for a land clearing company
8t

�with 25 of its 30 mediura tractors conducting sustained
operations are:
Heavy vegetation

Medium vegetation

100 acres/day

250 acres/day
j . Para 525-6
p

1970J

2. Cost-Effectiveness Measures

a. KOE #1
Table V-4:

Tactical Land Clearing

ollars per Acre)
VEGETATION

AREA CLEARING

STRIP CLEARING

Lower
Bound

Upper
Bound

Lower
Bcund

Upper
Bound

Light

$12

$17

$19

$25

Medium

$25

$34

$41

$55

Heavy

$41

$56

$66

$90

The raission categories must take into consideration the terrain sensitivity of this alternative. The
Biinisuxn cost for both land clearing and crop destruction
are those costs incurred during light area clearing while
tl»e -axirouro costs for land clearing are those that occur
tiurir.g heavy strip clearing (sasiRuiB costs for crop destruction come during light strip clearing).

82

�Table V-5: Cost-Effectiveness Measures forTactical Land
Clearing
(Dollars per Acre)
MISSION

MINIMUM

MAXIMUM

Land Clearing

$12

$90

Crop Destruction*

$12

$25

*fhe Rome-equipped tractor is lieited to areas where crops
grow on trafficable terrain,

This eliminates many paddy-

grown crops from this type mission.

b. MOB # 2
As pointed out previously, a medium land clearing
company can clear 100 acres per day in heavy vegetation and
250 acres per day in medium vegetation.

The time constraint

on a 6,000 acre mission would require two companies working
for 30 days in heavy vegetation and one company working for
24 days in medium vegetation.

The cost per day for a

company are:
Heavy vegetation - $10,260

Medium vegetation - $10,200.

The cost in_ doj-lar^ for this KOS is:
UPPER BOUND:
LOWER BOUND:
E.

$615,600
$244,800

PARAMETER SENSITIVITY
1.

Utilization

(Table V-6 A,B, &amp; C)

The tables show the variability in costs (dollars
per acre) that occur in accordance with the operational

83

�hours per day of each vehicle.

The tables indicate the

importance of a high utilization factor, consistent with the
operators' and support elements' ability to perform the
required daily maintenance on the tractors.
2. Security (Table V-7A, B, &amp; C)
fluctuation in security cost demonstrates the
effect on system cost when the commander varies his security
posture from no protection to that equivalent of a reinforced
armored cavalry troop.

84

�TABLE V-6As

MAX COST - LAND CLEARING
LYSIS - TACTICAL LAND CLEARING
IIPMENT UTILIZATION - STRIP CLEARING
Heavy- Clearing

UTILIZATION
{HOURS/DAY)

R&amp;DCOST

5.0

0.00

28.28

5.5

0.00

6.0

INVESTMENT
COST

C &amp; M COST

SYSTEM COST

102.14

130.42

25.71

94. a 6

120.57

0.00

23.57

88.79

112.35

6.5

0.00

21.75

83.65

105.40

7.0

0,00

20.20

79,35

99.45

7.5

0.00

18.85

75.43

9 4.20

8.0

0.00

17.67

72.09

89.77

8.5

0.00

16.63

69.15

85.78

9.0

0.00

15.71

66.53

82.24

9.5

0.00

14.88

64,18

79.07

10.0

00
.0

14.14

62.08

76.22

10.5

0.00

13.47

60. 17

73.63

11.C

0.00

12.85

58.43

71.29

11.5

0.00

12.30

56.85

69.14

12.0

0.00

11.78

55.40

67 . 18

GO

**

�TABLE V-6BJ

MAX. COST -CROP DESTRUCTION

SENSITIVITY ANALYSIS - TACTICAL LAND CLEARING
SENSITIVITY OF EQUIPMENT UTILIZATION - STRIP CLEARING
Light Clearing
LIZATION
nm
5.0
5 .5
6.0

R ft.»

COST

INVESTMENT
cor.T

9 *•

M COBT,

fYSTEty coa-tf
36.95

0.00

8.08
7.35

8
26 . 7
26 .79

0.00

6.73

25 .06

31.79

6.22

7.
0

0.00
0.00

5 .77

23 .59
22 .33

29.80
28. 10

7.5

0.00

5.39

21 .24

26.63

8.0

0.00

5.05

20 .29

25.34

8.5

0.00

4.75

19 . 4
4

24.20

9.
0

0. 0
0

4.49

18 .70

23.18

9.5

0.00

4.25

18 .03

22.28

10 .0
10 .5

0.00
0. 0
0

4.04
3.85

17 .42
16 . 8
8

21.46
20.73

11 .0

0
0. 0

3.67

16 .38

20.06

11 .5

0.00

3 .51

15 .93

19.44

12 .0

0.00

3 .37

15 ,52

18.88

6.5

0.00

34. 14

�TABLE V-6BJ

MIN. COST - CROP DESTRUCTION AND LAND CLEARING

SENSITIVITY ANALYSIS - TACTICAL LAND CLEARING
ENSITIVITY OF EQUIPMENT UTILIZATION - AREA CLEARING
Light Clearing
INVESTMENT
COST

O &amp; M COST

SYSTEM COST

0.00
0.00
0.00

4.61
4.19

12.90
12.09

17.51
16.28

3.84

11.41

15.25

6.5

0.00

10. &amp;*

7.0

0.00

3.55
3.29

10.35

14.39
13.64

7.5

0.00

3.07

9.93

13.00

8.0

0.00

2.88

9.55

12.44

8,5

0.00

9.0

0.00

2.71
2.56

9.23
8.94

11.94
11.50

9.5

0.00

8.67

11.10

10.0

0.00

2.43
2.31

8.44

10.75

10.5

0.00

2.20

10.42

11.0

0.00

2.10

8.23
8.03

11.5

0.00

2.01

7.86

9,86

12.0

0.00

1.92

7.70

9.62

UTILIZATION
HOURS/DAY

5.0
5.5
6.0

3

R 6, n COST

10.13

�CHART V-l: SENSITIVITY OF TRACTOR UTILIZATION
(System Cost (SC) in Dollars/Acre)

S120--

S100- -

SCO..

LAND C L E A R I N G

S60 • •

s-io..

S20.
•4CROP
/DEST.
(L)- LC AND

CD

1
5

6

1-

9

8

10

Utilization - (Hours/Bay)
88

11

T2

�TABLE V-7A:

MAX. COST - LAND CLEARING

SENSITIVITY ANALYSIS - TACTICAL LARD CLEARING
SENSITIVITY OF SECURITY COST

STRIP CLEARING

Heavy Clearing
SECURITY COSTS
(S/DAY)

SYSTEM COST
($/ACRE)

0.

55.64

10.

58.2?

20.

6.9
08

30.

63.52

40

6.4
61

50.

68.77

60.

71.39

70.

74.02

80.

76.64

90.

79.27

100.

81.89

110.

84.52

120.

87.14

130.

8.7
97

140.

92.39

150.

95.02

160.

97.64

170.

100.27

180.

102.89

190.
200.

105.52
108.14
89

�TABLE V-7B:

MAX. COST - CROP DESTRUCTION

SENSITIVITY ANALYSIS - TACTICAL LAND CLEARING
SENSITIVITY OF SECURITY COST

STRIP CLEARING

Light Clearing
SECURITY COSTS
CS/DAY)

SYSTEM COST
($/ACRE)

0.

15.59

10.

16.34

20.

17.89

30.

17.84

40.

18.59

50.

19.34

60.

20.09

70.

20.84

80.

21.59

90.

22.34

100.

23.09

110.

23.84

120.

24.59

130.

25.34

140.

26.09

150.

2.4
68

160.

27.89

170.

28.34

180.

29.09

190.

2.4
98

200.

30.59

90

�TABLE V-7C:

MIN. COST - LANE) CLEARING AMD CROP DESTRUCTION

SENSITIVITY ANALYSIS - TACTICAL LAND CLEARING
SENSITIVITY OP SECURITY COST

AREA CLEARING

Light Clearing
SYSTEM COST
($/ACREj

SECURITY COSTS
($/DAY)
0
.

84
.4

1.
0

89
.4

20.

9.44

30.

9.94

4.
0

10.44

50.

1.4
09

6.
0

11.44

70.

11.94

8.
0

12.44

90.

1.4
29

100.

13.44

110.

13.94

120.

14.44

130.

14.94

140.

15.44

-

150.

15.94

160.

16.44

170.

16.94

180.

17.44

190.

17.94

200.

1.4
84

91

�VI. AHALYSIS OF "SLASH AND BURN" CLEARING
A.

ASSUMPTIONS

1. A crew consists of 45 men with one U.S. enlisted man
as supervisor.

All crew members are considered workerr

since no allowance is made for any internal chain of command
axaong the personnel.

[ Mr. Underwood!

2. Payraant of the indigenous cutters is consistent with
those rates paid in Military Region IV in the fall of 1970.
3. This type of clearing takes place in secure areas or
where security is provided by units already engaged in major
land clearing operations.
4. The U. S. units provide transportation for the
workers to and from the clearing site.
are drawn from current inventories.

Tools for the cutters

[Mr. Underwood I

5. Crops fall into the category of light vegetation.
While the first four statements can be categorized a"
"assumptions," they all have basis in fact.

Mr. Elton

Undersood of the Array's Engineer Strategic Studies Group
verified these on a trip to RVN in May and June of 1971.
The data he returned with contained detailed information on
a U.S.-sponsored operation in An Kuyen Province on the Cau
Mau Peninsula during the period September to December 1970.
However, their inclusion as assumptions is- meant to preclude
their being taken as policy for MACV as a Ahole.

92

�B.

PARAMETERS

1. Tha utilization parameter will be in units of "hours
per day."

For this portion of the study, a utilization

factor of eight hours per day and 270 work days per year
will be used. This corresponds to the utilization rates of
Chapter V. However, both of these inputs ar3 part of the
working conditions that are agreed upon by the U.S. Civil
Affairs office prior to hiring the civilian crews.
2. Ccst Bounds
The bounds on each method of cutting and each type
of vegetation are set by the maintenance and transportation
costs. These costs can range from zero to some preset value.
The cost for maintenance of the workers* tools and equipment
will be set at five collars per crew per day. The transportation cost will be ten dollars per crew per day (based on
the utilisation of two trucks for approximately one hour per
day).
C.

COST ANALYSIS

1. Isolation of Relevant Costs
The only costs incurred by this method of clearing
are operating costs.

The only investment cost would ba the

procurement of tools, but by assumption # 4, these are sunk
costs.
a. Salaries
Each man is paid 200 piasters per day and
furnished one meal at a cost of 37 piasters per day.

�JKr. Underwood! This amounts to approximately $.86 per man
or $38.80 per crew per day based on the 197Q exchange rate
of 275 piasters to one U. S. dollar.
b. Supervision
The opportunity cost for using one U. S. enlisted
man as a supervisor is $10,000 per year or $27 per day.
I Major Howe]
c.

Transportation
In some cases, the crews could walk from their

assembly points to the clearing sites.

If this were not

feasible, two trucks would be needed for approximately an
hour each day to transport the crews. Cost:
(Irt or zero ( )
L.

$10/crew/day

(Section Bj

d. Maintenance
Cost:

$5/crew/day (U) or zero ( )
L.

(Section B)

2. Daily Costs
Daily cost = Crew salaries +• Supervision -f Transportation + Maintenance
Upper Bound: $81 per crew per day
Lower Bound: $66 per crew per day
3. Yearly Costs
Yearly cost = 270 days/year x Cost per day
Upper Bound: $21,870 per year
Lower Bound: $17,820 per year

94

�D.

EFFECTIVENESS CRITERIA AND COST-EFFECTIVENESS MEASURES
1.

Effectiveuess Criteria

a. HOE # 1 - "Area"
This MOE presents the system's net effectiveness
during a normal day's operation.

Since this alternative is

sensitive to the three classifications of vegetation and two
types of clearing (strip and area), six criteria will be
determined.
,
Hours available x Crew size
Effectiveness Criterion (EC, —€iearjLng Rate
The clearing rates are obtained from Table II-4. For light
area clearing:
„,
EC =

8 hr/dav x 45 men
. „„
.,
-£—«
= 2.88 acres/day
125
roan-hours/acre

Table VI-1:

Crew EffectivenessCriteria
(Acres per Day)

VEGETATION

AREA CLEARING

Light

2.68

3.6

Medium

1.0

1.3

.5

.5

Heavy
b.

STRIP CLEARING

MOE # 2 - Constrained Cost Minimization
Minimize the cost of clearing 6,000 acres
Subject to:
Mission completion 1 30 days
Personnel and equipment required 1 Ability
of Local
Area to
Supply

95

�Several assumptions are necessary to complete the examination
of this MQE:
(1) The vegetation is either medium or heavy.
(2) Method of clearing will be "area" type.
2. Cost-Effectiveness Measures
a. MOB f 1

Cost-Effectiveness Measure =

Cos t/crew/day
•-

For area clearing in light vegetation ( )
U:
$81/crev/day
2.88 acres/day = ?28 Per acre'
Similar calculations yield the following tablei
Table VI-2: "Slash and Burn" Clearing
liars per Acre)
AREA CLEARING

STRIP CLEARING

Lower
Bound

Upper
Bound

Lover
Bound

Upper
Bound

Light

$23

$28

$18

$23

Medium

$64

$79

$51

$63

$147

$180

$147

$180

VEGETATION

Heavy

If these costs are to be depicted by mission categories, the
vegetation classifications and the method of clearing must
be encompassed by the maximum and minimum limits. Although
this gives a large interval for the costs to be within, the
review must ren&gt;en±&gt;er that vegetation removal by ground
personnel and equipment is extremely sensitive to the type
of terrain which the work is being conducted in.
96

�Table VT-3: Cost-Effectiveness Measures for "Slashand
Burn" Clearing
(Dollars per Acre)
MISSION

MINIMUM

MAXIMUM

Land Clearing

$18

$180

Crop Destruction

$18

$ 28

b. MOE # 2

In order to analyze this program, one nmst first
look at the constraints.

In medium vegetation, a crew of 45

can only clear one acre per day. The size of the operation
dictates that at least 200 acres must be cleared per day in
order to meet the 30 day time constraint. This would mean
200 crews or 9,000 men would have to be hired.

It is

doubtful that the host government could supply or the U. S.
units could secure that many workers. Hence, this method of
clearing is considered infeasible for a large scale land
clearing operation.
E.

PARAMETER SENSITIVITY

Since indigenous cutters are paid by the day, it would
be important to examine the cost fluctuation over a range of
possible utilization factors.

As might be expected by

noting the units of the clearing rr-tes (man-hours per acre),
changing the utilization factor from the established eight
hours p*1'" uay results in a large cost variation.

This shows

the importance of negotiating a work agreement that insures
enough "time on the job."

It also amplifies the costs
97

�incurred if the cutters' pick-up point were far from the
clearing site, causing an excessive amount of transportation time to jecrease the crew utilization, or if the
supervisor were unable to motivate his crew.
TABLE VI-4:

VEGETATION REMOmi&gt;

SENSITIVITY ANALYSIS....SLASH AND BUBM CLEARING
SENSITIVITY OF CREW UTILIZATION.. .ARES. BURNING
(Heavy Clearing)
UTILIZATION
(HOURS/DAY)

MAXIMUM SYSTEM COST
i^/^C&amp;E)

5.0

$288.61

5.5
6.0
6.5
7.0
7.5
8.0

262.37
240.51
222.01
206.15
192.41
180.38

8.5
9.0

169.77
151.90

10.0
10.5
11.0

144.31
131.43
131.19

SENSITIVITY OP CREW UTILIZATION

STRIP CLEARING

(Light Clearing)
UTILIZATION

MAXIMUM S1STEM COST

29.41
26.74
24.61
22.63
21.01

5.0
5.5
6.0
6.5
7.0

7.5

19.61

8.0

18.38

8.5
9.0
9.5
10.0
10.5
11.0

17.30
16.34
15.48
14.71
14.01
13.37

98

�TABLE VI-5;

CROP DESTRUCTION

SENSITIVITY AKALYSIS... .SLASH AKD BURN CLEARING
SENSITIVITY OF CREW UTILIZATION.. .AREA CLEARING
(Light Clearing)
UTILIZATION
(HOURS/DAY)

MAXIMUM SYSTEM COST
(S/ACRE)

5.0
5.5
60
.
6.5

4.0
51
41.00
37.58
3.9
46
32.21
30.06
28.18
26.53
25.05
23.73
22.55
21.47
20.50

70
.
7.5
80
.
8.5
90
.
9.5
10.0
10.5
11.0

SENSITIVITY OP CREW UTILIZATION.. STRIP CLEARING
(Light Clearing)
UTILIZATION

MAXIMUM SYSTEM COST
29.41
26.74
24.51
22.63
21.01
19.61
18.38
17.30
16.34
15.48
14.71
14.01
13.37

5.0
5.5
60
.
6.5

7.0
7.5
8.0
8.5
90
.
9.5
10.0
10.5
11.0

99

�VII.

ANALYSIS OF FIREBOMBING

v

A.

ASSUMPTIONS

1. Firebombing is conducted with the C-raodel medium
helicopter (CH-47C - "Chinook").
2. Each sortie has an expected d^jration of one-half
hour. I LTC Ruirowj
3. A flight over a given target consists of one CH-47C.
j LTC Rudrow J
4. Salvaged slings and salvaged 55-gallon drums are
used in the drops. M-4 fue:l thickener is mixed with gasoline to form a six per cent solution of thickened fuel.
j DA TC 3-336

1965 j Twenty drums will be carried on one

mission (or more common terminology, one "drop").
[LTC RudrowJ
5. The number of missions over a target area is
dependent on the requirement to have a .90 probability of
success from one or more drops.
6. When available, security forces consist of two AH-1G
arnied helicopters.

However, unlike herbicide missions with

the UH-1, firebombing missions will not be flown unless one
AH-lG is present.

One OH-6A or OH-58A light observation

helicopter will provide the necessary control. [LTC RudrowJ

100

�B.

PARAMETERS

1.

Flying Hours
Initially, the flying hours for the CH-47 that will

be used as basis for the analysis will be the saiae as the
other aerial systems. A mission duration of one-half hour
implies that the helicopter will fly 100 sorties per month
in order to reach the specified 600 flying hours per year.
However, like the UH-1 helicopter, this is below the CH-47's
programmed limit of flying (720 hours per year) in an active
combat environment.

|DA FM 101-20 1970 J The effects of

this difference will be examined in a sensitivity analysis
of the sortie generation rate in Section E.
2. CostBounds
The bounds on the mission costs are obtained by the
variation cf the security and control posture that often
results during normal employment. Control of a drop is
accomplished by a representative of the ground commander in
an LOH. However, if the Chinook pilots are familiar with
the mission and the AO, the presence of the LOH is unnecessary. Under normal operating conditions, security is
provided by two AH-lG helicopters.

The lower cost bound

is reached when only one armed helicopter is used.

The use

of one "Cobra," even under die most austere conditions, is
due to the vulnerability and lack of maneuverability of the
CH-47.

101

�C. COST ANALYSIS

1. Isolation of Relevant Costs
The only costs incurred by this method of vegetation
removal are those that are categorized as operating costs.
The procurement of the CH-47 is treated as a sunk cost since
the helicopter is diverted from normal lift missions to
conduct firebombing operations.
a. 0 &amp; M cost is rated at 15 per cent of the
procurement cost of the helicopter, j Mr. Donaldson! The
w»

*i

procurement cost for the CH-47C is $1,536,424.
700-200 197l]

O &amp; M cost:

b. Crew salaries:

[DA SB

$230,000 per ycir.
Crew consists of two officers

and one enlisted roan. [DA FM 101-20 1970] Total cost:
$38,000 per year.

(Major Howe]

c. Security forces:

$200 per mission (U}-2 AH-lG's.
$100 per mission (L)-1 AH-lG.
(Appendix A)

d. Control:

$ 25 per mission (U)

0
(Appendix C)
e. Thickened fuel:

(L)

$163 per mission. (Appendix C)

2. Mission Cost
SC = (O &amp; M cost + Salaries)
Number of Missions/Year

+ Security cosfc +

Control cost + Agent cost
Cost per Mission
LOWER BOUND

UPPER BOUND

$ 486

$ 611
102

�3. Yearly Costs
The yearly cost is extremely sensitive to the input
parameters.

This, coupled with the fact that the CH-47

would never be solely employed for fireborabing missions,
diminishes its importance.
Cost per Year
I^JWER BOUND

UPPER BOUND

$583,200

D.

$733.200

EFFECTIVENESS CRITERIA AND COST-EFFECTIVENESS MEASURES
1.

Effectiveness Criteria
a. MOE t 1 - "Area"

The effectiveness of any one mission is contingent upon many variables. The condition of the vegetation,
weather, scattering effect of the incendiary fuel, and the
probability of detonation of the drura cluster require that
the evaluation of effectiveness be accomplished with a
probabalistic model. An appropriate model would be a two
or three dimensional fragmenting projectile model.

However,

this would require the determination of a lethality function
and directional variances of the bursting radii of the
cluster just to obtain a conditional single drop probability
of burn (pB). Since this data was not available, a
model was used. The probability statement is:

Prob

Fire burns 50 acres in one
or raore drops (missions)
when n drops are made

103

= Prob(pB,n) = . 0
9.

�This uses the data from assumption # 5 and has the implicit
assumption that 50 acres will be burned per B drops
(missions).
Prob(pB,n) = 1 - (1 - pB)n
where pB

is the probability that 50 acres are burned on

any particular drop.
Inherent in this model are the assumptions that:
(1) pB

is the same for all drops.

(2) There is statistical independence between drops
(or no information is gained from one mission to the other).
An evaluation of n

for Prob(pR,n) £ . 0 yields:
9

PB

n

.2

10

.3

7

.918

.4

5

.922

.5

4

.3
98

.6

3

.936

.7

2

.1
9

.8

2

.6
9

.9

1

.
9

Prob(pB,n)
. fapp)
9

For this portion of the analysis, PQ = .4, which will
necessitate five drops or missions to insure a .9 probability of burning 50 acres on at least one of the five drops.
b. KOE # 2 - Constrained Cost Minimization
Minimiza the cost of burning 6,000 acres

104

�Subject to:

Mission completion £ 30 days
Assets required £ Local command supply capability
Two CH-47 helicopters would be required to fly ten sorties
per day for 30 days in order to be 90 per cent sure that
this method would burn off 6,000 acres. Like aerial delivery of herbicides in the UH-1 constrained cass, this
represents a significant drain on the area's aviation asset*:,
Few commanders could afforci such a program due to the
important role the "Chinook" plays in combat support and
combat service support operations in an insurgency conflict.
For this reason, it is felt that the second constraint is
violated, and thus, the alternative is infeasible. The area
would have to be reduced significantly for firebombing to be
a viable alternative.
2. Cost-Effectiveness Measures
N x Mission Cost
System Cost = ;
where N = the
50 acres/mission
nuraber of missions (drops).
No differentiation is made between crop destruction and
foliage removal for this alternative.

The reviewer should

not overlook the problems encountered in RVK when attempts
tfere made to burn large caches of dry rice.

Therefore, live

rice and other paddy-type crops would be virtually impervious to destruction by firebombing.

105

�Tafcle

tfll-1:

Cost-Sffecti mess Measures for FireboiBbing
(DolJ ;:s per Acre)
MINIMUM

$49
E.

MAXIMUM

$61

PARAMETER SENSITIVITY

1.

Sensitivity ofSortie GenerationRate (Table VII-2J
Table VII-2 indicates that the number of missions

flown per month has relatively little effect on the cost of
burning an acre.

iMs is due to the fact that only $223 per

mission are subject to fluctuations caused by a variable
sortie rate.

(Mission cost vectorj ($611, $456).) The

remainder of the costs are caused by security, control, and
fuel costs and these are based OE a flat rate per sission.
2.

Sensitivity of Probability of Burn on any Single

Drop (pB)

(Table VII-3)

T*»is testing shows the effect of varying the single
drop probability of burn over a reasonable range of values,
In actual operations, pB would law- a tendency to be at the
lower end of this spectrum rather tfian the higher.
3.

Sensitivity of Security

tests

(Table VII-4)

These parameter values raage from zero to the cost
that would be ir-urred if three escort heliccpters accompanied the mission.

106

�TABLE VII-2
SENSITIVITY AKM.YSIS - FIREBOMB ING WITH CH-47
SENSITIVITY OP SORTIE GENERATION R .TE ($/ACRE)
SORTIES
PER MO.

HOURS
PER YEAR

SYSTEM COST

MIN.

SYSTEM COST
MAX.

78.

470.

54.81

67.31

80;

480.

54.22

66.72

82.

490.

53.65

66.15

83.

500.

53.10

65.60

85.

510.

52.57

65.07

87.

520.

52.07

64.57

88.

530.

51.58

64.08

90.

540.

51.11

63.61

92.

550.

50.66

63.16

93.

560.

50.23

62.73

95.

570.

49.81

62.31

97.

580.

49.40

61.90

98.

590.

49.01

61.51

100.

600.

48.63

61.13

102.

610.

48.27

60.77

103.

620.

47.91

60.41

105.

630.

47.57

60.07

107.

640.

47.24

59 74

108.

650.

46.92

59.42

110.

660.

46.60

59.10

112.

670.

46.30

58.80

113.

660.

46.01

58.51

115.

690.

45.72

58.22

117.

700.

45.44

57.94

118.

710.

45.17

57.67

120.

720.

44.91

57.41

107

�TABLE VII-3
SENSITIVITY ANALYSIS - FIREBOKBING WITH CH-47
SENSITIVITY OF PROBABILITY OP BURN ON ONE DROP

(§/Acre)
# OF DROPS
10.
8.
7.
6.
5.
4.
4.
3.
3.
' 3.
2.
2.
2.
2.
1.

P.

SYSTEM COST
MIK.

0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90

97.27
77.81
68.09
58.36
48.63
38.91
38.91
29.18
29.18
29.18
19.45
19.45
19.45
19.45
9.73

SYSTEM COST
KAX.
122.27
97.81
65.59
73.36
61.13
48.91
48.91
36.68
36.68
36.68
24.45
24.45
24.45
24.45
12.23

TABLE VII-4
SENSITIVITY ANALYSIS - FIREBOMBISG WITH CH-47
SENSITIVITY OF THE SECURITY COSTS
($/Acre)
SECURITY COSTS
($/MSN)

SYSTEM COST
MIK.

SYSTEM COST
KAX.

0.
25.
50.
75.
100.

38.63
41.13
43.63
46.13
48.63

41.13
43.63
46.13
48.63
51.13

125.

51.13

53.63

150.
175.
200.
225.
250.
275.
300.

53.63
56.13
58.63
61.13
63.63
66.13
68.63

56.13
58.63
61.13
63.63
66.13
68.63
71.13

108

�VIII.

INSIGHTS AND CONCLUSICTIS

The need for defoliation and crop destruction is a
direct result of the tropical growth, clinate, and peculiarities of insurgency warfare.

It would be difficult to

imagine the necessity of these measures in a conventional
war in a barren country like the Republic of Korea or in
many areas of Western Europe. Conventional war raises the
additional security problem of antiair protection and the
costs incurred to insure local air superiority.

These and

other problems of the "linear war" have not been considered
here.

Hence, ths conclusions drawn froa this study are

applicable only to those parts of the world affected by
certain climates, vegetation, and the press4-7 needs of
con&amp;ating an eneasy insurgent.
A.

RESULTS OF TEE ANALYSIS
1. MOE # 1

The first measure of effectiveness attempted to
focus on each system's performance capability. A complete
display of the results allows a better comparison of the
alternatives.
Table VIII-1: Cost-Effectiveness Vectors for KOE * 1
(Dollars per Acre)
IGLIAGE REMOVAL
HERBICIDES
UC-123 UH-1H

TACTICAL LAND
CLEARING

"SLASH AKD
BURN"

FIREBOMB ING

MAX.

$47

$35

$90

$180

$61

MIN.

$3S

$27

$12

$ 18

$49

109

�CROP DESTRUCTION
HERBICIDES
UC-123 UH-1H

TACTICAL LAND
CLEARING

"SLASH AND
BURiT,

FIREBOMBING

§29
MIN.

$17

$25*

§28

$61*

$10

$ 5

$12*

$18

$49*

*Not appropriate where rice is the staple of the diet.
Table V-5)

(See

Tactical land clearing and "slash and burn" clearing
show considerable variability in their maximum and minimum
cost limits. This is due to the terrain sensitive nature
of both systems. This, coupled with the different clearing
results (one improves vertical surveillance while the other
improves both vertical and horizontal surveillance), makes
comparison with aerial-supported methods difficult.

If

comparisons are made within aerial categories and within
ground categories for each mission type, dominance can be
used to eliminate some vectors, since the maximum and
minimum limits for these two groups of systems are caused
by the same factors.
FOLIAGE REMOVAL

Aerial Systems
UH-1

Ground Systems
"Rome Plow"

MAX.

$35

$90

MIN.

$27

$12

When tactical land clearing and firebocibing are
eliminated as alternatives for crop destruction, herbicide delivery by UH-1 dominates all other vectors.

110

�2. HOE # 2

This measure of effectiveness attempted to amplify which
system(s) could meet a rigorous set of hypothetical combat
conditions.

The program format was:

Minimize the cost of defoliating/clearing
6.000 acres
Subject to:
(1) Mission accomplishment in 30 days
( ) A reasonable amount of assets to
2
complete the task.
The major additional assumptions stated:
( ) Spraying (using Agent ORANGE) must be
1
accomplished within five days.
( ) The vegetation is either medius or heavy and
2
area clearing is required.
(3) Ground systems are considered to be in a
high state of readiness.
Table VIII-2: Cost Minimization vectors for Foliage Removal
( 0 0 acres) with Tice and Resource Constraints
60
(Costs in Dollars)
Herbicides

UC-123K

Tactical Land Clearing

IU)

$272,100

§615,600

(L)

$227,900

$244,800

**Infeasible alternatives are not shown.
The preceding table shows that only two alternatives
can meet a stringent set of combat conditions.

Ill

�More important than the actual dollar costs is the
relative cost difference between the tvro systems. By
looking at this change in the cost minimization vectors, it
is possible to examine the incremental costs incurred to
vgain another dimension in surveillance capability.

A

defoliation mission usually improves only vertical surveillance.

Although roost of the leaves are off the vegetation,

the trees and undergrowth remain to restrict visual and
electronic surveillance frcru the ground-

a tactical land

clearing operation removes all vegetation and thus produces
a horizontal capability ai well as the vertical.

It can

also be assumed that an area which has been subjected to
land clearing restricts enemy movement and channelizes his
movement far more th?Jt the same defoliated terrain.
B.

INSIGHTS

In order to check the information of Table ¥111-2 is
not biased by the scale of the operation, the mission size
can be restricted.

By reducing the area by 50 per cent,

another set of cost minimization vectors can be obtained.
The assumptions of KOE # 2 are maintained with the exception
of having the UC-123 flights ran^e from two to five aircraft.
Table VIII-3:

Cost Minimization Vectors forVegetation
-.emoval of 3,000 Acres
(Costs in Dollars)

HERBICIDES
UH-1

TACTICAL LAKD

UC-123

CLEARIKG

(U)

?100,700

$136,050

$307,800

(L)

$ 80,700

$112,930

$112,400
112

�(Firebombing would be feasible only if the area were less
than 1,000 acres.)
The relaxation of mission requirements indicates that
the UE-1 defoliation system is minimum cost system and for
this program dominates the other alternatives. However,
the figures do not show the faster mission accomplishment
rate of the UC-123 or the complete clearance capability of
the D7 tractor equipped with the Rome K/G clearing blads.
In order to gain isore insight into the problem of
distinguishing between the systems, a "conanen mission"
vector can be obtained for each alte .'native.

This vector

attempts to show the cost per acre for foliage removal under
conditions that are most likely to occur in a counterinsurgency situation.

It differs from the results of

Table VIII-1, which were oriented toward optimistic and
pessimistic estimates, in that it can be considered to be
the "best estimate."

The conditions making up the "coirjrson

mission" are:
1. Defoliation/foliage

removal operation (far more

cciCTon than crop destruction).
2. The vegetation is classified as medium or heavy
since thicker terrain is more valuable to the enemy for use
as sanctuaries, staging areas, hospitals, and base carcps.
3. Clearing is limited to area type since strip
clearance is restricted to vegetation removal (anti-arabush
measures) along lines of cocnunication.

113

�4. Defoliation systems use Agent ORANGE since it is
faster acting than WHITS but not as persistent.
5. Land clearing units have two operators per tractor
and the optimum security and control available.
Reference:

Table IV-6A, Table V-4, Table VI-2, and

Table VII-1.
Table VIII-4: Common Mission Vectors (Dollars/Acre)
HSRBICIDES
UH-1
UC-123

TACTICAL LAND
CLEARING

"SLASH AKD
BURN"

PIREBOKBING

()
U

$34

$45

$56

$180

$61

()
L

$27

$36

$34

$ 79

$49

Again, herbicide delivery by UH-1 helicopter dominates
"*-il other alternatives.

These results serve to confirm the

findings shown in Tables VIII-1 through VIII-3.
C.

CONCLUSIONS

The cost-effectiveness measures obtained in this study
through the evaluation of the two measures of effectiveness
indicate that a force mix of herbicide aircraft and land
clearing tractors woyldrocs'-likely provide a costeffective solution to the foliage removal/crop destruction
missions faced during counterinsurgency operations in an
RVN-type environment, especially when one takes into
account that horizontal and vertical vision is desirable.
However, this is not meant to exclude the employment of
fireboxr£&gt;ing or "slash and burn" clearing %\?hen the other
systems are not available to do the job.
114

�The ratio of the force-mix must be determined through
further examination of the problem. The decision to use
the UH-1, UC-123, or both as herbicide delivery systems
would depend on the intensity of the conflict, the commitment of U.S. assets, and the desired flexibility of the
over-all force structure. Certainly the helicxpter provides
more flexibility since it can be used for «any other combat
support tasks, fhe UC-123 accomplishes its mission at a
much faster rate but is entirc-ly cojiiBitted to aerbicide
operations since its configuration does not lend itself to
easy modification.

Likewise, the aaount of tractors and

their desired organization (sections, companies, battalions)
would be a function of the increased costs that the decision maker might be willing to accept to gain tJie benefit
of a two dimensional '.surveillance capability.
If the results of this study are to be useful in the
allocation of funds to foliage removal/crop destruction
missions, the decision maker must develop a detailed
situation estimate and employment model. This would include
a threat analysis of enemy forces and capabilities, an estimate of friendly forces and objectives, and a contingency
analysis of possible commitment areas.

If this were

accomplished and if an RVN- type environment were encountered
in the scenario, then the results of this study nay be
applicable in determining a proper mix of systens to effectively accomplish these two combat support missions.

115

�APPENDIX A
DETAILED HERBICIDE COSTS

A.

UC-123K

1. yearly operating cost for a squadron in Pacific Air
Force (PACAF);

[captain Wallace^

Direct element
Modification/spares
Maintenance - Operating
Support Equipment
Personnel

§ .5 million
$1.7 million
$ .1 million
$2.9 million
$5.2 million

Major support commands
Base operating
Depot Maintenance

$ .7 million
$1.2 million
$1.3 million

other

$3.2 million

TOTAL = $8.4 million
This figure is for 12 aircraft.

Thus the operating cost for

one aircraft is $700,000 per year.
2.

Modification costs
a.

[Hiss LuckyJ

Installation of the Hayes AA-45 system.

Total

of 51 aircraft modified.
$1.4 million
$ .3 million
$ .2 million
$1.9 million
b.

Hardware
Installation
Initial Spares

Engine modification.
$36.1
$11,2
$ 8.1
$55.4

million
million
million
million

116

Total of I .3 aircraft.
Hardware
Initial spares
Installation

�c. Armor plating. Total of 31 aircraft.
§400,000
$100,000
$100,000
$600.000
B.

Hardware
Initial spares
Installation

UH-1H

Security costs for UH-1 herbicide missions.
flying hour costs for AH-lG: $64 per hour
1970J or $32 per mission.

Direct

[DA FM 101-20

If approximately $70 were

allowed for munitions and salaries of pilots, the cost of
one AH-lG on a security escort mission would be $100.

117

�APPENDIX B
DETAILED COSTS FOR TACTICAL LAND CLEARING

A.

Cost of lubricants and filters.

The Caterpillar

Performance Handbook (Sec. 21, p. 5) gives a quick estimate
of $.26 per based on oil at $1 per U.S. gallon, grease at
$.20 per pound, EP oil at $1.10 per U.S. gallon, and filters
at U.S. Consumer's List Prices.

Under heavy operating

conditions, these costs increase by 25 per cent.
B.

Typical repair costs over a two-year period for medium

tractor and Rome kit
Number
5
2
1
5.5
18
2.5
1.2
2

C.

in RVN:

Major Bennett]

Eguipr;.3nt

Unit Cost Total Cost

Engir/5
Transmissions
Winch
Cabs
Cutting Blades
Blades
Radiators
Track assembly

$6,129
$4,498
$4,750
$1,600
$ 278
$1,887
$1,200
$1,249

$30,645
$ 8,996
$ 4,750
$ 8,800
$ 5,004
$ 4,718
$ 1,440
$ 2,498
$66,850

Security cdsts are based on the approximate field

strengths of an armored cavalry troop and a aechanized
infantry rifle company ( )
-.

Usually, the trocp will field

approximately 130 to 140roei.while the infantry company
would have between 100 and 120 men. The cavalry troop
would have 20 or more tracked vehicles and tbe infantry
unit would have 10 to 15.

118

�D. Costs for a light observation helicopter are based on
direct flying hour costs of $30 per hour. JDA FM 101-20

1970]
E. Transportation Cost to RVN:
Shipping, Surface

General Cargo ($/Ton)

Line Haul within U.S.
Port Handling, West Coast
Ocean Shipping
" Port Handling, RVN
Other
"

D7 Tractor:
Rome kit and blade:
Equipment weights:

$40
$21
$72
$14
$3
$150 per Ton
jpCSLOG 1971]

16 tons x $150/ton = $2400
6 tons x $150/ton = $ 900
JMr. Soules I.

119

�APPENDIX C
DETAILED COSTS FOR FISIS3MBING

A,

Control costs are based on direct hour flying costs of

the LOH which are $30 per hour.

JJ3A FM 101-20

197o[|

This

coupled with the pilot's salary and Use ground commander's
representative yields a control cost cf $25 per mission.
B.

Thickened Fuel:
Pounds of M4 Thickener Headed for XJmrious Blends of
Thickened Fuel
Gallons of Gasoline

4%

«3&amp;

8%

40

5

?%

10

50

6%

1§

13%

[DA tC 3-366

1965J

Ten pounds of M4 thickener are used with each druo (55
gallon) of gasoline.

M4 thickener costs $1.30 per 20 pound

can.

1971 ] Using a cost of $.15 per gallon

j~DA SB 700-200

of gasoline, a drum of thickened fuel «^osts $8.15.
$8.IS/drum x 20 drums/mission = 5163 per mission

120

�APPENDIX D:

DATA SOURCES

The personnel listed in this appendix contributed in the
assembly of data for the study.

The contributions and the

office/address (as of June 1971) are listed as documentation.
1. Aerial delivery of herbicides.
Mr. Carlton W. Carter: USAF Deputy Chief of Staff (DCS),
Systems and Logistics (S &amp; L), Washington, D. C. Costs of
herbicides to include transportation and storage.
a. UC-123K
(1) Miss Joyce B. Lucky:

USAF ODCS, S &amp; L,

Washington, D. C. UC-123 codification costs for engine
modifications, spray systera, and armor plating.
(2) captain James A. Wallace, USAF:

Office of the

Coiaptroller of the Air Force, Washington, D. C. Procurement
and operating costs for the UC-123K.
(3) Major Robert Pyatt, USAF: ODCS, Plans and
Operations {Special Operations Division), Washington, D. C.
General information about herbicide operations.
(4) Major Peter D. Hidalgo, USA: Office of the
Assistant Chief of Staff for Force Development (OACSFCR),
Washington, D. C. Verification of sortie duration and
sortie generation rates.
(5) LTC Kenneth M. Cooper, USAF: ODCS. S &amp; L,
Washington, D. C. Operating cost for A-1E.

121

�(6)

LTC Arthur L. Monahan, USAF:

Washington. D. C.
(7)

ODCS, S &amp; L,

Munition costs for FAC's.

Major John D. Sins, USAF:

Resources, Washington, D. C.

ODCS, Programs and

Hourly operating costs for

the OV-10 and A-1E.
b. UH-1:

(1) LTC Manuel L. Sanches and LTC Robert G. Rudrow,
USA:

OACSFOR, Washington, D. C. Aerosol system and capa-

city, attrition rates, security configurations, mission
duration, and system coverage.
(2) Mr. F. X. Donaldson:

OACSFOR, Washington, D. C.

Maintenance factors and expected life of UH-1.
( ) Mr. Drake: Operations Manager, Agricultural
3
Aviation Engineering Company, 1333 Patrick Lane, Las Vegas,
Nevada, S9109. AGAVENCO System: Cost, size, maintenance
factor, and capacity.
(4) Major Robert Howe, USA: Engineer Strategic
Studies Group, Washington, D. C. Personnel salaries costs
and transportation costs for the AGAVENCO.
2. Tactical Land Clearing.
a. Major Richard Bennett, USA: Engineer Strategic
Studies Group (ESSG), Washington, D. C. 07 tractor and Rome
kit repair costs and rates.
b.

Mr. Jim Guthrie: Supervisor of Defense services

Section, caterpillar Tractor Company, Peoria, Illinois.
General information about the Caterpillar tractor.

122

�c. Mr. J. T. Soules: Vice President of International
Department, Rome **low Company, Cedartown, Georgia. General
information about the Rome clearing blade and kit.
3. "Slash and burn" Clearing.
Mr. Elton Underwood:

ESSG, Washington. D. C. Payaent

rates for indigenous clearing crews and verification of
clearing rates.__
4. Firebopbing.
LTC Robert G. Rudrow, USA: OACSFOR, Washington, D. C.
Security, control, equipment, and duration of the missions.

123

�BIBLIOGRAPHY
Some sources listed in this bibliography are classified.
However, the information used in this study came from
unclassified sections of these documents.
1. American Ersbassy, Report on theHerbicide Policy Review
(U) , ySOlil'IDttft'PBf, Saigon, August 1968.
2. Augusta, Joseph H, and Snyder, Christopher L., Defense
Planning In A High Inflation Economy, paper presented
at 26th Military operations Research Symposium,
Monterey, California 17-18 Kovember 1970.
3.

Boffey, Philip M., "Herbicides in Vietnam: AAAS Study
Finds Widespread Devastation," Science, v. 171,
p. 43-47, 8 January 1971.

4.

Caterpillar Tractor Coir.pany, Peoria, Illinois, The
Caterpillar Performance Handbook, e«I. I, section 21,
Deceirber 1970.

5.

Cook, Robert E., Haseltine, William, and Galston, A. W.,
"What Have We Done to Vietnam?" The new Republic,
p. 18-21, 10 January 1971.

6.

"Defoliants-A Closed Case?"
15 January 1971.

7.

Department of the Air Force, Air Force Manual 172-3,
USAF Planning Factors (U), iTi'll lliliLll Hi . H Washington,
'i
D. C., 31 March 1971.

8.

Department of the Army, 18th Engineer Brigade, APO San
Francisco 96307, Demonstration and Testing in Vietnam,
July-August 1966.
•

Commonweal,

p. 363-364,

9.

, DA PAH 525-6, Lessons Learned - Land
Clearing, p. 23-79, Washington, D. C,, June 1970.

10.

, DCS Logistics, Transportation Analysis
Division, Budget Cost Factors for Cargo Movements,
p. 1-3, Washington, D. C., 15 July 1971.

124

�11.

, Fact Sheet.- Personnel Investnsant Costs,
Washington, D. C., 12 October 1971.

12.

, FM 101-20, united States Army Aviation
Planning Manual (U), CONFIDENTIAL, p. 1-10, p. 4-2 4-3, Washington, D. C., August 1970.

13.

, SB 700-200, Array Adopced/Other Selected
Items and List ofReportable Items, p. 2-355 - 2-358.
Washington, D. C., December 1970.

14.

, TC 3-16. Employment of Riot Control Agents,
Flame, Smoke, Ahtiplant Agents, and Personnel
De tec tors in Co untergue r r ilia opera t ions, p. 62 - 81,
Washington, D. C., April 1969.

15.

, TC 3-366, Flame FueIs, p. 3 - 5, p. 8 - 13.
Washington, D. C., July 1965.

16. Directorate, Tactical Evaluation, Project CHECO Southeast Asia F°p^rt July 1961 - June 1967 (u),
SECRET, Headquarters pacific Air Force, 11 October
1967.
17. Downs, E. D. and Scrivner, J. H., De fo1iat ion Opera tions
in Southeas t Asia (U), SECRET, Maxwell AFB, Alabama,
1970.
18. Fisher, Gene H., Cost Considerations in Systems Analysis.
p. 63-118, American Elsevier Publishing Co.. 1971.
19. Gonzales, Arturo F., "Defoliation - A Controversial U.S.
Mission in Vietnam," Data, v. 13, p. 12-15, October
1968.
20. Goodell, Hon. Charles E. (New York), U.S., Congress,
Senate, Congressional Record, 91st Cong., 2d sess.,
S-1574-S-1580.
21. Headquarters, 62d Engineer Battalion, APO San Francisco
96491, Letter, Subject: "Ea^ic Land Clearing
Briefing," February 1971.
22.

, Letter, Subject: "Narrative to Accompany
Slide Briefing, 11 April 1971.

23. Headquarters, 169th Engineer Battalion, APO San Francisco,
Letter, Subject; "Land Clearing Test Program
Completed, 16 August 1971.

�24. Hersh, Seymour M. , Chemical and Bio log-teal Warfare America's Hidden Arsenal, p. 144-167, Bobbs -Merrill
Company, 1968.
25. Heyroont, I. and others, A Guide for Reviewers of Studies
Containing Cost Effectiveness Analysis, Research
Analysis Corporation, July 1965.
26. Hirshleifer, J. , Investment, Interest, and Capital, p.
48-49, Prentice-Hall, 1970.
27.

House, W. B. and others. As sesstnen t o f Ecolog ical
Effects of Extensive or Repeated Use of Herbicides,
p. 1-72 and p. 108-150, Midwest Research Institute,
30 November 1967.

28.

Kastenroeier, Hon. Robert W. (Wisconsin)* U.S., Congress,
House, "Ecological Destruction in Vietnam,"
Congressional Record - Extension of Remarks, 92d Cong.,
1st sess., E-22SC - E-2293.

29. Lewallen, John, Ecology of Devastation;
p. 58-94, Penguin Books, 1971.

Indochina,

30. McCarthy, Richa7.-d p. , The ultimate Folly, p. 75-98,
Alfred A. Knopf/ 1971.
31. McConnell, Arthur F. (LTC, USAF) , "Mission: Ranch Hand,"
Air University Review, p. 89-94, v. 21, n. 2, JanuaryFebruary 19^0.
32. Nelson, Hon. Gay lord (Wisconsin), U.S., Congress, Senate,
"Environmental Warfare," congressional Record , 91st
Cong., 2d sess., S-14217-S-14230.
33. Office of Deputy Assistant Secretary of Defense (Systems
Analysis') , Southeast Asia Analysis Report - March/April
1971 (U) , SECRET, p. 35-36 and p. 41-43, Washington,
D. C., 14 May 1971.
34. Orians, Gordon H. and Pfeiffer, E. W. , "Ecological
Effects of the Wai in Vietnam," Science, v. 168,
p. 544-554, 1 May 1970.

35. _
, and _
, "Mission to Vietnam - Part
I," Scientific Research, v. 4, p. 22-30, 9 June 1969.
36. _
, and _
, "Mission to Vietnam - Part
II," Scientific Research, v. 4, p. 26-30, 23 June 1969.
126

�37. Rome plow company, cedartown, Georgia, Land Clearing
Equipment for Vietnam, p. 1-5, 22 April 1966.
38.

, Presentationto U. S. Army - Equipment for
Land Clearing in Vietnam, p. 108, 9 February 1966.

3S.

, Salesgraro; Guide for Estimating Production
with Rome K/G Clearing Blade, 1 September 1971.

40.

, Military Applications of the Rome K/G
Clearing Blade, November 1971.

41. Tschirley, Fred H., "Defoliation in Vietnam," Science,
v. 163, p. 779-786, 21 February 1969.
42. U.S. Anxsy Combat Developments Command (USACDC), Table of
Organization and Equipment 5-87T - Engineer Land
Clearing Company, Fort Belvoir, Virginia, 7 February
1969.
43. Westing, Arthur H., "Ecocide in Indochina," Natural
History, v. 80. p. 56-60, March 1971.
44. Young, Hon. Stephen K. (Ohio), U. S., Congress, Senate,
Congressional Record. 91st Cong., 2d sess., S-21486 S-21488.

127

��</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5651">
              <text>015</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5652">
              <text>0160</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5655">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5650">
                <text>Howard, John D.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5653">
                <text>1972-03-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5654">
                <text>Herbicides in Support of Counterinsurgency Operations: A Cost-Effectiveness Study</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5656">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="5657">
                <text>herbicide application</text>
              </elementText>
              <elementText elementTextId="5658">
                <text>military impact</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1430" public="1" featured="0">
    <fileContainer>
      <file fileId="1245">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/293c71af89da87614c118285fe2c4494.pdf</src>
        <authentication>7f7f144e445462eed16aad842ebd06e1</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63194">
                    <text>Item ID Number

°0363

Author

Smallwood, A. M.

Corporate Author

Hayes International Corporation

RepOrt/ArtlClO Title

lnternal

Defoliant Dispenser A/A45Y-1

Journal/Book Title
1967

Month/Day
Color

Octot er

&gt;

n

Number of Images

62

DOSOrlptOH Notes

^lvin L- Youn9 nac) tnis item filecl under the category
"Equipment - How Developed, How Used"; contracts
AF 08(635)-3609 and AF 08(635-4894

Monday, January 29, 2001

Page 363 of 382

�Smallwood, A.M.,
1967

/UNLIMITED

Internal Defoliant Dispenser A/A 45Y-1
AD 833 990

Technical
Report
distributed by

Defense Technical Information Center
DEFENSE LOGISTICS AGENCY
Cameron Station • Alexandria, Virginia 22314

^ERQMEDICAE LIBRAI
JAN 10 1980

UNCLASSIFIED/UNLIMITED

COCUMENTS

�THIS REPORT HAS BEEN DELIMITED
AND CLEARED FOR PUBLIC RELEASE
UNDER DOD DIRECTIVE 5200,20 AND
NO RESTRICTIONS ARE IMPOSED UPON
ITS USE AND DISCLOSURE,

DISTRIBUTION STATEMENT A
APPROVED FOR PUBLIC RELEASE;
DISTRIBUTION UNLIMITED,

��AFATL-TR-67-127

Internal Defoliant Dispenser A/A45Y-1
A. M. Small wood
R. I Dear
.
A. R. O r t H J
HAYES INTERNATIONAL CWPORATION

T E C H N I C A L R E P O R T A F IT L - T R - 6 7 - I 2 7

OCTOBER 1967

This document is subject to special export controls and each
transtnittal to foreign governments or foreign nationals may bo
made only with prior approval of the Air Force Armament Laboratory (ATCB), Eglin AFB, Florida 3

AIR FORCE ARMAMENT LABORATORY
AIR FORCE SYSTEMS COMMAND
E G L I N A I R FORCE B A S E . F L O R I D A

�INTLKNAL DEl'OLIANT DISPENSER
A/AU5Y-1

A. M. Smallwood
R. L. Dear
A. R. Ortell

Tills document is subject to special export controls ami each
transmittal to foreign governments or I'ureign nationals may
be made only with prior approval of the Air i'orce 'Armament
Laboratory (ATCD), Eglin AID, Ilorula

�FOREWORD

Under Contracts AF 08(G35)-3609 and A F 08(G35)-4804, Hayes International
Corporation, Birmingham, Alabama has developed the A A45Y-1 Internal
Defoliant Dispenser as a quick in-out system for the C-130 and C-123 aircraft.
This report, covering tlie period of October 19G5 thru October 196.7, formally
records the engineering data generated under the above contracts including
results, conclusions, and recommendations. This report is covered under
project number 2525 and task o der number 02 and deals primarily with AF
Contract AF 08(635)-&lt;t894.
The cognizant USA F'project engineers for this program were Lt Arnold \V.
Blomqaist, Lt Jon II. Arvik, Lt W. J. Crea, Jr. and Lt K. A. Reynard of the Air
Force Armament Laboratory, RTD, Biological-Chemical Division (ATCB), Eglin
Air Force Base, Florida. Messrs. A.M. Smallwood (project engineer), R. L.
Dear, and A.R. Ortell.wcrc the principal investigators and authors of this report.
Mr. J. F. Cundiff provided considerable technical assistance in programming the
digital computer for the program and writing the fh'id analysis. Messrs. F. J,
Weatherbee, J. D. Stewart, and B. L. Lewis provided considerable technical
assistance in the design of the A/A45Y-1 dispenser. Mr. J. L. Harrington,
Chief of the Airborne Weapons Group, was responsible for the overall effort.
Information in this report is embargoed under the Department of State
International Traffic In Arms Regulations. This report may be released to
foreign governments by departments or agencies of the U. S. Government
subject to approval of the Air Force Armament Laboratory (ATCB) Kglin AFB,
Florida 32542, or higher authority within the Department of the Air Force.
Private individuals or firms require a Department of State export license.
Publication of this report does not constitute Air Force approval of the
report's findings or conclusions. It is published only for the exchange and
stimulation of ideas.

Nicholas H. Cox, Colonel, USAF
Chief, Bio-Chemical Division

ii

�ABSTRACT
Hayes International Corporation has developed the internal defoliant dispenser,
A/A45Y-1,suitable for quick in-out installation in the C-1^0 and C-123 aircraft.
The internal defoliant dispenser provides for loading, transporting, and dispensing
of 058 gallons of defoliant chemical, and in case of an emergency, dumping the
full load of chemical overboard in leas than one minute. The dispenser was
designed to deliver agent at a concentration of three gallons per ncrc over an
effective swath width of 120 feet from an altitude of 150 feet in either the C-123
or C-130 aircraft. The results of tests conducted at h'glin Air Force Base,
Florida indicated that the optimum parameters for the C-K10 aircraft were an
altitude of one hundred feet and a maximum swath of .seventy feet to obtain a
concentration of three gallons per acre. The optimum parameters for the C-12;J
aircraft were an altitude of 150 feet and a maximum swath of 10 icet for the same
concentration. The fuselage-mounted spray boom does not deliver the defoliant
agent far enough outboard to be affected by the action of the wingtip vortices.
Previous testing with defoliant agent demonstrated that wing mounted booms
subject the spray to these vortices and produce wider swath width. It is recommended that an optimized wing boom be developed in order to increase the swath
width.

This document is subject to special export controls and each transmittal to
foreign governments or foreign nationals may be made only with prior approval
of the Air Force Armament Laboratory (ATCH), l.'glin A F B , Florida :',2~&gt;1'2.

iii
(The reverse side of this page is b l a n k . )

�BLANK PAGE

�TABLE OF CONTENTS
SECTION
I
H

IE
IV

V

INTRODUCTION
DESCRIPTION OF A/A-I5Y-1. INTERNAL DEFOLIANT
DISPENSER
TANK AND CRADLE ASSEMBLY
DUMP VALVE
CONTROL CONSOLE
MAGNETO SWITCH .
CHOKE SWITCH
START SWITCH
THROTTLE SWITCH
SPRAY VALVE SWITCH
DUMP VALVE SWITCH
FLOAT SWITCH OVERRIDE
ENGINE TACHOMETER
FLUID PRESSURE INDICATOR
CIRCUIT BREAKERS
SPRAY BOOM
AIRCRAFT INSTALLATION
DEVELOPMENT TEST OF THE A A-15Y-1 INTERNAL
DEFOLIANT DISPENSER
SYSTEM PERFORMANCE
LIQflD LEVEL GAGE CALIBRATION
CONVERSION FACTORS FOR VARIOUS AGENTS
REFILL BY MEANS OF THE I N T E R N A L DEFOLIANT
DISPENSER JET PUMP
EMERGENCY DUMP TEST
FLOW HATE TEST USING AN INDUCED PRESSURE . . . .
SYSTEM PRESSURE LOSS ANALYSIS
DISPENSER PERFORMANCE RANGE

SUMMARY OF RESULTS AND CONSEQUENT RECOMMENDATIONS

APPENDICES
I
SPRAY BOOM DRAG ANALYSIS
n
AIRCRAFT WEIGHT AND iw\LANCE
IH
STRESS ANALYSIS (C-123 AIRCRAFT)
IV
STRESS ANALYSIS (C-130 AIRCRAFT)
V
MILITARY SPECIFICATION
REFERENCES

PAGE
1
2
4
G
G
f,
7
7
7
8
8
8
9
9
9
9
10
13
17
17
17
IK
24
2-1
2-1
&lt;17

r&gt;:$
.r&gt;r&gt;
f»7
05
99
127
Ml

�LIST OF ILLUSTHATIONS
FIGURE
1
2
3
4
5
6
7
8
9
10
11
12
13
1-1
15
16
17
18
19
20
21
22
23
24
25
26

D
d
f
g
II
h^
K

=
=
=
=
=
-

Major Components of Defoliant Dispenser
Defoliant Dispenser (right side)
Centrifugal Pump
Dump Valve .
Control Console
Spray Boom and Associated Plumbing
Installation in C-123 (left side)
Installation in C-123 (right side)
Typical Agent Deposition (C-123 Aircraft)
Typical Agent Deposition (C-130 Aircraft) . . . .Refill Test Apparatus
Refill Rate with Various Agents Using A 10-Foot Length of
Refill Hose
Refill Rate with Various Agents Using A 20-Foot Length of
Refill Hose
Refill Rate with Various Agents Using A 30-Foot Length of
Refill Hose
Refill Rate with Various Agents Using a 50-Foot Length of
Refill Hose
Emergency Dump Rate lor Various Agents with A/A45Y-1
Dump Valve
Flow Rate Test Apparatus
System Performance Test Results
A/A45Y-1 Fluid Flow Schematic
A/A45Y-1 Fuselage-Mounted Spray Boom
System Pressure Loss
A/A45Y-1 Dispenser Performance Range - Agent: Water.
A/A45Y-1 Dispenser Performance Range - Agent: Orange
or Purple
A/A45Y-1 Dispenser Performance Range - Agent: Blue .
A/A45Y-1 Dispenser Performance Range - Agent: White .
Speed Penalty Determined From C-123 Speed/Power Data

.

20
21
22
23

. .

25
26
27
29
35
4^
49

. .
..
. .

50
51
52
50

^

LIST OF ABBREVIATIONS AND SYMBOLS
internal diameter of pipe, feet
internal diameter of pipe, inches
friction factor in formula hj j ;i fLv"/D2g
acceleration of gravity, 32.2 feet per second per second
total head, feet of fluid
loss of static pressure head due to fluid flow, feet of fluid
resistance coefficient or velocity head loss in the formula,
h L = Kv 2 /2g
vi

PAGE
4
5
7
y
9
10
n
..12
14
15
19

�LIST OF ABBREVIATIONS AND SYMBOLS (Concluded)
L
L/D
P
Q
q
R
S

=
=
=
=
=
=

length of pipe, feet
equivalent length of a resistance to flow, pipe diameters
pressure, pounds per square inch gauge
rate of flow, gallons per minute
rate of flow, cubic feet per second at flowing condition
Reynolds number
specific gravity of liquids relative to water, both at standard
temperature (00°K)

v
A
ft
We

=
=
=

mean velocity of flow, feet per second
differential between two points
weight density of fluid, pounds per cubic feet
absolute viscosity, pound mass |&gt;cr foot second or poundal
seconds |x&gt;r square loot

Me

=

absolute viscosity, slugs per loot second or pound force
seconds per square foot

vii
(The reverse side of this page is blank.)

�SECTION I
INTRODUCTION
The purpose of this technical rc|x&gt;rt is to present engineering dnta generated
under Contracts AF »8(G35)-3G09 and AF 08(G35)-4894. These contracts resulted
in the development of the internal defoliant dispenser, A/A45V-1, designed to
disseminate various chemical agents-utilizing C-123 and C-130 aircraft.
The capability for quick installation and removal of the dispensing system
with minimum modification to the aircraft was a prime requirement under these
contracts. Compliance with this requirement resulted in the use of a fuselagemounted spray boom. Due to the narrow spray swath width generated by the
fuselage-mounted boom, an Air Force-developed wing spray boom is used to
achieve a wider swath width in current tactical applications.
The report contains a description of the dispenser. This is followed by a
section on development tests of the internal defoliant dispenser. System performance is then provided encompassing liquid level gage calibration, conversion factors for various agents, refill by jet-pump, emergency dump test,
flow rate test using an induced pressure, fluid analysis of system with thirtyfoot fuselage-mounted spray boom and dispenser performance. Within the
appendices arc fuselage spray-boom drug analysis, weight and balance analysis
for C-123 and C-130 aircraft, stress analysis, and dispenser specifications.

1
(The reverse side of this page is blank.)

�SECTION II
DESCRIPTION OF A/A45Y-1 INTERNAL DEFOLIANT DISPENSER
The A A-15Y-1 Internal Defoliant Dispenser is a complete airborne defoliant
dispensing system. The dispenser is packaged to permit rapid installation into,
and removal from, C-130 and C-123 aircraft, with only minor modifications
required to the affected aircraft. 809 figures 1 and 2.
.
The Internal .Defoliant Dispenser, Part No. A/A45Y-1, provides for loading, transporting and dispensing of 958 gallons of defoliant chemical, and in
case of an emergency, dumping the full load overboard in less than one minute.
The tank and cradle assembly is mounted on detachable casters which are
removed before anchoring in the host aircraft. A control console is electrically
connected to the aircraft electrical system, controls and indicators in the flight
compartment, and the electrically operated units within the system. Pressure
is applied to defoliant chemical by an engine and pump assembly mounted on the
cradle assembly. The defoliant is transported to a 30-foot fuselage-mounted
spray boom. The fuselage boom incorporates eighteen (18) whirljet spray
nozzles through which the defoliant chemical is discharged into the airstrcam.
LEADING PARTICULARS
Length (app)
Width (app)
Height (app) (without casters)
Weight
Empty
Full
Capacity
Normal operating pressure
Normal dispensing interval
Emergency dump time
Electrical system
Dump valve operation
Refill time (app)
Dump valve
Spray valve
Suction valve

16 feet, 4 inches
4 feet, 10 inches
G feet,

1905 Ibs
12, 055 Ibs with agent having a specific
gravity of 1.27
958 gallons
55 +_ 5 psi
3 to 4 minutes
Less than 1 minute
28 volts dc (supplied by host aircraft)
Electrical or manual
15. 5 minutes with an agent having a
specific gravity of 1.27 through a
50-foot length of refill line
Electrical, 10-inch diameter
Electrical, 3-inch diameter
Manual, 3-?nch diameter

The dispensing operation and emergency dump valve operation can be controlled from either the control console near the tank and cradle assembly or
from the pilot's position in the flight compartment. The pump is capable of
maintaining 55 \_ 5 psi pressure during the normal 3-1/2 minute (approx) period
of operational sprnying. Refilling the lank assembly is accomplished with
power and equipment contained within the dispensing system.

�,TANK VENT

MANHOLE COVER

DUMP VALVE
TANK

ENGINE EXHAUST

LIQUID LEVEL

VIBRATION
ISOLATOR SEGMENT

CENTRIFUGAL PUMP

MAIN SPRAT VALVE

CONTROL CONSOLE

TEMPERATURE
INDICATOR
JET PUMP
REFILL
CRADLE

Figure 1. Major Components of Defoliant Dispenser

Tank and Cradle Assembly
The tank and cradle assembly is the major unit of the entire system comprising (1) a 058 gallon tank with baffles, manhole, tube connections and
stabilizing and ticdown brackets: (2) an engine and pump assembly consisting
of a four cylinder horizontally opposed engine and pump directly coupled to
the engine crankshaft; and (.'!) a cradle equipped with four detachable casters
which carries the tank and engine and pump assembly. A temperature gage and
a fluid quantity gage ai-e installed in the tank. The engine is slightly modified
from its original configuration to achieve adaptability to the requirements of the
dispenser system. The detachable casters arc provided for limited mobility
and arc removed after the unit has been positioned in the aircraft.

�'Figure 2. Defoliant Dispenser (Right Side)

�The defoliant in the tank is fed through a suction line to the pump (two assemblies used on C-130 aircraft). The pump driven by an air-cooled engine
forces the defoliant through a discharge line to a spray valve. A recirdilation
line is provided so that the defoliant will'reeirculate back through the tank when
the spray valve is closed. \Vhen the spray valve is open, the defoliant is forced
into the spray boom and atomized by spray nozzles. When the lank is empty, a
float-pi&gt;erated switch located in the tank automatically stops the engines. On
C-130 aircraft, when either tank is empty, the engine of the empty unit will
automatically shut down. The spray valve will not automatically close until
the second unit's tank empties and the float switch is actuated.
Tlu centrifugal pump (figure 3) consists essentially of an impeller and pump
body and is driven by the engine through a direct drive. The speed of the engine
controls the quantity of defoliant being dis|&gt;ensed.
The recalculation line incorporates a jet-pump (ejector) tank refilling system
which utilizes the fluid left in the tank from prior operation to initially operate
the jet pump. A temperature gage and liquid-level indicator located on the side
of the tank indicate defoliant temperature and quantity respectively in the tank.
Dump Valve
The dump valve is an electrically or manually operated 10-inch diameter
gate valve (figure -1). It is designed for horizontal (vertical flow) installation
and liquid flow in only one direction. The bottom of the defoliant tank incorporates a vortex interrupter and adapter to which the dump valve is secured.
The dump valve assembly is aligned with an opening in the belly of the aircraft.
Tlus ojxming is covered by a spring-loaded door. A high speed motor coupled
to an actuator provides 2-second operation of the dump valve in either direction.
Valve-open condition is electrically indicated on the control console and on the
pilot's instrument panel.
Control .Console

ft

The control console is the nerve center of the defoliant system (figure 5).
All functions arc controlled from this position; all monitoring equipment is
located in this position; and the electrical supply is channeled and protected
at this position. Prefabricated electrical cables tie the control console to
all related parts of the system including the controls on the pilot's instrument
panel and the aircraft electrical supply system. Tandem or single installations
are controlled and monitored from tlie control console without any changes or
alterations being performed. In the event of failure of the aircraft electrical
system, (certain critical functions have an option of manual operation.
Magneto Switch - The MAGNETO switch (AFT UNIT and F\VD UNIT) is a singlcpblci double-throw toggle switch used to control the engine magneto. In the
down position the engine magneto is grounded. In the up position the ground is
removed from the magneto permitting the engine to run (if lank is not empty).

�Figure 3. Centrifugal Pump

Choke Switch - The CHOKE switch (AFT UNIT and F\VD ITCIT) is a springloaded pushliutton switch used to control the solenoid that actuates the engine
choke. When depressed, the CHOKE switch applies power to the engine choke
solenoid.
Sta_ Switch - The START switch (AFT ITs'IT and FU'I) I^IT) is a spring-loaded
pusi iiitton switch used to control the engine starter. When depressed, the
START switch applies power to the engine starter. The START switch is
guarded to prevent accidental engagement of the engine starter.
Throttle SwUch - The THROTTLE snitch (AFT UNIT and FU'I) UNIT) is a threeposition toggle switch spring-loaded to the neutral position. The switch lias
INCREASE and DECREASE positions and is used to electrically control the engine
throttle through a geared servo-motor, The engine throttle may be set at any
intermediate position between minimum and maximum engine vpm by positioning
the switch to INCREASE or DECREASE and releasing to the neutral position
when desired engine RPM is reached. A governor on the engine m a i n t a i n s engine
speed at a given setting.

�Figure 4, Dump Valve
Spray Valve Switch - The SPRAY VALVE switch is a single-pole double-throw
toggle switch used to electrically open and close the spray valve. In the "OPEN
position power is applied to open the spray valve. In the CLOSED position
power is applied to close the spray valve. The SPRAY VALVE switch is guarded
in the PILOT position. A cockpit SPRAY VALVE switch is also provided for
control of the spraying operation by the pilot.
Dump Valve Switch - The DUMP VALVE switch, located at the extreme left side
of the control panel (figure 5), provides electrical control of the dump valve.
The switch is provided with a guard which maintains the switch in the CLOSED
position. Placing the switch in the OPEN position actuates the valve motor
and opens the dump valve.
The cockpit DUMP VALVE switch provides electrical control for opening of
the dump valve by the pilot. Operation is in conjunction with the console DUMP
VALVE switch. Placing either switch in the OPEN position actuates the dump
valve motor and opens the dump valve.
Float Switch Override - The FLOAT SWITCH OVERRIDE (AFT UNIT and FWD
UNIT) is a single-pole double-throw toggle switch (with a holding cc.l) used to
override the float switch (in tank) when the float switch has grounded the magneto.
The FLOAT SWITCH OVERRIDE is spring-loaded in the down position and when

�FLUID

REFILL
f t O A l SHITCM
OvrKKIOt
fwD UNtl
A F T UH1T

STARTIR
AND
CHOKf
T H R O I T L C S IMOICATOR1

IPRA1
VALVf

©

OICBfAlt
©

©

Figure 5. Control Console

placed in the up position, enables the engine io be run when the tank is empty
(in order to fill the tank using the pump). The holding coil holds the FLOAT
SWITCH OVERRIDE in the up position until ihc float switch is actuated.
Engine Tachometer - The engine tachometer is dual indicating (two needles)
and indicates engine speed in hundreds of HPM.
Fluid Pressure Indicator - The FLUID pressure indicator indicates fluid pi'ossurc in increments of 2 PSI. When properly calibrated this gage can be used
as a flow-rate indicator.
Circuit Breakers - Four circuit breakers (STARTER AND CHOKE, THROTTLES,
INDICATORS, and SPRAY VALVE) control power to the control panel and provide protection from electrical overload and short circuits.
Spray Boom
The spray boom (figure (&gt;) can accommodate 18 spray nozzles for dispensing the defoliant. The spray boom is constructed of 4-1/2-inch diameter
steel tubing. The discharge line is off-set from the ccntcrlinc of the spray
boom to allow the aircraft's ramp to operate with the dispenser installed. The
spray boom is attached to the fuselage with six struts.

�INSTALLATION
SlUUTi

SPRAT
NOZZLI

SPRAY BOOM

INSTALLATION
iTKUTS

Figure C. Spray Boom and Associated Plumbing

Aircraft Installation
Installation of the dispenser in C-123 aircraft consists of towing the tank
and cradle assembly (unfilled) into the aircraft and securing it to the aircraft
floor utilizing twenty 10, 000-pound hook and chain assemblies and the cargo
floor tie-down fittings (figures 7 and S). All piping and hose assemblies, and
the dump valve chutes, are installed and the console assembly mounted to the
aircraft floor. The spray boom and connecting struts are attached to outside
fittings on the aircraft and the electrical cables are connected. In the case
oJ the C-130 aircraft, two dispensers are installed in the same manner and
;
interconnected.
.

10

�Figure 7. Installation in 0123 (I,clt Si&lt;!o)

11

�^'4-

Figure 8. Installation in C-12.3 (Right Side)

12

�SECTION III
DEVELOPMENT ThST OF THE A/A45Y-1 INTERNAL DEFOLIANT DISPENSER

Development tests and evaluations of
A/A45Y-1, In the C-130 and C-123 aircraft
Force Base, Florida,, durlm; the period of
for the C-130 and 26 June 1964 to 22 July
objectives were to determine:

the internal defoliant dispenser,
were conducted by APGC, Ef-.lin Air
2 October 1963 to 20 December 1963
1964 for the C-123. The test

compatibility of the dispenser with the aircraft
capability of instillation
servicing (refilling) capability
removal'of the dispenser from the particular aircraft in accordance with Hayes* operation and maintenance manuals
are.?, coverage capability.
It was fouvi'l during these/evaluations that the dispensers were compatible
with both aircraft. The aircraft commander reported no unitsu.il effects on
the flight characteristics of either aircraft in transporting the loaded dispenser.
Dispenser iiv-t .illation and removal tests scheduled for the C-130 aircraft
were not accomplished due to desip.n chanr.es that affected the [-.round h a n d l i n g
of the dispenser. Three i n s t a l l a t i o n and removal tents wen- conducted durin-.-,
the C-123 test program. The three t»-sts (install and remove) required 12,
5, and It manhours, respectively. Thr&gt; refillini-. procedure as recomnendcd by
Hayes' operations and maintenance nanuals was satisfactory but somewhat inefficient (40 minutes per dispenser for the C-lJO aircraft). A r;e 1 f - 1 i 11 infeature was incorporated by Hayes prior to the C-123 test, program which
reduced the time required to f i l l each tank iron 40 minutes to 20 ninultv;
when fillinc, is done from 35-tviilon drum::.
The area coverage capability test of the dispenser (s) in the C-130 and
C-123 aircraft was conducted to determine ground concentration of defoliant:
agent (gallons per acre), swath width (feet.), droplet si/.e (microns), and
flow race (gallons per minute). The desired ground concentration of three
gallons per acre for a 120-foot swath width was not obtained. Figure-; ') and
10 illustrate typical agent deposition from the tvo aircraft. In both test--;,
the desired droplet size of 150 to 30G milrons mass median diameter was
obtained. The maximum flow rate obtained during' the C-130 and C-123 tests
were 390 and 275 gallons per minute, respectively.

13

�C-123 AIRCRAFT

SWATH WIDTH (FEET)

Figure 9. Typical Agent Deposition (C-123 Aircraft)

�C-130 AIRCRAFT
6 CPA (GAL)

5GPA

H
o

4 CPA

03
O

Q '
, 3GPA

I

2 CPA

—
I GPA

210

180

150

120

90

60

30

30

SWATH WIDTH (FEET)

Figure 10. Typical Agent Deposition (C-130 Aircraft)

60

90

�SECTION IV
SYSTEM PERFORMANCE
Liqiii d -Level Gago Ca lib rat ion
Before any system performance tests could be conducted, it was necessary
to calibrate the liquid-level gage which is mounted on the siiie of the defoliant dispenser.
To calibrate this gage, the dispenser was first weighed in the empty
condition and the weight recorded. The t.ank was then filled with water to
the 1/4 mark on the gage and weighed. Water was then added until the 1/2
mark on the gage was reached, and the tank again weighed. Filling then
continued to the 3/4 mark and the weight: recorded. The dispenser Was then
filled to the "Full" level and the weight recorded. At this point, the water
was pumped out through the spray valve until it reached the level at which
the float switch cuts the system off. The dispenser was then weighed again
and the weight recorded. This procedure was repeated twice to obtain an
average weight for each level.
From these weights, the volume (in gallons) was calculated for each
level on the gage, The results were:
Gage. Level

Volume (Gal)

Full

958

3/4

807

1/2

495

1/4

184

Float Switch Cut-Off

54

Conversion Factors for Various
All system performance testing was conducted using water as the agent;
however, values were also needed for the agents which are used in the system.
For this reason, additional small-scale tests were conducted to determine
factors whic. could be used to convert the values obtained for water to
values for each agent.
To determine chc conversion factors applicable to refilling the tank,
a small pump rated au 2.3 gallons per minute was used to pump one gallon of
water and one gallon of each agent from one container into another through
3/4-inch tubing. The time required to accomplish this for each liquid was
recorded. The conversion factors were then calculated by dividing the average values of pur.iping time for each agent by the pumping time for water.
17

�Results wore as follows:

Specific Gravity

Viscosity
(75°F)
(Cent is tokos)

Conversion
Factor

Purple

1.27

38.2

1.161

Orange

1.27

38.2

1.161

Blue

1.335

8.8

1.124

White (Tordon 101)

1.15

243.0

1.312

Agent

In determining conversion factors applicable to the gravity dump time
through the A/A45Y-1 dispenser's emergency dump valve, a Zahn #3 cup was
used. Forty-four millilitcrs of each agent and water were allowed to flow
through cup and the time recorded for each. Here, again, conversion factors
were obtained by dividing the values for each agent by the value for water.
Results were as follows:
Agont
Orange

Conversion Factor
.

0.90

Purple

0.90

Blue

0.85

White (Tordon 101)

1.45

Refill by Moans of tlio Internal poi'oll.-mt Dispenser Jet Pump
The apparatus used in performing this test is illustrated in figure 11.
It was set up such that the inlet end of the refill hose was at the same
elevation as the jet pitnp so that induced head loss would not be present.
Using a ten-foot section of refill hose (MIL-H-8974-32), the time was recorded for filling che dispenser to the 1/4 level on the liquid level gape.
The water was then .pumped out until the float switch cut off the system.
Time was then recorded for filling the system to the 1/2 level. This procedure was repeated for 3/4 and "Full". Three tests were run at each level
in order to obtain an average time. Those tests were repeated using 20, 30,
and 50-foot lengths of refill hose.
The values of refill time obtained for water were converted to the agent
values by the methods discussed in Lho previous section. Refill time as a
function of quantity of liquid is presented in figures 12 through 15 for each
agent.

18

�JET PUMP
59 GAL DRUM

WATER
SUPPLY
LINE

Figure 11. He-fill Test Apparatus

�1000

FULL LEVEL (958 GAL)

3 4 LEVEL (807 GAL)

1/2 LEVEL (495 GAL)

to
o
ORANGE OR PURPLE

WHITE (TORDON 101)
1/4 LEVEL (1S4 GAL)

100
FLOAT SWITCH CUT-OFF LEVEL (54 GAL)

10

11

12

13

14

15

REFILL TIME (MINUTES)

Figure 12. Refill Kate with Various Agents Using A 10-Foot Length of
Refill Hose

16

1?

18

�1000

FULL LEVEL (958 GAL)

3 ' 4 LEVEL (807 GAL)

1 2 LEVEL (495 GAL)

ORANGE OR PURPLE

WHITE (TORDON 101)
1/4 LEVEL (184 GAL)

100

FLOAT SWITCH CUT-OFF LEVEL (54 GAL)

10

11

12

13

14

REFILL TIME (MINUTES)

Figure 13. Refill Rate with Various Agents Using A 20-Foot Length of
Refill Hose

15

16

17

18

�1000

FLOAT SWITCH CUT-OFF LEVEL (54 GAL)

11

12

13

14

15

Figure M. Kefill Hate with Various Agents Using A 30-Foot Length of
Hel'ill Hosts

16

17

18

�1000

FULL LEVEL (958 GAL)

3 4 L E V E L (807 GAL)

o

1/2 LEVEL (495 GAL)

o
ORANGE OR PURPLE
300

^ WHITE (TORDON 101)
1/4 LEVEL (184 GAL)

200

100

FLOAT SWITCH CUT-OFF LEVEL (54 GAL)

1

2

3

8

9

10

11

12

13

14

15

REFILL TIME (MINUTES)

Figure 15. He-fill Rate with Various Agents Using a 50-Foot Length of
He-fill Hose

16

17

18

�Emergency Dump Test
In determining the dump rate through the A/A45Y-1 emergency dump valve,
the tank was filled with water three times to each of the liquid levels indicated on the liquid level gage. In each case, the valve was actuated
electrically and the flow of water from the tank timed until the water level
reached the float switch cut-off point (54 gallons). The values of time were
converted for each agent and plotted as a function of gallons of water or
agent to be dumped (figure 16).
FlowRate Test Using an Induced Pressure
The objective in conducting this test was to determine the flow rate of
the dispenser for any given pressure or head. The apparatus used in the
performance of this test is illustrated in figure 17. A flowmetcr (Scries
5000, Pottermeter) with a three-inch nominal inside diameter was mounted to
the downstream side of the spray valve. A three-inch manual gate valve was
mounted immediately downstream of the flowmeter. In addition, an indicator
(Potter Aeronautical Corporation Model 519) was connected to the flowmetcr
to indicate flow rate in gallons per minute.
In conducting the test, pressure was induced into the system by manually
changing the orifice area of the ga.te valve thus varying the restriction imposed upon the flow of water. At all times the level of the water in the
tank was held between the "3/4 level" and "full" to iisure the same positive
head of liquid on the suction side of the pump and a constant engine speed ot
3600 RPM was maintained. At each position of the gate valve blade, the spray
valve was electrically actuated to the open position. The pressure from the
indicator on the console and the flow rate from the flow indicator were
recorded. The test was conducted three times, moving the valve blade from
"closed" to "full open" in small increments, to insure reliable data.
The test results were plotted in terms of induced back pressure versus
flow rate. The conversion factors, previously discussed, were applied to the
values for water and curves were plotted for the specific agents involved.
These test results arc presented in figure 18.
System Pressure Loss Analysis
The purpose of this analysis is to ?.»«.ilytlcally determine the dispenser
pressure loss at various fluid flow rates. In the following section the
results of the analysis is combined with the previously mentioned flow rate
test to form the dispenser performance range.
The majority of the formulae used in this analysis is extracted from
Reference 2. Many of the values used are extracted from Reference j{. When
a formula or value taken from this paper is used, the page number ofl which
it is found is noted on the right hand side of the page.

24

�1000

i

i

i

r^

FULL LEVEL (958 GAL)

7

900

3 4 LEVEL (807 GAL)
800

\WATER

BLUE-

7

700

ORANGE OR PURPLE'

a. £00

500

1 7 LEVEL (495 GAL)

z

in
O
_J

O

\ WHITE

T

(TORDON 101)

3
O
Ul
(O

400

L

7

7

300

'/

200

1.4 L E V E L (184 GAD-

100

FLOAT SWITCH CUT-OFF LEVEL (54 GAL)

10

20

30

40

50

60

70

DUMP TIME (SECONDS)

Figure 1C. Emergency Dump Kate for Various Agents with A A'15Y-1
Dump Valve

80

�3 IN. MANUAL GATE VALVE

Figure 17. Flow Rate Test Apparatus
First of all, the line sizes must be determined.
Determination of line size from tank to spray boom:
Requirements:

400 p,pm @ 15 ft/sec

v

= 0.408 Q/d2

d

= 0.408 Q/v
400
0 408 15

d

=

3.298 inches
26

Page 3-2

�90 -t

S

80

ID
*/&gt;

S
a.
o
£

o

S

70

60H

i
o

50
40-

30
20

0

100

200

FLOW RATE - CPM

Figure 18. System Performance Test Results

400

�However, the 3-inc'i suction and discharge ports on the Gorwan-Rupp pump
necessitated using 3-inch outside diameter (O.D.) tubing with a 0.0d25-inch
wall thickness. Thus, a slit-Jit: increase in velocity occurs.
The fuselage-mounted spray boom is constructed of 4.5-inch O.D. stainless steel tubing with a wall tliicknoss of 0.237 inches. The increase in
line size in the boom was dictated by structural stiffness requirements for
Ll.e C-130 aircraft which has a considerably greater speed capability than
the. C-123 aircraft.
The agent which is pumped through the tubing system shown in figure 19
has a specific gravity of 1.3 and a viscosity equal to 30.0 ccntistokes @
The total head is found in four parts. The first part to be. analyzed
is the suction line; i.e., the section of line between the spray tank and
the pump.

Suction Head:
Suction line velocity:
Page 3-2
Equation 3-2

.408

.408

v

=

(2.S75)2

10.74 ft/sec

Reynolds number:
Page 3-2
Equation 3-3

32.2
/-Co.

=

JJJc

8.2 x 10-4

(81.2&gt;(0.240)(19.74)
(32.2) (8.2 x 10'4)

Rc

= 1.456 x 104

28

Page 11-5

�359.1 1

A
=^

y

WHtRL JET SPRAV NOZZLE - NO 3 &lt; Bl?0
5C-ELBO*
REDUCER OME INCH TO 3 i
1 IN POPPET V A L V E
VEE B*Mt&gt; COUPLING

3 IN DIA FLEX LINE
3 IN. POPPET CHECK VALVE

3 IN. VALVE - WOTOR OPERATED
3 IN VALVE - MANUALLY OPERATED
PUMP - MOTOf! DRIVEN
SUCTIOMCONE
PIUKIO O U T L E T
'1 IN LilA LINE
TAIL BOOM - 4 1 2IN. 0 0

19. A/A45Y-1 Fluid Flow Schematic

�Friction factor:
For a 3-inch SolieiUilc-40 pipe at a flow having an RC = 1.456 x 10*
the friction factor Is:
f

=

0.029

Page A-25

= £ - .'°4 = 1.38
C
.029

Page A-26

Suction cone:
L/D

12 inch radius 90° bend:
L/D

=

13.6

Page A-27

L/D

=

7.5

Page A-27

30

Page A-30

12 inch radius 29° bend:

Schedule 40

90° standard elbow:
L/D

=

Exit into pimp:
L/D

= £ = —L. =
f
.029

34.43

Summation o£ L/D's:
L/D

=

1.38 +

13.6 +
L/D

L

7.5 +

*=

=

34.48

86.96

= (DHL/0) =
L

30.0 +

(69)(.4)
8.6 020

20.87 feet

Total equivalent length oC pipe:
L

=

2/12 +

L

= 0.167 +.1.0
L

12/12

=

+

53/12

+ 4.417 *

26.,45 feet

30

+

20.87

20.87

�Head loss due to flow through suction cone, tubing, bends, and exit
i n t o pinup:
hL
h,
L

=
hi.

=

0.1863

0.1863
=

&amp;—

Page 3-2
Equation 3-5

d

2.875

19.368 foot of a«;cnt

Head loss for 9-incli f l e x i b l e hose (3-inch O.D.):
For AGO gpm, the pressure drop is 0.7 p s i / f t

0.7 p s i / f t x 0.75 ft
hL

=

(0.525) (2. 31)

hL

=

=

(1.213)(1.3)

=

Anaconda
Catalog G-700,
Page D-5

0.525 psi

1.213 feet of water

=

1.577 foot of agent

Head loss for a 3-inch gate valve:
The formula for

A l l in inches is:

For 400 gpin, /'-.I I
hL

=

(7. 34) (1.3)

=

=

AH

=

0.0000:459Q2

7.34 inches

O t 7 9 6 Fcot of agcnt

Total Suction Head:
hL

=

14/12

+

19.368

+

1.577

+

0.796

hL

=

1.167

+

19.368

+

1.577

+

0.796

hL

=

22.908 feet of agent

Next the head is found for the discharge l i n e ; i.e., the line between
the ^ump and the spray boom.: The line velocity and the friction factor arc
the same as for the suction line.
i

Sharp edged entrance to pump:
L/D

=

£ =
f

-.*
°.5
0.029

=

17.24

Page A-26

�Two (2) Schedule-40

90° standard elbows:

L/D

45°

-

()3) =
2(0

60.0

Page A-30

12-inch radius:
L/D =

(40(53 =
1.).3)

7.50

Page A-27

45° Miter bend:
L/D

45°

=

15.0

Page A-27

9-inch radius through fuselage:
L/D = 12.0(.533) = 6.4

Summation of L/D's:
L/D = 17.24 + 60.0 + 7.5 4- 15.0 + 6.4
L/D
L

=

L/D(D)

-

•=

106.14

(106.14)(0*240)

=

25.47 feet

Total equivalent length of pipe:

L

=

L

=

14
18
21.5 . 26.75 . 192 , 46.625 . , , - , - ,
12 + 12 + ~TT + ~W~ T T2 + ~12~ + 25 ' 47
1.167 + 1.500 + 1.792 + 2.229 + 16.00 + 3.885 + 25,47
L = 52.043 feet

Head loss due to flow oF agent through elbows, bends, tubing, and
sharp-edged entrance to pump:
hT

h.

=

L

hL

&lt;=

0.1863

0.1863 ( . 2 ) (52.043)(19.74)
009
2.875
=

38.109 feet of agent

Head loss for 3-inch check valve:

32

�Tlio formulae for the pressure drop and lici.nl loss thronj'.li t h i s
chock valve are:
1
A P = .-0.005Q +
l«l. =

2.0

CAP)(2.3l)(S)

For tin- Q of /»00 npm:
AP

= 0

therefore
However, for flow ralos loss than A 00 upm, there w i l l he a p p r e c i a b l e head
loss.
lleaJ loss Tor 'Uinch v.ate v a l v e :
Tliis value is Hie same as for t h e \\mc v a l v e In the sue- 1 ion l i u o .
iij

=

0.7% feet of ai-.fnt

Head loss for C l o x i b l o hose ( J - i n o l i O.D.):
Tlu-ro are llireo (3) sod ions of f l e &gt; - i h l e l i n e between the spr.iy
valve and the spray boom.
I,
Pressni-e drop

=

.:

K ». 'yS^JjJvjq

0.7 p s i / f t

b (j =
!),_

=,

20.80 feet

(see l &gt;-iiu-h f l e x hose in sue I ion l i n e )

(0.7 |&gt;si/l'l)(:&gt;O.K'))C&gt;. •}]) (!..:&gt;)
= A 3.0 1 J foe( of at-ent

T o t a l Dl.sehari',0 Head:

-Ih. '-

:W.lO l l
h.

0.7'K.

-I-

0.7'Xi

+ 4J.'M3

= 8 2 . 7 I A feet: of no'nL

-

�At this point in the system, the flow of agent leaves the 3-inch lino
and enters the spray boom, which is shown in figure 20. The line size for
the spray boom has .already been determined as 4.5-inch O.D. stainless steel
pipe with a wall thickness of 0.237 inches. The nozzle arrangement is
symmetrical about the centerline of the spray boom; however, the entrance to
the boom is offset approximately six feet from the centerline. In this
analysis, the worst condition, which is the longer section of spray boom. Is
analyzed for a flow rate of 200 gpm.
There are a total of eighteen nozzles on .the spray boom. Each nozzle
dispenses agent at a rate of 400 gpm/18 nozzles or 22.22 gallons per minute.
As the flow passes each nozzle, the total flow rate is reduced by this amount.
With each chance in flow, the agent velocity, friction factor, and Reynold's
number also change. These values must be recalculated at cacli nozzle location in order to find the head loss in the next section of line.
In calculating the spray-boom head loss, the first head loss is
encountered where the 3-inch O.D. discharge line exits into the 4.5-inch O.D.
boom. This is calculated on the basis of a sharp-edged exit.
K

=

L/D
L

1.00

=

- L/D(D) =
L

=

Page A-26

34.48
(44) (,4)
3.8
020

81275 feet

Head loss due to exit from discharge line:
h.
L
h
L

=

0.1863 ~^d

= 0 1863 ( , P29) (3.275) (19.74)2
0•
" '
2.875
hT

=

6.059 feet of agent

Station 0.0 to Sfation 149.63
/.a r,i

12.47 feet

34

�STA
25138

SI*
233 A3

STA
22163

STA
20ft]

STA
19763

STA
IBS 43

STA
1736}

STA
16163

STA
1496}

STA
CC

4
SYMETRlCAL
EXCEPT AS SHO»N

If"fl'"T

T

3-E

I

!—17 3 i-

• 7 EQUAL SPACES — -

101 3 4

Figure 20. A, A45Y-1 I^usclagc-Mounted Spray Boom

�Velocity:
v

v

.408 Q/d 2

=

,408

=

20
°
(.2)
4062

.0
48

v

=

16. 087 /

5.034 f i / s e c

Reynolds number:
Dv

R0

32.2 /rc
(81.12)(.3355)(5.034)

32.2 (8.2 x

=

R0

I0"f)

5190

Friction factor:
f

=

0.037

Head loss:

"L
IIT
L

.1863^

1863 ( . 0 3 7 ) ( 1 2 . A 7 ) ( 5 . 0 3 4 ) 2
4.026

=
'
j^

=

=

0.541 foot of agent

Station 149.63 to Station 161.63
L
Q

=

=
Q

=

3G

1.0 feet

200 - 22.22
177.78 B pni

�v

.408 Q/il 2

=

177.78

v

"

.408

v

=

4.47 1 } f l / s o c

(4.02() 2

(8l.l2)(.333--,)(4.475)
( 3 2 . 2 ) ( 8 . 2 x 10*')
Re

0.038

hL

h,

=
ll|

=

,18ft 3

.J863
=.

-

.015

s

4.026
fCH't

Of

flJ'.CMlt

S l a t i o i i 161.63 I o S t a t i o n 173.63
L

Q

=

=

177.78

-

1.0

foot

22.22

=

135.56

(4.026) 2
v
R0

=

=

3.&lt;)H) it /sec

_(».!. U) (.33!&gt;5)
( 3 2 . 2 ) (8. 2 x 10-'1)
Re

=

1030.90
R0

=

x

4037

x

velocity

velocity

�f

hL

=

(.040) (1.0).(3.916)3

.1863

.

h^

=

0.040

0.028 feel of agent

Station 173.63 to Station 185.63
L
Q

=

v

155.56

=

.408

Rc

«
-

1.0 feet
22.22

14

• ,
(4.026) 2

=

=

f

.-

l«

T

'=

=

= 3.356

ft/sec

3460

0.0415

(.0415)(1.0)(3.356) 2
1 nir
4.026

-,«&lt;•-.

J

.1863

=

133.34 ft/sec

1030.90 x 3.356

Re

,
h

=

0.022 feet of aj;cnt

Station 185.63 to Station 197.63
L
Q

=

133.34

=
-

38

1.0 feet
22.22

=

111.12 gpm

�v

v

Re

=

/ft0
.408

=

=

1T.I.12
(4.026)2

2.797 ft/sec

1030.90 x 2.797

t

=

=

2883

0,044

(P044)(1.0)(2.797):
* f 4 7 0 2 6

,0,,
.1863
h^

=

0.016 feet of agent

Station 197.63 to Station 209.63
L

Q

v

=

=

1.0 feet

111.12

-

22.22

88.90

408

" Rc

=

= 2 238 ft/sec

-

=

2307

0.047

1863 (•0^7)(1.0)(2.238) :
4.026

-

L

h,

88.90 gpm

(1030.90)(2.238) =

f

h,

=

=

0.011 feet of agent

39

�Station 2 ' . 3 to Station 221.63
0)6

L

Q

-

88.90

=

1.0 Coct

-

22.22

=

66.68

66.68
v

=

.408

R_

=

2 =

(1030.&lt;&gt;C) (1.678)

=

0

IL

=

= 1730

0-037

"^
hj

1.678 ft/soc

4,026

0.005 foot of ap.ont

Station 221.63 to Station 233.63
L
Q

=

66.68

v

-

.408

R0

=

=
-

1.0 foot
22.22

, , , -.2

v
{ -t • VJ..O^

= 44.46 &gt;-,pm

=

1.119 f t / H o c

(1030. «())&lt; 1.110)

1 1 5'.

-10

=

=

0.055

1154

�hT . .1863
L

4.026

hL = 0.003 ffiet of agent

Station 233.63 to Station 251.38
-

Q
- Rc

.0
48

»

1.479 feet

22.22 gpm

22.22
(.2)
4062

=

0&gt;559 Et/scc

- (1030.90)(0.559) =

h, L

576.27

1863 (0.ni)(l.A70)(0|.559)2
'
4.020

hL * 0.002 feet of agent

Total Spray Room Head
Exit from discharge line
Station 0.0 to Station 149.63
Station 149.63 to Station 161.63
Station 161.63 to Station 173.63
Station 173.63 to Station 185.63
Station 185.63 to Station 197.63
Station 197.63 to Station 209.63
Station 209.63 to Station 221.63
Station 221.63 to Station 233.63
Station 233.63 to Station 251.38
Total Spray Boom Head

6.059 feet
0.541
0.035
0.028
0.022
0.016
0.011
0.005
0.003
0.002
6.722 foot of agent

41

�An illustration of the plumbing through which the flow of agent travels
from the point it leaves the spray boom until it enters the airstream is
presented also in figure 20. Since the maximum pressure change between
pump and nozzle occurs at the outboard nor.sle (Station 251.38), the head
loss is calculated at this station.
In leaving the spray boom, the agent flows through a sudden contraction.
However, the flow must also make a 30° turn. In order to properly analyze
this condition, the L/D ratio is found for a sudden contraction and also a
30° miter bend.

Head Loss -_ Spray Boom to Check Valve;
Flow;
Q

= 22.22 gpm

Velocity:

v=

-^TiToi^

v «' 8.239 ft/sec
Reynolds number:
R

e

(81.12)(.087)(S.239)
(32.2)(8.2 x 10"4)
Re = 2203

Friction factor;
f = 0.050
30° Miter bend:
L/D = 8.0
Sudden contraction:
d^ =

1.049 inches;

d., * 4.026 inches

T • 4.026
rr
d
42

Page A-27

�K = 0.43

Page A-26

K
0.43
f " 0.05

L/D

8.6

Summation of L/D's:
3.0 + 8.6

L/D

16.6

L « L/D(D) -f- 5'875
L =
L

16.6(.087) + 0.490
=

L

1.444 -t- 0.490
=

1.934 feet

Head loss:
h

=

L

1863 ( . 5 ) d.934) (8.239)2
000
'
1.049

hj

**

1.166 feet of agent

Check valve head loss:
Pressure drop = 1.85 psl @ 22.22 gpra

h^

=

5.556 feet of agent

Contraction upstream of 3/4 inch street elbow:
dj^

=

0.719 inches

d2

=

li = 0.801
d2.

K

=

O f 12

45
43

0.897 inches

James, Pond' &amp;
Clark, Inc.
Catalog,Pg 6.

�22.22

v » 17.537 ft/sec

R

=

(81. 12) ( 0 ) (17. 537)
.6
(32. 2) ( . 2 x 10"4)
8
Re = 3233
f - 0.045 ,

K
" I

0.12
0.045 •'

=

2 67
6

'

L = L/D(D) = (2.667) .(P-719)
L * 0.160 feet

hj

=

.1863 (-045)(0.160)(17.537)2

h^ = 0.573 feet of agent

90° street elbow:
L/D = 50

Average internal diameter
V

=

408

-

= 0.88 inches

22.22
(.82
08)

v = 11.707 ft/sec
R

=

(81.12)(.073)(11.707)
(32.2)(8.2 x 10"4)
Rc = 2626
f = 0.0475
44

.

�L

h

10

= L/D(D) =

=
L

S.O—^

«

3.67 feet

1863 (•M75)(3.67)(11.707)2
'
. 0.88

HL

=

5.058 feet of agent

Contraction downstream of 3/4-inch street elbow:
di

=

0.500 Inches
dl

d£

=

0.941 inches

_ 0.500

~

°5
'3

K = 0.32

v = 0.408 .(2.2!-2..2).
(0.50) 2
R

= 36.263 ft/sec

(81.12)(.042)(36 263)
(32.2)(8.2 x I ' )
D4

=
e

„

0.042

T/n
L/D

= — = --—•• 32 = 7
7
f
0.042
L/D(D) =
L

=

0.317 feet

=

1863 ( 0 2 ( . 1 ) 3 . 6 )
.4)037(6232
0.50

hL

=

6.523 feet of agent

Spray Nozzle:
From the data available in the Spray Systems Company Catalog 25, a
formula was derived to calculate the pressure required to dispense a known
flow of agent. The formula is:

45

�P = 0.069215 f Q per Kozzle
12
I Conversion Factor I
The value of the conversion factor can also be extracted from this catalog
if the specific gravity of the agent is known.
QPN =

22.22 gpm

C.F.

0.877

0.069215

P

•=

44.431 psi

(44.431 lb/in2)(144 in2/ft2)
81.12 lbs/ft3
=

78.872 feet of agent

Total head loss downstream of spray boom:
Spray boom to check valve:
Check valve:
Upstream contraction:
90° street elbow:
Dowastream contraction:
Spray nozzle:

1.166 feet
5.556
0.573
5.058
6.523
78.872
97.748 feet of agent

Total pump head for 400 gpm:
Suction head:
Discharge head;
Spray boom head:
Head downstream of spray boom:
Total Mead ( 0 gpm)
40

22.903
82.714
6.722
97.748

H

210.092 feet of agent

This analysis demonstrates the procedure lor determining the total
head for a certain agent at a certain flow rate. The head for any flow
rate can he calculated in the same manner. Likewise the total head £an
be found for any liquid agent hy changing the values for specific gravity,
viscosity, and the spray nozzle conversion factor.
46

�This procedure has been programmed for the IBM Model 360-30 computer.
The program was exercised for four different agents currently being used
in conjunction with the A/A45Y-1 system in addition to water. Flow rates
ranging from 1 to 400 gpm were analyzed. The agents and their characteristics are shown in the following cable.

Liquid Agent

Viscosity
(? 80°F
(Ccntistokcs)

Specific
Gravity

Water
Orange
Purple
Blue
White
(Tordon 101)

1.000
1.270
1.270
1.335
1.150

.

Spray Nozzle
Conversion
Factor

1.00
38.2
38.2
8.8
243.0 '

1.000
0.887
0.887
0.865
0.931

The results of the computer tabulations were plotted for total head
(feet) versus flow rate (gpm) and are illustrated in figure 21.

Dispenser Performance Range
Successful operation of the dispenser depends upon the ability of the
crew to recognize the dispenser's capabilities and limitations. The dispenser performance information presented herein is sufficient in scope to
permit an estimate of what may be expected of the dispenser under normal
conditions.
In order to determine the operating range of the dispenser, it was
necessary to perform a test to establish the pump performance curve and
secondly, to mathematically perform a fluid analysis of the entire dispenser from the tank to the spray nozzles. This test and analysis has bo:;,-!
explained in the two previous sections.
Figures 22 through 25 combine the aforementioned test and analysis
curves to establish the operating range of the dispenser for various chemical agents. The intersection of the two curves represents the maximum flow
rate obtainable at 3600 engine KPM.
In using these graphs, locate the desired flow rate on the horizontal
scale of the appropriate agent graph; move vertically to the point of intersection with the theoretical system loss curve; then move horizontally
and read the required pressure from the vertical scale. The speed (rpm)
of the engine must be adjusted while spraying, so that che required pressure
is indicated on the pressure indicator located on the control console.
The cross-hatched area labeled "Operating Range" encompasses all values
of back pressures or pressure losses that the system can theoretically pump
against as a function of engine speed and flow rate.

47

�UJ
UJ

u.

&lt;

UJ

£

200

FLOW RATE - GPM

Figure 21. System Pressure Loss

300

400

�9080-

70-

UI
HI

u.
1

a
&lt;

itto

o
o_

UJ

X

50100

40UJ
D.

302010-

o-

200

FLOW RATE - GPM

Figure 22. A/A45Y-1 Dispenser Performance Range - Agent: Water

�300

90-

200
,-PUMP PERFORMANCE CURVE - 3600 RPM

80-

70-

tu
ui

m

en

o

60-

1U

X

i

////,

50-

UJ

100

u
en
a.

40-

as m
^h

s

^OPERATING;
RAKGE ^

30-

20-

10-

0-

100

200

300

FLOW RATE - GPM

Figure 23. A/A45Y-1 Dispenser Performance Range -Agent: Orange
or Purple

400

�9080-

7060Q.
i
01

o:

UJ
HI

u.
1

o

&lt;
til
X

5040-

Of

Q.

30 -

20-

10-

0-

100

200

FLOW RATE - GPM

Figure 24. A/A45Y-1 Dispenser Performance Range - Agent: Blue

400

�300

90-

200

^Tmrr-^

8070to

o

60-

ui
ui

X

a.

V//7WK

50100

UJ

ce

A

M

L3
UI

tfs

ae.

• PUMP PERFORMANCE CURVE - 3400

40-

X
-MAXIMUM PERFORMANCE POINT

CL

30-

\THEORETICAL SYSTEM LOSS CURVE

100J

100

200

300

FLOW RATE - GPM

Figure 25. A/A45Y-1 Dispenser Performance Range - Agent: White

400

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6692">
              <text>025</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6694">
              <text>0363</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6697">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6689">
                <text>Smallwood, A. M.</text>
              </elementText>
              <elementText elementTextId="6690">
                <text>R. L. Dear</text>
              </elementText>
              <elementText elementTextId="6691">
                <text>A.R. Ortell</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6693">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;Hayes International Corporation</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6695">
                <text>1967-10-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6696">
                <text>Internal Defoliant Dispenser A/A45Y-1</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6698">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6699">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6700">
                <text>herbicide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1415" public="1" featured="0">
    <fileContainer>
      <file fileId="1231">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/bbe3dd5ae7a23003154d445c92e1fa7b.pdf</src>
        <authentication>2829adad1af30d0df77eb7a31551d451</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63180">
                    <text>Item ID Number

0031G

Author

Young, Alvin L.

Corporate Author
Manuscript: Meeting Notes: Meeting with Dr. Terry
Biery and Lt. Col. George Rowcliffe at AF/Pest Control
Board Meeting, WRAMC, Washington, D.C., 13
September 1979

Journal/Book Title
Year

000

°

Month/Day
Color

Ll

Number of Images

4

Desoripton Notes

Monday, January 22, 2001

Page 316 of 341

�13 £c

���- TV L. &amp;jgtfo
'.

^r

A,&lt;"oa
^i

r^€^oUoi^j0etc

LA&amp; ^r'csQ*^ V

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6567">
              <text>020</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6568">
              <text>0316</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6570">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6566">
                <text>Young, Alvin L.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6569">
                <text>Manuscript: Meeting Notes: Meeting with Dr. Terry Biery and Lt. Col. George Rowcliffe at AF/Pest Control Board Meeting, WRAMC, Washington, D.C., 13 September 1979</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6571">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6572">
                <text>Ranch Hand aircraft</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1373" public="1" featured="0">
    <fileContainer>
      <file fileId="1206">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/58a7d9a18a2abe0dd4ae92d2e5b0789b.pdf</src>
        <authentication>c843cda6ed20c9de795623c8c12e1d65</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63155">
                    <text>Item ID Number
Author
Corporate Author
Report/Article Title Memorandum: Requirement for Defoliant Agent White,
|18 September 1967

Journal/Book Title
0000

Year
Month/Day
Color

n

Number of Images
Found in a file labeled: "Correspondence Concerning
the Use of Defoliants in SEA and the Role of Air Force
Personnel, Nov 1962 - Oct 1967"; date stamped 19
Sep1967

Monday, January 22, 2001

Page 252 of 341

�SEP
.TCB (Lt Reynard/882-2457)
icquireiaont for Defoliant Agent White
MMA (SAOQT/Mr. Vanderventer)
APGC (PGOW) has stated a need for 1500 gallons of Tordon 101
Wiite). This agent will be used for spray tests with the C-123K
lirci'aft.
!. Reference Confidential TWX AFRDQ 78693, 13 Jul 67 has authorized
.dequate allocation of defoliant for these tests. In view of the
trgency of this testing, AFATL requests an expedited shipment of
gent White to:

Transportation Officer
AFB 2823
AFATL (ATCB/Lt Reynard 882-2457)
Eglin AFB, Fl 32542
'OR THE COMMANDER

1. COX, Colonel, USAF
:hief, Bio-Chemical Division

Name, Office^,Symbol of Originator
AFATL Form . ^ COORDINATION SHEET
06
Nov 1%6

Date

Phone

Typist's Initials
AFSC - EOL^N^&amp;^T1&lt;A.

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6240">
              <text>019</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6241">
              <text>0252</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6243">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6239">
                <text>Reynard</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6242">
                <text>Memorandum: Requirement for Defoliant Agent White, 18 September 1967</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6244">
                <text>herbicide white</text>
              </elementText>
              <elementText elementTextId="6245">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6246">
                <text>herbicide testing</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1227" public="1" featured="0">
    <fileContainer>
      <file fileId="1111">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/f6466e4a220a26a2f5aa0f104ad4f369.pdf</src>
        <authentication>ac11cb87888be563c26479549f6a3976</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63060">
                    <text>Item ID Number
Author

20
Anonymous

Corporate Author
Report/Article Title Minutes A/A45Y-1 Internal Defoliant Dispenser System Support Conference, 25 and
26 August 1966

Journal/Book Title
Year

™GQ

Month/Day
Color

M

Number of Images

4G

Pages 33, 34, and 38 fold out; includes addendum: memo and replacement page for
Item 9-66-2 of the minutes

Tuesday, November 14, 2000

Page 20 of 25

�Anonymous
1966
Minutes A/A45Y-1 internal defoliant dispenser
system: Support Conference

ES
A/A45Y-1 INTERNAL DEFOLIANT
DISPENSER SYSTEM

SUPPORT CONFERENCE
25 AND 26 AUGUST 1966

.r •^•^••Kjtr.&amp;.x.- *&gt;y:s'vrT«£?3n£*'

''^^^•M^^^-^^^&gt;'?'--'^^

- 'JOftSf-Z':'* - JSW--^ f'.&gt;5^ */S*^":/,' I

£&gt;*r*Sst

.-. ./-TSBS&amp;e'J*sS7-

. -. _ Sel.

'&lt;'*,;'.

J &lt;i'-J^--

�INDEX
Item Number

Title

Page Number

Summary

1

Section I

Introduction/Ranch Hand Report

2

Section n

A/A45Y-1 System Status
Technical Manual Status

3

Section DI
9-66-1
9-66-2

4

9-66-7

Action Items
Ground Support Equipment
TCTQ for Installation of A/A45Y-1 System in
UC-123B Aircraft, Class V Mod 1776
Retrofit Installation of MARK HI Engine
Spares
Retrofit Installation of Optimized (Redesigned)
Wing Boom onUC-123B Aircraft
Maintenance Data and Technical Order
Verification
Maintenance Training of Ranch Hand Personnel

13

Section IV

General Comments/Observations

14

Section V

A/A45Y-1 Defoliation Conference Attendees

16

Section VI

Distribution

17

Section VII

A/A45Y-1 Internal Defoliant Dispenser System
System Description
Capabilities and Limitations
Leading Particulars
Tank and Cradle Assembly
Control Console
Dump Valve
Spray Boom
Aircraft Installation
Viet Nam Ranch Hand Operations
Optimized Defoliant Handling System
Portable Defoliant Handling Unit

18

9-66-3
9-66-4
9-66-5
9-66-6

5
5
7
8
10
11
12

18
18
20
21
22
23
24
27
28
32
37

�Figure Number

Title

Page Number

Illustrations
Figure 1
Figure 4
Figure 5
Figure 6
Figure 7
Figure 10
Figure 15
Figure 16
Figure 17

Major Components of Defoliant Dispenser
Control Console
Dump Valve
Tail Spray Boom and Associated Plumbing
Wing Spray Boom
Existing Defoliant Transfer System Tan Son Nhut
Air Base, Viet Nam
Optimized Defoliant Handling System Layout
Defoliant Handling System Components
Tank Trailer Defoliation Liquid Refill

19
22
23
24
25
29
33
34
38

Photographs
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure

2
3
8
9
11
12
13
14

Defoliant Dispenser (right side)
Centrifugal Pump
Installation in C-123 (left side)
Installation in C-123 (right side)
Ranch Hand Work Area
Hour Glass Tank and Pump
Hour Glass Tank and Pump (insulated)
Hour Glass Spider Pump

20
21
26
27
30
30
31
31

�SUMMARY
1. The first Logistics Support Meeting for the A/AU5Y-1 Defoliant Dispenser
was held at Hayes International Corp, Birmingham, Ala., on 2li and 25 Aug 1966.
2. The purpose of this meeting was to review program status, evaluate
"Major Problem Areas", and initiate and assign action as required to assure
the timely and successful completion of program requirements for enhancement
of logistic support.
3. Areas within this program requiring action, further refinement and overall close surveillance are documented in section III and IV of these minutes.
Lu A follow-up meeting was determined essential in order to review progress
made on action items, reassess support posture, and include representatives
of agencies absent from this meeting.
5. The minutes of this meeting will be used as a basis of agenda for the
next meeting. Each action agency should complete their assigned action
in accordance with the scheduled dates, if possible, and be prepared to
present status of action taken at the next scheduled meeting. Additional
items may be added to the agenda for review and discussion at this time.
However, to assure adequate time for evaluation and staffing, it is
necessary that proposed agenda items be submitted to WRAMA (WRNQO) at least
one week before the scheduled meeting date.
6. The next meeting is tentatively scheduled at Hayes International Corp.,
Birmingham, Ala., 11-13 Oct 1966. Confirmation of date and location will
be provided by separate correspondence.
7. It is desired to take this opportunity to compliment each representative
for his active participation and support. Especially appreciated are the
efforts of Hayes International in hosting this meeting and the fine
assistance rendered. The productive results obtained and anticipated as
a result of this meeting will be beneficial to all agencies concerned, and
should improve SEJu-support and operational capability.

ROBERT N. SCHEIDECKER
Major, USAF
Chief, Operations Branch
Directorate, Materiel Management

�SECTION I
INTRODUCTION/RANCH HAND REPORT
1. Mr. W. B. O'Neal welcomed the conferees and opened the meeting.
Introduction was given by Lt William Crea, Air Force Project Engineer.
Status of the program was reviewed by Mr. Don Smallwood, Hayes Project
Engineer (Reference Section II).
2. Captain Peshkin gave the report from Ranch Hand. They are growing
very rapidly and a considerable number of problems have developed. As
early as January or February, it was realized that additional aircraft
were going to be programmed for SEA. Storage, maintenance, and training requirements were anticipated; however, no staff support was furnished after discussions with operations and maintenance personnel at Tan
Son NHut. Finally, the aircraft began to arrive. Storage problems still
exist as does spare parts support. Flying continues at approximately
25 sorties per aircraft per month. This is the MACV planning figure
for programming chemicals. Ranch Hand would like to be able to operate
from an additional operating location in the II Corps area to increase
sortie effectiveness. There are presently 9 aircraft in the country 3 at Da Nang and 6 at Tan Son NHut. The operation continues successful
because the equipment is basically good and the air frame is the best
available. The defoliant system has the same characteristics, simplicity,
and reliability. The main problems are as indicated below. Ranch Hand
has been fortunate in their maintenance support resulting in almost 100$ aircraft availability. Many of Ranch Hand's problems could be
helped by better staff support.

�SECTION II
A/A45Y-1 SYSTEM STATUS

ITEM

CONTRACT

1. A/A45Y-1
Prototype

08(635)3609

2. A/A45Y-1
Production

08(635)3609

3. Dump Valve
Kit

08(635)4894

4. Wing Boom
Prototype

08(635)5710

5. Wing Boom
Production

08(635)5710

6. Engine Mod
Mark III

08(635)4894

QUANTITY

DELIVERY
DATE

REMARKS

Sept. 1963

Used in C-130 Test
at Eglin
Systems started at
Hayes

20

Aug. 1964

Six Operational Systems
in Viet Nam. One
destroyed in C-123 crash
in Viet Nam. Seven
delivered to FairchildHiller Corp. for installation in C-123. One
awaiting dump valve and
will be shipped to Fairchild-Hiller. One remaining at Hayes for
Wing Boom Test. One
unassigned. Three
cannibalized for spare
parts by Eglin.

17

Aug. 1965

All operational
A/A45Y-1 systems
equipped with dump
valve.

Sept. 1966

Fabrication complete
by 23 Aug. 1966.

20

March 1967
(Anticipated)

Delivery to be 150 days
after approval of
Prototype.

15

Jan. 1967
(Anticipated)

Twelve to be installed
on new purchase of
twelve A/A45Y-1 by
WRAMA and the remaining three for
spares.

�TECHNICAL MANUAL STATUS

ITEM

STATUS

REMARKS

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

Awaiting validation of
System Manual.

In process review performed at
Hayes by WRAMA, 20 and 21
July 1966

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

In process.

Manual change to add Mark III
engine pump controls

T. C. T. O.
(Proposed)

No contractural
requirements. Never
was negotiated as per
supplemental agreement number 2.

Contractor recommends preparation of T. C. T. O. for installation of system in C-123 aircraft

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

In process.

Change to cover wing boom
program

T. C. T. O.

In process.

To cover installation of wing boom
A/A45Y-1 on C-123 for aircraft
T. O. 's
To cover installation of Mark HI
engine controls in field to retrofit
existing systems

T. C. T. O.

Awaiting receipt of 118A
and contract coverage

�SECTION III
ACTION ITEMS
Item Number 9-66-1 - Ground Support Equipment;
a. Problem Presented;
(1) There are four 1,000 gallon Transfer Tanks (Hour Glass) and one
2,5'00 gallon Fuel Servicing Unit, Type F-7 currently located at Tan Son NHut
with a 5&gt;000 gallon R-2 Storage Tank in the process of installation. There
are also three 1,000 gallon Transfer Tanks (Hour Glass) located at Da Nang.
The unsystemized arrangement and limited capacity of this equipment does
not give sufficient capability to; (1) Fill aircraft that are located at
Tan Son NHut, (2) Turn-around aircraft as rapidly as necessary, and (3)
Operate with the three different type chemical agents now being used. The
present system is characterized by the following; (a) Insufficient tank
storage capacity, (b) Insufficient transfer capacity which limits turnaround time, (c) Inability to systematically select proper chemical
appropriate to target requirements, (d) Inability to evacuate unused
agent from tanks in aircraft.
(2) The present system is progressively deteriorating due to
use of 1952 vintage Hour Glass transfer equipment. This system cannot
be supported and therefore will be eliminated from inventory at failure
or when sooner replaced. Glaring deficiencies of this system are as noted;
(a) Non-standard system, (b) Limited or no spare parts available, (c)
Fire hose used to connect transfer tanks deteriorates in from h to 10 days,
(d) Contamination of flow system (mainly due to rubber particles from fire
hose lining plus sand and other foreign particles introduced by siphoning
probes) because of lack of well thought out systems approach, (e) Inadequate
pumping capability (Spider pump used for siphoning agent from 55 gallon drums
is old and weak).
b. Progress to Date:
(1) An R-2 Storage Tank (5,000 gallon), salvaged from an R-2
Servicing Unit, is to be installed by Ranch Hand to provide additional
transfer and storage capability and is awaiting plumbing installation by
Base Civil Engineer. (Compatibility of this tank with existing chemical
agents is doubtful).
(2) One F-7 Servicing Unit is now in use with five more on order.
(So far this equipment is functionally satisfactory, but will need teflon
hosing and seals for compatibility with existing agents).

�(3) Use of ARMY Bladder Tanks for storage is being investigated by
377 Combat Support Group (Base Fuels), Tan Son NHut. (Question of agent
compatibility still remains) .
(I;) The A/AU5T-1 System has a self -filling capability, but was
found to be too slow and therefore incompatible with quick turn-around
requirement.
Use of B-l and B-1A Nitric Acid Servicing Units (2,000
gallon capacity) were proposed by Hayes as they were believed to be in
excess storage. Investigation by WRAMA Vehicle Manager revealed these
units to be unsatisfactory for their designed purpose and were dismantled
and removed from inventory.
c. Action to be Taken and Action Agency;
(1) Provide adequate bulk storage and pumping facilities for
three different chemical agents at two, possibly three different bases.
A requirement exists for the simultaneous filling of as many as nine
aircraft at Tan Son NHut and three at Da Nang with a possible total of
five at Da Nang and three at another operating location (does not include
Lucky Tiger). Action agency to be determined.
(2) Provide additional F-7 Servicing Units to Ranch Hand WRAMA (WRNR).
(3) Provide teflon hoses and gaskets for F-7 Servicing Units WRAMA (WRNR).
d. Forecast for Completion;
(1) Fixed facility - to be determined.
(2) Additional F-7 Servicing Units - accomplished.
(3) Teflon hoses and gaskets - to be determined.

�Item Number 9-66-2 - TCTO for Installation of A/AlpY-1 System in UC-123B
Aircraft, Class V Mod 1776:
a.

Problem Presented;

Eglin AFB Contract AF 08(635)-l|89lj, dated 20 Oct 1963', provided
a line item for data in accordance with DD Form llj.23 covering preparation
of TCTO for installation of A/Al^Y-l System in UC-123B Aircraft (AFPI 71r
;&gt;'31-(l8). Repeated attempts by Contractor, AFATL, and A/Al^T-1 IM have
been unsuccessful in obtaining from C-123 SSM appropriate documentation
(AFLC Form 118A) identifying type of TCTO and aircraft handbook revisions
desired. Ranch Hand representatives advised that considerable difficulty
is being experienced by Flight crews and Aircraft Maintenance personnel
due to lack of appropriate -1 Flight Manual Supplement and Aircraft
Maintenance Handbook data reflecting this systems installation. This
creates an obvious problem with operation and maintenance as well as a
serious problem with indoctrination of new crews due to high percentage
and frequency of personnel rotation.
k'

Pro gre s s to Da t e:

None
c. Action to be Taken and Action Agency:
(1) WRNB initiate documentation for preparation of TCTO
covering installation of basic A/Al^Y-1 system using Hayes tail boom
and de-modification of aircraft (removal of tank and cradle assy) back
to cargo configuration.
(2) WRNB initiate documentation for preparation of TCTO
covering installation of Ranch Hand wing and tail boom and marriage with
basic Hayes A/Al^Y-l System.
(3) WRNB establish requirement for preparation of Aircraft
Maintenance handbooks concurrent with requirement for respective TCTO's.
(li) "WRNB initiate immediate action to provide Ranch Hand with
required supplement to T. 0. 1C-123-1 Flight Manual reflecting Defoliant
Spray configuration.
d.

Forecast for Completion:

Delinquent - In view of non-participation in this meeting by
C-123 SSM personnel, a report of intended action and progress made is
required at next meeting tentatively planned for 11-13 Oct 1966.

�Item Number 9-66-3 - Retrofit Installation of MARK III Engine:

a. Problem Presented;
AFATL (ATCB) has provided for complete modification kits to
retrofit present operational Ranch Hand Dispensers, utilizing MARK I
and MARK II engines, to latest ARMY standardized MARK III engine
configuration. The A/Al^Y-l system has not been made full standard
by AFSC; therefore, responsibility rests with AFSC to provide retrofit
kits and required TCTO for Field installation.
b.

Progress to date;

Required number of kits have been placed on Contract AF 08(635)-k&amp;9k with Hayes International.
c. Action to be Taken and Action Agency:
(1) AFATL (ATCB) submit request to WRAMA (WRNSTR) for AFPI 18
covering this modification and appropriate handbook revisions.
(2) WRNSTR provide AFPI 18 as required.
(3) Contractual provisions by AFATL for TCTO and handbook
revis ions.
d. Forecast for Completion;
(1) 25 Sep 66.

(2) Provide AFPI to AFATL within five days after receipt.
(3) To be determined - contingent on authority for reprogramming funds within project 2^25 and subsequent initiation of
Purchase Request.

�(2) Reference a(2) above. WRAMA (WRNQ) will review this problem
with appropriate personnel at "WRAMA and Eglin AFB to determine specific cause
and remedial action.
(3) Reference a(3) above. WRAMA (WRNQ) will review end item
spares requirements to determine proper course of action necessary to provide adequate spare assemblies to support Field operations where battle
damage or loss might be incurred requiring complete assembly replacement.
Coordination with the using activity will be required.
d. Forecast for Completion;
(1) Reference c(l) above.
(a) Revision of AFLC Form 2? - 15 Sep 1966.
(b) Spare parts recomputation - lii Oct 1966.
(c) Release of spare parts orders to contractor/vendors to be determined based on method to be employed.
(2) Reference c(2) above. 13' Sep 1966.
(3) Reference c(3) above. 30 Sep 1966.

�Item Number 9-66-14 - Spares;
a. Problem Presented;
(1) Requirement for M&amp;O spare parts for support of A/Ai^I-1
System is expected to reach critical proportions in the very near future
due to, (1) increase in number of spray aircraft, (2) late provisioning
action in relation to first operational units, and (3) system contamination by grit and rubber particles resulting from poor system arrangement
and servicing equipment that is incompatible with presently used chemical
agents. Also, WRAMA has received a flood of requistions for spare parts
exceeding initially provisioned quantities, which did not consider system
contamination problem. Lack of spare parts support is a limiting factor
in Ranch Hand operations.
(2) Spare parts orders are not being received by Hayes from
Eglin AFB, procurement agency (APGC), in a timely manner.
(3) No provisions have been made to procure and stock spare
complete assemblies, such as, Tank and Cradle Assembly, Engine and Pump
Assembly, and Control Console Assembly.
b.

Progress to Date:

(1) Reference a(l) above. A quantity of stop-gap spare parts
were procured by AFATL on Contract AF 08(63£)-U89U. However, these have
proven inadequate to sustain desired degree of Ranch Hand operation
pending delivery of spare parts as a result of formal provisioning by
WRAMA. Some support has been furnished by Hayes International through
their engineering representative previously stationed with Ranch Hand.
Further, WRAMA and DCASO at Hayes are working together with the contractor
in an attempt to expedite vendor delivery of specific spare parts.
(2) Reference a(2) above. A previous review of this problem
with Eglin AFB, procurement activity, was supposed to have alleviated
this condition or at least improved flow of documentation from Eglin
to Hayes. Further investigation is in order.
(3) Reference a(3) above. No progress to date,
c. Action to be Taken and Action Agency;
(1) Reference a(l) above. The programming check list (AFLC
Form 2?) will be revised to reflect increase in number of systems and
bases to be supported, and spare parts requirement will be recomputed
for appropriate procurement action.

10

�Item Number 9-66-5 - Retrofit Installation of Optimized (Redesigned) Wing
Boom on UC-123B Aircraft:
a. Problem Presented;
No authorization currently exists for installation of the Optimized
Wing Boom on Ranch Hand and Lucky Tiger Aircraft. The__wirig..,b,oqra,,npjrf.jgmpl.Qyed
by aircraft in SEA, is a ^wn-sl^dajd^^
"c^mpa"tible™¥itff~agen"t"s""n'o*w'"in use, and is not logisticailV"supportable,.
f-,,.
L™.,

« „„
„,

*

™

.

, v , ( ^ n . . ^ * ^ ' - * f !*.*
?-.*
&lt; w , h ™ « ^ - « ^ * " * " ' -•«!

•.•..^^-*«'^***«f-^^-^''*M'~'*^-mt*l**^™*^-*-»™-'*VKKf~f:&lt;i.-*KX***VJVKVt&lt;*VK*

b. Progress to Date:
The Optimized Wing Boom is presently being developed by AFATL
under Contract AF 08(635)5710 with Hayes International.
c. Action to be Taken;
The using command will establish appropriate requirement for
installation of Optimized Wing Boom.
d. Forecast for Completion:
23 Sep 1966.

11

�Item Number 9-66-6 - Maintenance Data and Technical Order Verification;
a. Problem Presented:
Maintenance data has not been provided field activities due to
delayed verification of technical order. This has created considerable
difficulty regarding system maintenance and identification of spare parts
requirements.
b.

Progress to Date:

Hayes has completed technical order draft in MIL Spec format.
Preliminary review of blue line draft has been accomplished by WRAMA at
Hayes. Equipment is currently available at Hayes and ready for verification.
However, it has a MARK I configured engine installed. The MARK III engine
is still pending delivery from vendor's plant where it is being mated to
the pump. It was agreed that the difference between the MARK I and MARK III
engine was not sufficient to warrant further delay in verification of technical order. WRAMA agrees to accomplish verification on existing equipment
with MARK I engine. Final draft is to reflect the MARK III configuration,
which will be verified against engineering drawings.
c. Action to be Taken and Action Agency;
(1) Hayes will take immediate action to establish a date with
WRAMA (WRNSTR) for verification meeting at Hayes. Time of meeting should
be established to allow a minimum of l£ days for proper notification of
participating activities. Ranch Hand representatives agreed there will be no
requirement for participation by their activity in this verification. In
lieu thereof WRAMA will explore the possibility of obtaining using command
assistance from personnel of SAWC at Eglin AFB, who have a current and
specific knowledge of .Ranch Hand operation.
(2) Assistance of the Hayes - DCASO Quality Office will be
required in the performance of this certification and will be primary
point of contact relative to WRAMA/Hayes coordination of proposed date
of certification meeting.
d.

Forecast for Completion:
At the earliest possible date.

12

�Item Number 9-66-7 - Maintenance Training of Ranch Hand Personnel
a. Problem Presented:
Newly assigned Ranch Hand Maintenance personnel upon arrival have
little or no knowledge as to maintenance of the A/AU5Y-1 dispenser due to
there having no prior training on this system. The resulting problems are
obvious.
b. Progress to Date;
None
c. Action to be Taken;
(1) Ranch Hand should establish and submit an official requirement in accordance with AF Regulation 50-9 to Air Training Command citing
type and scope of training required. However, due to extreme urgency of
existing requirement, it was requested by Ranch Hand that a contractor
representative (Hayes) be provided in the interim, pending development of
training capability by ATC. If interim contractor support for indoctrination
of Ranch Hand Maintenance personnel is not provided, some other immediate
means of training must be investigated.
(2) Discussion of contractor support indicated the most feasible
and expeditious approach would be use of an existing Eglin AFB contract.
However, this will require approval and funding by Hq USAF.
d. Forecast for Completion:
(1) Ranch Hand submit requirement as soon as possible.
(2) Final action on this requirement is yet to be determined.

13

�SECTION IV
GENEIUL COMMENTS/OBSERVATIONS

1. Forthcoming flight test of the protype optimized wing boom was
introduced as a discussion item by AFATL representative, Lt. Crea.
Also recognized was the recent diversion of UC-123B aircraft to
Dallas, Texas, pending deployment and voluntary participation and
support of Hayes International for the purpose of spraying insecticide
in encephalitis infected areas. It was noted that this disease is not
restricted to the CONUS as was indicated by an Associated Press report
reflecting loss of 381i lives so far this year out of 1616 cases throughout Japan. As a result of the tremendous effectiveness and publicity of
the C-123 spray operation in Dallas, it is envisioned that additional
requirements are forthcoming for use of A/Alji?Y-l equipped aircraft for
insecticide spraying on a world-wide basis, especially in SEA. Lt. Crea
indicated he would communicate with TAG regarding intended use of
insecticides with the defoliant system. If use is contemplated, TAG
will be asked to establish a formal requirement for test of insecticides
concurrent with test of defoliants during flight test of optimized wing
boom at Eglin during September and October 1966.
2. The Ranch Hand mission is not consistent with the mission of the
organization to which they are assigned. This leads to competition for
resources, maintenance, and Staff Support. Proper emphasis or priority
has not been placed on the defoliation mission thereby restricting the
establishment of appropriate facilities for storage and transfer of more
than one type chemical agent at Tan Son NHut and other operating locations.
A definite advantage is envisioned by identification of the defoliation
system as a weapons systems for the delivery and dissemination of chemical
ordnance. Specifically, one advantage of a weapons systems identification
would be to rationalize the storage and.loading problem by having the chemicals
handled by personnel who handle other Air Force ordnance. This could possibly
result in taking the aircraft maintenance people out of the ordnance loading
business. This was not introduced as a problem as appropriate agencies were
not in attendance for proper discussion and action assignment. However,
aforementioned weapons systems identification has considerable merit and
should be evaluated by PACAF and Hq USAF to determine specific advantages
to be derived for further discussion during next meeting.
3. A need was expressed by Ranch Hand for a pamphlet depicting defoliation
spraying in SEA covering subjects such as:
a. Chemical type, effect and hazzards.
b.

Type crop and vegatation recognition.

c.

Psyochological effect on populace.

�Such a pamphlet would be invaluable for indoctrination of new crews upon
arrival in SEA and would be used to supplement present verbal instructional
methods which are accomplished mostly during normal spray missions. Hayes
International expressed an interest in preparing such a manual as they have
the knowledge and capability. However,, discussion was deferred to next
meeting at which time it is hoped that the office of primary responsibility
may be able to offer some constructive advice relative to obtaining this
pamphlet.

15

�SECTION V
A/A45Y-1 DEFOLIATION CONFERENCE ATTENDEES

Mcij Robert N. Scheidecker, WRAMA
Capt Richard Peshkin, Ranch Hand
Lt William J.Crea, Jr., ATCB
SMS Charles Lightner, Ranch Hand
Mr. Gene Smith, WRAMA
W.B. O'Neal, Hayes
C.F. Conklin, Hayes
J.L. Harrington, Hayes
John Bonta, Hayes
Don Smallwood, Hayes
J.E. Merk, Hayes
Stan Burkot, Hayes
Ronnie Dear, Hayes
M.J. McMahan, Hayes

16

�SECTION VI
DISTRIBUTION
Nr of Copies

2
2

Activity

2

MACV
7th AF (DOPR)
(DMP)
(DAFSC/AFSC
Lia Off)
315th ACW (DO)

h

309th ACS (SASF)

1
1
3

1
1
h

377th CSG (DGM)
(D/fo)
377th QMS
llith ACW (Comdr)
PACAF (DM)
(DM)
(DMMB)
Hq USAF (AFRDDA)
(AFRDQRA)
(AFSMEAA)
(AFXOP)
(AFSMSDA)
TAG (DOFT-S)
(DOO-S)
(DORQ-FM)
ATC (ATTAT-B)
Dept of Aerospace
Munitions (GS-WC)
AFLC (MCMTA)
(MCMTE)
(MCO)
(MCOOM)
ASD (ASJB)

1
1
l
1
3
3

AFSC (SCSMM)
HQ RTD (RTTtf)
UljOSth CCT3
SAWC-LC
AFATL (ATCB)
SAAMA (SANM)

12

(SANNR)
(SAOR)
WRAMA (WRNQO)

Name
J-3 Chemical Branch
Major Haugaton
Lt Col McCellan
Maj Richard Engian
Lt Col Reddrick
Major Kline
Lt Col Ferguson
Major Dresser
Captain Peshkin
S/MSGT C. B. Lightner
Col Harris
Lt Col Carter
Major Sibley
Colonel Bradburn
Colonel Thomas B. Kennedy
Lt Col C. N. Powell
Maj ¥. A. McKinney
Lt Col Carter
Lt Col May
Mr. Ed Dougherty
Maj Vinson
Maj White
Maj Marshall
Capt Adams
Maj Novikoff
Lt Col Gibson
TSgt Gailes
Mr. Fields
Mr. Whitacre
Mr. Finch
Mr. Clark
Mr. Brown
Mr. Brothers
Mr. Pfiefer
Mr. Goodwin
Capt John R. Spey
Lt Col Huston
Lt Crea
Mr. Arthur Miller
Mr. Jack Burton
Maj R. N. Scheidecker

17

�SECTION VII
A/A45Y-1 INTERNAL DEFOLIANT DISPENSER SYSTEM

SYSTEM DESCRIPTION

The A/A45Y-1 Internal Defoliant Dispenser, designed and manufactured
by Hayes International Corporation, Birmingham, Alabama, is a complete
airborne defoliant dispensing system. The dispenser is packaged to permit
rapid installation into, and removal from, C-123 aircraft, with only minor
modifications required to the affected aircraft. (See figures 1 and 2.)
The Internal Defoliant Dispenser, Part No. A/A45Y-1, provides for loading,
transporting and dispensing of 1000 gallons of defoliant chemical, and in case
of an emergency, dumping the full load overboard in less than 45 seconds. The
tank and cradle assembly is mounted on detachable casters which are removed
before anchoring in the aircraft. A control console is electrically connected
into an electrical network which in turn is connected to the aircraft electrical
system, certain controls and indicators in the flight compartment and the electrically operated units within the system. Pressure is applied to defoliant
chemical, by an engine and pump assembly mounted on the same frame with the
tank. The defoliant is transported to a nozzle assembly mounted in the slipstream of the aircraft in such a manner that a strip 250 or 300 feet wide along
the line of flight is effectively covered. The nozzle assembly is designed for
the most effective atomizing of the defoliant and coverage of foliage to be
destroyed. The dispensing operation and, in emergency, the dump valve
operation can be controlled from either the control console near the tank and
cradle assembly or from the pilot's position in the flight compartment.
CAPABILITIES AND LIMITATIONS

The internal defoliant dispenser is capable of containing 1000 gallons of
defoliant which can be completely dumped overboard by remote control or
manually in less than 45 seconds. The pump is capable of maintaining 60 + 5
psi pressure during the normal 3- to 4-minute period of operational spraying.
Refilling the tank assembly is accomplished with power and equipment contained
within the defoliation dispensing system.

18

�A / A 4 5 Y - 1 INTERNAL DEFOLIANT DISPENSER

.TANK VENT

.MANHOLE COVER

DUMP VALVE
(SEE FIGURE 5)
TANK

LIQUID LEVEL

ENGINE EXHAUST

VIBRATION
ISOLATOR SEGMENT

CENTRIFUGAL PUMP
(SEE FIGURE 3)

TIE-DOWN
FITTINGS

MAIN SPRAY VALVE

RECIRCULATING
LINE
CONTROL CONSOLE
(SEE FIGURE 4)

JACKING LUG

TEMPERATURE
INDICATOR
JET PUMP
REFILL
CRADLE

NOTE:
SEE FIGURE 6 FOR TAIL
BOOM AND FIGURE 7 FOR
WING BOOM. FIGURES 8
AND 9 SHOW A/A45Y-1
INSTALLED IN C-123 AIRCRAFT.

Figure 1. Mo/or Components of Defoliant Dispenser
19

�Figure 2. Defoliant Dispenser (right side)

LEADING PARTICULARS

Length
Width
Height (without casters)
Weight
Empty
Full
Capacity
Normal operating pressure
Normal dispensing interval
Emergency dump duration
Electrical system
Dump valve operation
Refill time (approx)
Dump valve
Spray valve
Suction valve

16 feet, 4 inches
4 feet, 10 inches
6 feet, 5 inches
1420 pounds
12,420 pounds
1000 gallons
60 + 5 psi
3 to 4 minutes
Less than 45 seconds
28 volts dc (supplied by host aircraft)
Electrical or manual
20 minutes
Electrical, 10 inch
Electrical, 3 inch
Manual, 3 inch

20

�TANK AND CRADLE ASSEMBLY

The tank and cradle assembly is the major unit of the entire system, having a
1000-gallon tank with baffles, manhole, tube connections, and stabilizing and tiedown brackets; an engine and pump assembly which consists of a four cylinder,
horizontally opposed air-cooled, engine and pump directly coupled to the engine

,H

Figure 3. Centrifugal Pump

crankshaft; and a cradle which carries the tank, the engine and pump assembly, and is
provided with four casters which are readily detachable. A temperature indicator and
a liquid lever gage are installed in the tank. The engine is slightly modified from its
original configuration to achieve adaptability to the requirements of the dispenser
system. The detachable casters are to provide limited mobility and are removed
when the unit is tied down.
The defoliant used in the dispenser is stored in the tank and is fed through a
suction line to the pump. The pump is driven by an air-cooled engine and forces
the defoliant through a discharge line to a spray valve. A recirculation line is

21

�provided so that when the spray valve is closed, the defoliant will recirculate
back through the tank. When the spray valve is open, the defoliant is forced
into the spray boom and atomized by spray nozzles. When the tank is empty,
a float-operated switch, located in the tank, automatically stops the engines.
The centrifugal pump consists essentially of an impeller and a pump body,
and is driven by the engine through a direct drive. The engine drives the pump
and the speed of the engine controls the quantity of defoliant being dispensed.
(See figure 3.)
The recirculation line incorporates a jet-pump (ejector) tank refilling system which utilizes the fluid left in the tank from prior operation to initially
operate the jet pump.
CONTROL CONSOLE

The control console is the nerve center of the defoliation system. All
functions are controlled from this position; all monitoring equipment is located
in this position; and the electrical supply is channeled and protected at this
position. Prefabricated electrical cables tic the control console to all related
REFILL

FLUID

POWER

FLOAT SWITCH
OVERRIDE
FWD UNIT
AFT UNIT

STARTER
AND
SPRAY
CHOKE THROTTLES INDICATORS V A L V E

TANK EMPTY
FWD UNIT
AFT UNIT

ENGINES
FWD UNIT
OIL PRESSURE
LOW
OPERATE

AFT UNIT
OIL PRESSURE
LOW
OPERATE

MAGNETO

SPRAY VALVE

©

THROTTLES

OPEN
INCREASE

t
PILOT
POSITION

FWD
UNIT

(o)

(o)

AFT
UNIT

DECREASE

Figure 4, Control Console

22

�parts of the system, including the controls on the pilot's instrument panel and
the aircraft electrical supply system. Tandem or single installations arc
controlled and monitored from the control console without any changes or
alterations being performed. In the event of electrical power failure of the
aircraft electrical system, certain critical functions have an option of
manual operation. (See figure 4.)
DUMP VALVE

The dump valve is a 10 inch gate valve having both electrical or manual
activation. It is designed for horizontal (vertical flow) installation and liquid
flow in only one direction. The bottom of the defoliant tank incorporates a
vortex interrupter and adapter to which the dump valve is secured and is in
perfect alignment with an opening and spring loaded door in the belly of the
aircraft. A high speed motor coupled to an actuator provides 2 second operation of the dump valve in either direction and circuit manipulation to indicate
open condition. (See figure 5.)

Figure 5. Dump Valve

23

�SPRAY BOOM

The prime function of the spray boom is to discharge the defoliant under
pressure at such a location and at such an angle that air flow, in the proximity
of the discharge (spray) nozzle, contributes to the proper density of spray, the
consistency of the defoliant blanket; and the lateral dimension of the effective
strip. Two spray booms are available when the C-123 model aircraft is used
and each boom satisfies a specific set of requirements.

TIE-DOWNS

TAIL BOOM

INSTALLATION
STRUTS

Figure 6. Tail Spray Boom and Associated Plumbing

24

�LEFT HAND SIDE
OF FUSELAGE
AT THIS POINT
CENTER WING
PIPING

EXTERNAL BOOM

I
3
&gt;Q
CO

•o

CD

o
o

NOZZLE
FAIRING
SPRAY NOZZLES
INBOARD OF
NACELLE
NOZZLES OUTBOARD
OF NACELLE

&lt;L
FUSELAGE

�The tail spray boom (figure 6) is mounted outside the aircraft, approximately
midway of the aft cargo loading door. It is designed for simple and fast
installation and removal and erovldesjjoyerage of a 250 foot strip.
The wing spray boom (figure 7) is installed in the inside of the center wing and
externally underneath the outboard wing. As compared to the tail boom, its instaltion and removal is more complex and is considered a more permanent installation. The wing boom provides coverage of a 300 foot strip and the
effectiveness of the application is more uniform.
Installation and removal of either spray boom does not require special
skills or special tools.

Figure 8. Installation in C-723 (left side)

�AIRCRAFT INSTALLATION

The dispenser installation in C-123 aircraft consists of towing the tank and
cradle assembly (unfilled) into the aircraft and securing it to the aircraft floor
utilizing twenty 10,000-pound hook and chain assemblies and the cargo floor
tie-down fittings (figures 8 and 9). All piping, hose assemblies and electrical
cables are installed which tie the A/A45Y-1 dispenser into the aircraft (as
modified) systems, and the control console is secured to the aircraft floor;
thus, making the aircraft-dispenser combination ready for servicing and operation.

Figure 9- Installation in C-123 (right side)

27

�VIET NAM RANCH HAND OPERATIONS

A sketch of the ground support equipment used by RANCH HAND to refill
the A/A45Y-1 dispensers with agent is shown in figure 10. The refill system
presented here is the system used at Tan Son Nhut Air Base, Viet Nam. It
utilizes four 1000 gallon HOURGLASS tanks. A similar refill system is
used at Da Nang, but utilizes only three HOURGLASS tanks. These tanks
are the predecessor to the A/A45Y-1 and incorporate a 10-horsepower
engine and pump unit by which the agent is transferred into the aircraft.
The agent is delivered in 55-gallon drums, then pumped from three
drums at a time into the refill tanks. This is the slowest part of the
operation. The procedure for filling tanks is as follows:
a. The number 2 tank is filled from 55-gallon drums.
b. The agent in the number 2 tank is pumped into tank number 3.
c. Agent in tank number 3 is then pumped into tank number 4.
d. Tank number 2 is refilled and the agent pumped into tank number 3.
e. Tank number 2 is again refilled from the drums and pumped into
tank number 1.
f. All other tanks now filled, tank number 2 is refilled again.
Upon return from a mission, the aircraft is backed as close as possible
to the refill tanks and the systems are refilled with agent using a
commercial fire hose. After completion of the days work the HOURGLASS tanks are filled and the agent transferred into the aircraft. The
refill tanks are then refilled in preparation for a second mission. Due
to the long time needed to fill from the drums, the RANCH HAND crews
are limited to only one turn around, or a total of two missions.
A big disadvantage of refilling in this manner is the problem of
contamination to the agent. Foreign matter gets into the refill tanks and from
there into aircraft defoliant dispensing system. The rubber inside lining
of fire hoses, presently used, is acted upon by the defoliant and causes large
pieces of rubber to be released into the defoliant stream, thereby reducing the
system effectiveness. See figures 11 thru 14 for potographic on-site refill
operations.

28

�Figure 70. Existing Defoliant Transfer System Tan Son Nhut Air Base, Viet Nam

29

�Figure 17. Ranch Hand Ytork Areo

Figure 12. Hour Glass Tank and Pump

30

�Figure 13. Hour Glass Tank and Pump (Insulated)

Figure 14. Hour Glass Spider Pump

31

�OPTIMIZED DEFOLIANT HANDLING SYSTEM
GENERAL

A complete optimized defoliant handling system utilizes three engine-pump
combination units to transfer the defoliant from original containers to
A/A45Y-1 units in aircraft readied for an operational defoliation mission. A
storage tank, platform, control consoles, hoses, and nozzles, combined into a
well balanced system, accomplish the entire defoliant handling operation.
Economy of man-hours, reduction of turn-around time and elimination of
wasted defoliant are the prime factors for consideration. (See figures 1 and 2.)
GENERAL LAYOUT DESCRIPTION

A platform, having a height compatible with a flat bed trailer and an area
to accommodate a 10,000 gallon tank and three engine-pump transfer units, is
located in close proximity to truck roadways and aircraft parking ramp. The
platform would have one engine-pump unit on the side adjacent to the truck roadway,
a 10,000 gallon tank in the center and two engine-pump units on the side
nearest the aircraft parking ramp. Hoses, nozzles, and manifolds are used
to tie all major components into a well balanced and efficient system.
SPECIFIC

The actual arrangement of the defoliant handling system is contingent on
the complexion and layout of the particular air base; however, certain
specifics must be met to achieve maximum effectiveness.
PLATFORM

The platform is a locally manufactured structure approximately the same height
as a flat bed trailer and having lateral dimensions as necessary to accommodate the shape and size of the 10, 000-gallon tank plus the related units.
A support for a suction hose and manifold is located on the truck side of
the platform and is designed so that the suction manifold is supported at
approximately the centerline of the flat bed trailer. The platform deck
has 1/4-inch cracks between decking members to dissipate any defoliant
spillage.
ENGINE AND PUMP UNIT

The engine and pump unit is identical to that incorporated in the
A/A45Y-1 dispenser and is specifically engineered for effective transfer

32

�Figure 15.

Loyo«f

�FOi

LIME

LIME

55 GAL

FOR

f If

16. Defoliant

34

�of defoliant under sustained operation. The engine is a government
standard, air-cooled, four cylinder, four stroke cycle, horizontally
opposed model modified for remote control when mated with the control
console. The engine is available in large quantities, economical to operate, proven in performance, and easily maintained due to maximum accessibility. It is designed to operate a minimum of 1500 hours at rated load
and speed between major overhauls. Its extensive use in defoliation
operations tends to standardize maintenance and provide a spare parts
source through controlled cannibalization.
The pump has been modified by the manufacturer so that it attaches
to the engine at the blower section and the drive end of the crankshaft
thus giving the engine and pump a one to one ratio. Shock mounting is
provided to the engine-pump unit.
CONTROL CONSOLE

The control console is located at the end of the storage to permit
visual monitoring of any engine-pump unit on the platform. All transfer
functions are controlled by a single operator at the control console position.
In addition to control functions, there are certain monitoring gages and
instruments installed in the instrument panel of the control console. The
electrical network is considered semi-permanently installed and so
arranged that simple maintenance is quickly accomplished.
TANK

The tank has a 10, 000-gallon capacity, protected sight gage, manhole, vent,
drain line connection, and facilities for securing to the platform. The sight gage
is a vertically mounted glass tube with connections to tank at each end, protectors
to reduce the probability of breaking, and calibrations to indicate tank contents.
MISCELLANEOUS

Suction Hose. Suction hoses are provided having an inside diameter
which will not be too restrictive to defoliant flow and having a wall structure
to prevent collapse of hose. Hoses which are frequently disconnected have
quick-disconnects to prevent rapid deterioration at connecting points.
Pressure Hoses. Pressure hoses are capable of pressures up to 100 psig
and have adapters in cases where control nozzles are attached. Hose material
is selected to withstand the chemical action of the defoliant.
35

�SYSTEM TIE-IN

The storage tank is located in the approximate center of the platform with
one engine-pump unit on the truck side of the platform and two engine-pump
units on the aircraft side of the platform. The single engine-pump unit has
a 3-inch suction hose connected between the pump and the suction manifold.
The suction manifold has three 1-1/4 inch suction hoses attached which are
suspended from the suction manifold in such a manner as to hang directly
over three 55-gallon drums on the flat bed trailer. A control console is
secured to the platform deck in the proximity of the end of the storage tank
and is electrically connected to the engine-pump unit.
Two engine-pump units and their companion control console are located
on the aircraft side of the platform and are shock mounted to the platform
deck. The suction ports of the two engine-pump units are manifolded so
that a single line attaches to the bottom of the storage tank. The discharge
(pressure) ports of the two engine-pump units are also manifolded and
after the pressure manifold, a single line conveys the defoliant to the aircraft having A/A45Y-1 dispensers to be serviced. Check valves are installed
in pump discharge lines to permit operation of a single engine-pump unit when
demands are less than maximum. At each aircraft position, a smaller
pressure line with a shutoff nozzle is connected into the main line hose.
These two engine-pump units are controlled concurrently from a single
control console.
An electrical network is provided which gives electrical tie-in of all
related electrically functioning units. Cable insulation is chemically unaffected by defoliant in the environs of the defoliant handling system.
CAPABILITIES

Transfer 10, 000 gallons from drums
to storage tank (less truck move time)
Service two A/A45Y-1 dispensers
(in aircraft)
Service four A/A45Y-1 dispensers
(in aircraft)
Remotely controlled functions:
1. Drums to storage tank
shutoff valves
2. Storage tank to aircraft
main lines (2) shutoff
valves

25 minutes
5 minutes
5 minutes

3. Engine throttle
^ Engine starter
Engine &amp;
ignition
6

36

�PORTABLE DEFOLIANT HANDLING UNIT

The portable defoliant handling unit idea is conceived for military installations
where limited servicing of A/A45Y-1 dispensers might be required. The trailer
is capable of traveling at faster speeds and for greater distances than the A/
A/A45Y-1 dispenser and, being a powered unit, it speeds up the servicing of
the dispensers installed in aircraft. Overall dimensions are kept within limits
which will permit air transportation of loaded units to isolated landing fields or
airstrips.
Technical data and capabilities are contained in figure 17.

37

�DESCRIPTION
HAOt FtOM- HAYfS /wr&lt;S*«*t tefOLIATIOM
StSfitNSeX.
_ fOR
MlttTHAY UHfgLS j TMfS »gf VSfO. It » 8 to PI.Y FIK1 tttiiS
VtttHT 1,O6O «.»$,
IS,OOO ISS. t,t»6O
Og

vtrtt nspioTt .ceNrtot. sr/ineM POM tHttee WUCMFT
8V OCCSATOS IHStif

ffltCSfifr

n» PltfYtNT

SOftP&amp;lfT.
Ktt*S.Ufl6HTS,fST.
UHftii

tiffin

SPIillM®, ttOSf 3 JW, DIA. X 10 f f LON6

Hosts uirnoutcx coMwecroMS taun£D IN rusrs. fsott svi^fNsioN.

s@i/st,e

VflLVt
xCO&lt;/PLM6
LU.H1 TMl f STOP

suirctf
THtOTTiE

Figure 17, Tank Trailer

F l t l f R FOSL
SA4E FUEL

Litjoid Refill

38

�66
IWIEPft/lTIOVXl CORPORATION

SMTWTFS

SMTWTFS

SMTWTFS

SMTWTFS

JAN

FEB

MAR

APR

2
9
16
23
30

3
10
17
24
31

4
11
18
25

5
12
19
26

o
6
13
20
27

7
14
21
28

8
15
22
29

1
6 7 8
13 14 15
20 21 22
27 28

MAY

1

2
8 9
15 16
22 23
29

e

3
10
17
24
31

4
11
18
25

O

3
10
17
24

4
11
18
25

5
12
19
26

6
13
20
27

7
14
21
28

1
8
15
22
29

JUN

5
12
19
26

6
13
20
27

7
14
21
28

5
12
19
26

6
13
20
27

7
14
21
28

SEP

4
6 7
11 12 13 14
18 19 20 21
25 26 27 28

2
9
16
23

1
8
15
22
29

2 3
9 10
16 17
23 24
30 —

2
9
16
23
30

3
10
17
24
31

4
11
18
25

5
12
19
26

3
10
17
24
31

4
11
18
25

5
12
19
26

4
11
18
25

5
12
19
26

2
9
16
23
30

3
10
17
24

4
11
18
25

O

3
5
11 12
10
17 18 19
24 25 26
31

6
13
20
27

6
13
20
27

7
14
21
28

6
13
20
27

7
14
21
28

1
8
15
22
29

7
14
21
28

4
11
18
25

5
12
19
26

6
13
20
27

3

AUG

7
14
21
28

1
8
15
22
29

2
9
16
23
30

7
14
21
28

1
8
15
22
29

NOV

1
8
15
22
29

6
13
20
27

1 .._
2
8
15 16
22 23
29 30

1 2

"~3
10
17
24

JUl

OCT

1
8
15
22
29

2
9
16
23
30

2 3 4
9 10 11
16 17 18
23 ® O
30

2
9
16
23
30

-3
10
17
24
31
DEC

5
12
19
26

4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
27 28 29 30 31

©
*

NOTES

39

�NOTES

40

�I

I

I

t

METROPOLITAN

SCALE ONE INCH F.QUftiS APPROXIMATED 2 = MILES

Controlled Access Highways
'fi'.-s-:e c-o ?. ' w-'v =• !--ec-c'ges'
Other Dual Thoroughfares
Principal Through Routes
Other Paved Roads
Streets and Connecting Roads
Mileage Distances between red dots
Highway £gj) ,nterstate
Numbers. \~S

@ U.S
^""^

@State

[77] Counts

I

�MISCELLANEOUS INFORMATION

AIR LINES

Air France
Alitala Air Lines
BOAC &amp; BOAC Cunard
Delta Air Lines
Eastern Air Lines
Southern Airways
Trans World Air Lines
United Air Lines
Hotels:
Pick-Bankhead 2300 5th Ave. North
Dinkler-Tutwiler 2005 5th Ave. North
Essex House Hotel 605 North 21st
Redmont Hotel 2101 5th Ave. North
Thomas Jefferson Hotel 1631 2nd Ave North

PHONE
251-7076
324-1291
323-7259
592-9601
323-7711
595-3737
WX-9000
592-9611

251-3231
252-8161
322-1771
251-0171
252-7141

(apartments)
(apartments)

Motels and Motor Inns:
Anchor Motel 4121 3rd Ave South
Birmingham Airport Motel Municipal Airport
Downtowner Motor Inn 2224 5th Ave North
Guest House Motor Inn 951 South 18th
Holiday Inn (downtown) 1313 3rd Ave. North
Holiday Inn (Irondale) 7941 Crestwood Blvd.
Parliament House Motor Hotel 420 South 20th
Roebuck Motels 9229 4th Ave. South
Sheraton Motor Inn 2040 Highland Ave. South
Town House Motor Hotel 2008 8th Ave South

595-6157
592-0061
324-0601
324-8653
323-8931
592-0311
323-7211
833-9152
323-4413
251-9235

Physicians And Surgeons Exchange

871-4611

TAXI CABS
Yellow Cab Co.
Two Way Cab Co.
Checker Cab Co.
Stricklin Taxi Cab Co.

252-1131
592-7421
323-7741
841-3239

42

�DEPAR"MEHT OF THE 1 AIR FORCE
HtADQUARTERS V.ARNER ROBINS AiR MATERIAL AREA (AFLC)
ROLJINi AiR FORCE BASti, GEORGIA 31093

A V , N o r ° w i i N Q O (Mr. Ginith/^Olj1?)

T0:

1? Oct 1?66

l,o/U sties Support Conference, A/Ai^Y-l Dispeaser, Defoliant, C-123
A i r c r a f t (WIAMA(WRNQO) Ltr, 19 Sep 1966 and WRAMA Msg (U) WRNQ-3256?,
/O Sop 1966)
r
rAC (DOFT-S/Maj Marshall)
Langley Al^B Va 23365

Request action Item Number 9-66-2 "TCTO for Installation of A/Al6'Y-l
System in UC-123B Aircraft, Class V Mod 1776" be removed from
referenced conference minutes and replaced with attached revised
Item Number 9-66-2 "Installation of A/Ali$Y~l System in C-123B
Aircraft" .
K)H THE COMMANDEJi-y

ROBERT N. SCHEIDECKER
Major, USAP1
Chief, Operations Branch
Directorate, Materiel Management

1 Atch
Subj Minutes Item Number 9-66-2

)DOF1

�Horn Number 9-66-2 - Inatf^Ut^
a . Problem Presented;
Difficulty was reported by AFATL personnel in obtaining appropriate
documentation from C-123 Aircraft SSM for procurement of data on Eglin APB
Contract AF 08(635)-l489ii dated 20 Oct 1965. Also, problems were reported in
obtaining -1 Flight Manuals and Maintenance Handbooks by Ranch Hand Personnel.
b.

Progress to Date:

1. Since the A/Alt5l-l System was being procured on an R &amp; D
Contract and had not been approved by CSAF/AFLC for installation in the C123
Aircraft, no action could be taken by the SSM to provide for procurement of
TCTO data.
2. Flight and operational information for those C-123 Aircraft
having A/Al^Y-l System installed is provided in T. 0. 1C-123(B)-1 dated
15 July 1965 and 1C-123B(1)-15-1 dated 23 Apr 1966. WRAMA is now conducting a complete review of the -1 Manual and at completion any change needed will
be made. MR. ll;78-3 dated 21 Jun 1966 approved procurement of necessary
installation TCTO 1C-123-590, Engineering Data and Handbooks changes for the
approved Class V Mod 1??6. Procurement action is now being negotiated with
Fairchild-Hiller for this data. Pending delivery of this data, the schematics
and sketches as shown in the operational manual may be utilized to perform
minimum maintenance.
c. Action to be Taken an_d Action Agency;
1. Ranch Hand Personnel take action through appropriate distribution channels to obtain available Dash One Handbook data for A/Ali5Y-l System
installed in C-123 Aircraft.
?. SSM make follow-up action to assure procurement of additional
required data in a timely manner.
3.
d.

SSM expedite - 1 Flight Manual Review.

Forecast fo_r_ Completion:

Target date for delivery of additional data including published
-1 Flight Manual is Feb 1967.

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4848">
              <text>002</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4849">
              <text>0020</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4852">
              <text>Series I</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4850">
                <text>1905-05-19</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4851">
                <text>Minutes A/A45Y-1 Internal Defoliant Dispenser System Support Conference, 25 and 26 August 1966</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4853">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="4854">
                <text>Ranch Hand aircraft</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1238" public="1" featured="0">
    <fileContainer>
      <file fileId="1122">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/1c371b863916809cb625476bd6ed4682.pdf</src>
        <authentication>33ad85cdca7b643ae6a0411c790b26a2</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63071">
                    <text>Item ID Number:

oooes

Author

Scheidecker, Robert N.

Corporate Author

u.s. Air Force

RBDOrt/ArtlOlO TltlO

Minij es:

t A/A45Y-1 Internal Defoliant Dispenser System Support Conference, 25 and
26 August 1966

Journal/Book Title
Year

1 66

Month/Day

Au ust

Color

w

Number of Images

45

DeSCPlptOn Notes

Pa9es 32-34 missing

9

a

Friday, December 01, 2000

Page 65 of 91

�, 1966

*

Minutes A/A45y-l internal defoliant dispenser
system: Support Conference

f

/

A/A45Y-1 INTERMAL DEFOLIANT

'25 AND 26 AUGUST 1966

�D E P A R T M E N T OF THP MR F O R C E
HLADOUAR"CRS EARNER ROBINS Aift MATERIEL AREA fAFLO
ROtlINi AIR FORCE BASE, GEORGIA 31093

•••'• iN "'•!" Wii'NQO (Mr.

1? Oct 1966

- .-JK i. I,or, I sties Support Conference, A/Al^Y-l Dispenser, Defoliant, C-123
A L r c r a f t (WHAMA(WRNQO) Ltr, 19 Sep 1966 and WRAMA Msg (U) WRNQ/O Sep 1966)
ro:

TAG (DOFT-S/Maj Marshall)
Langley AFB Va 23365

Request action Item Number 9-66-2 "TCTO for Installation of A/AloY-1
System in UC-123B Aircraft, Class V Mod 1776" be removed from
re-ferenced conference minutes and replaced with attached revised
Item Number 9-66-2 "Installation of A/Aii5Y-l System in C-123B
Aircraft".
FOR THE COMMANDER,,

ROBERT N. SCHEIDECKER
Major, USAF

Chief, Operations Branch
.
Directorate, Materiel Management

1 Atch
Subj Minutes Item Number 9-66-2

�Item Number 9-66-2 - .Installation of A/AJj$Y-3^ System in C-123B Aircraft:
a.

proM.em Presented:

Difficulty was reported by AFATL personnel in obtaining appropriate
documentation from C-123 Aircraft SSM for procurement of data on Eglin AFB
Contract AF 08(635)-l489li dated 20 Oct 1965. Also, problems were reported in
obtaining -1 Flight Manuals and Maintenance Handbooks by Ranch Hand Personnel.
b.

Progress to Date;

1. Since the A/Al^Y-l System was being procured on an R &amp; D
Contract and had not been approved by CSAF/AFLC for installation in the C123
Aircraft, no action could be taken by the SSM to provide for procurement of
TCTO data.
2,, Flight and operational information for those C-123 Aircraft
having A/Al^Y-l System installed is provided in T. 0. 1C-123(B)-1 dated
1$ July 1?65 and 1C-123B(1)-15-1 dated 23 Apr 1966. VRAMA is now conducting a complete review of the -1 Manual and at completion any change needed will
be made. MR 1^78-3 dated 21. Jun 1966 approved procurement of necessary
installation TCTO 1C-123-590, Engineering Data and Handbooks changes for the
approved Class V Mod 1??6. Procurement action is now being negotiated with
F'airchild-Killer for this data. Pending delivery of this data, the schematics
and sketches as shown in the operational manual may be utilized to perform
minimum maintenance.
c. Action to be Taken and Action Agency :
!„ Ranch Hand Personnel take action through appropriate distribution channels to obtain available Dash One Handbook data for A/AliSl-l System
installed in C-123 Aircraft.
i

?„ SSM make follow-up action to assure procurement of additional
required data in a timely manner.

d.

3. SSM expedite - 1 Flight Manual Review.
i
Forecast for Completion;

Target date for delivery of additional data including published
-1 Flight Manual is Feb 196?.

�INDEX

Item Number

Title

Page Number

Summary

1

Section I

Introduction/Ranchijland^Report

2

Section n

A/A45Y-1 System Status
Technical Manual St atu s

3
4

9-66-7

Action Items
Ground Support Equipment
TCTO for Installation of A/A45Y-1 System in
UC-123B"Aircraft, Class V Mod 1776
Retrofit Installation of MARK m Engine
Spares
Retrofit Installation of Optimized (Redesigned^
Wing Boom on UC-123B Aircraft
Maintenance Data and Technical Order
Verification
M aintenance T raining of Ranch Hand Personnel

13

Section IV

General Comments/Observations

14

Section V

A/A45Y-1 Defoliation Conference Attendees

16

Section VI

Distribution

17

Section

A/A45Y-1 Internal DefolIant Dispenser System
System Description
Capabilities and Limitations
Leading Particulars
Tank and Cradle Assembly

18

Section III
9-66-1
9-66-2
9-66-3
9-66-4
9-66-5
9-66-6

Control Console
Dump Valve
Spray Boom
Aircraft Installation
Viet Nam Ranch Hand Operations
Optimized Defoliant Handling System
Portable Defoliant Handling Unit

5
5
7

8
10
11
12

18
18
20
21
22
23
24
27
28
32
37

�Figure Number

Title

Page Number

Illustrations
Figure 1
Figure 4
Figure 5
Figure 6
Figure 7
Figure 10
Figure 15
Figure 16
Figure 17

Major Components of Defoliant Dispenser
Control Console
Dump Valve
Tail Spray Boom and Associated Plumbing
Wing Spray Boom
Existing Defoliant Transfer System Tan Son Nhut
Air Base, Viet Nam
Optimized Defoliant Handling System Layout
Defoliant Handling System Components
Tank Trailer Defoliation Liquid Refill

19
22
23
24
25
29
33
34
38

Photographs
Figure 2
Figure 3
Figure 8
Figure 9
Figure 11
Figure 12
Figure 13
Figure 14

Defoliant Dispenser (right side)
Centrifugal Pump
Installation in C-123 (left side)
Installation in C-123 (right side)
Ranch Hand Work Area
Hour Glass Tank and Pump
Hour Glass Tank and Pump (insulated)
Hour Glass Spider Pump

20
21
26
27
30
30
31
31

�SUMMARY
1. The first Logistics Support Meeting for the A/AkSY-l Defoliant Dispenser
was held at Hayes International Corp, Birmingham, Ala., on 2li and 25 Aug 1966.
2. The purpose of this meeting was to review program status, evaluate
"l-'ajor Problem Areas", and initiate and assign action as required to assure
the timely and successful completion of program requirements for enhancement
of logistic support.
3. Areas within this program requiring action, further refinement and overall close surveillance are documented in section III and IV of these minutes.
h. A follow-up meeting was determined essential in order to review progress
made on action items, reassess support posture, and include representatives
of agencies absent from this meeting.
5. The minutes of this meeting will be used as a basis of agenda for the
next meeting. Each action agency should complete their assigned action
in accordance with the scheduled dates, if possible, and be prepared to
present status of action taken at the next scheduled meeting. Additional
items may be added to the agenda for review and discussion at this time.
However, to assure adequate time for evaluation and staffing, it is
necessary that proposed agenda items be submitted to WRAMA (WRNQO) at least
one week before the scheduled meeting date.
•
6. The next meeting is tentatively scheduled at Hayes International Corp.,
Birmingham, Ala., 11-1.3 Oct 1966. Confirmation of date and location will
be provided by separate correspondence.
7. It is desired to take this opportunity to compliment each representative
for his active participation and support. Especially appreciated are the
efforts of Hayes International in hosting this meeting and the fine
assistance rendered. The productive results obtained and anticipated as
a result of this meeting will be beneficial to all agencies concerned, and
should improve SE.A-s.upport and operational capability.

ROBERT N'. SCHEIDECKEY'"' ""*"
Major, USAF
Chief, Operations 'Branch
Directorate, Materiel Management

�SECTION I
INTRODUCTION/RANCH HAND REPORT
1. Mr. W. B. O'Neal welcomed the conferees and opened the meeting.
Introduction was given by Lt William Crea, Air Force Project Engineer.
Status of the program was reviewed by Mr. Don Smallwood, Hayes Project
Engineer (Reference Section II).
2. Captain Peshkin gave the report from Ranch Hand. They are growing
very rapidly and a considerable number of problems have developed. As
early as January or February, it was realized that additional aircraft
were going to be programmed for SEA. Storage, maintenance, and training requirements were anticipated; however, no staff support was furnished after discussions with operations and maintenance personnel at Tan
Son NHut. Finally, the aircraft began to arrive. Storage problems still
exist as does spare parts support. Flying continues at approximately
25 sorties per aircraft per month. This is the MACV planning figure
for programming chemicals. Ranch Hand would like to be able to operate
from an additional operating location in the II Corps area to increase
sortie effectiveness. There are presently 9 aircraft in the country 3 at Da Nang and 6 at Tan Son NHut. The operation continues successful
because the equipment is basically good and the air frame is the best
available. The defoliant system has the same characteristics, simplicity,
and reliability. The main problems are as indicated below. Ranch Hand
has been fortunate in their maintenance support resulting in almost 100$ aircraft availability. Many of Ranch Hand's problems could be
helped by better staff support.

�SECTION II
A/A45Y-1 SYSTEM STATUS

ITEM

CONTRACT

1. A/A45Y-1
Prototype

08(635)3609

2. A/A45Y-1
Production

08(635)3609

3. Dump Valve
Kit

08(635)4894

4. Wing Boom
Prototype

08(635)5710

5. Wing Boom
Production

08(635)5710

6. Engine Mod
Mark IH

08(635)4894

QUANTITY

DELIVERY
DATE

REMARKS

Sept. 1963

Used in C-130 Test
at Eglin
Systems started at
Hayes

20

Aug. 1964

Six Operational Systems
in Viet Nam. One
destroyed in C-123 crash
in Viet Nam. Seven
delivered to FairchildHiller Corp. for installation in C-123. One
awaiting dump valve and
will be shipped to Fairchild-Hiller. One remaining at Hayes for
Wing Boom Test. One
unassigned. Three
cannibalized for spare
parts by Eglin.

17

Aug. 1965

All operational
A/A45Y-1 systems
equipped with dump
valve.

Sept. 1966

Fabrication complete
by 23 Aug. 1966.

20

March 1967
(Anticipated)

Delivery to be 150 days
after approval of
Prototype.

15

Jan. 1967
(Anticipated)

Twelve to be installed
on new purchase of
twelve A/A45Y-1 by
WRAMA and the remaining three for
spares.

�TECHNICAL MANUAL STATUS

ITEM

STATUS

REMARKS

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

Awaiting validation of
System Manual.

In process review performed at
Hayes by WRAMA, 20 and 21
July 1966

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

In process.

Manual change to add Mark HI
engine pump controls

T. C. T. O.
(Proposed)

No contractural
requirements. Never
was negotiated as per
supplemental agreement number 2.

Contractor recommends preparation of T. C. T. O. for installation of system in C-123 aircraft

T. O. 11C15-3-4-2
FIELD, DEPOT OVERHAUL WITH IPB INTERNAL DEFOLIANT
DISPENSER MODEL
A/A45Y-1

In process.

Change to cover wing boom
program

T. C. T. O.

In process.

To cover installation of wing boom
A/A45Y-1 on C-123 for aircraft
T. O. 's
To cover installation of Mark HI
engine controls in field to retrofit
existing systems

T. C. T. O.

Awaiting receipt of 118A
and contract coverage

�SECTION III
ACTION ITEMS
Item Number 9-66-1 - Ground Support Equipment;
a.

Problem Presented;

(1) There are four 1,000 gallon Transfer Tanks (Hour Glass) and one
2,^00 gallon Fuel Servicing Unit, Type F-7 currently located at Tan Son NHut
with a 5,000 gallon R-2 Storage Tank in the process of installation. There
are also three 1,000 gallon Transfer Tanks (Hour Glass) located at Da Nang.
The unsystemized arrangement and limited capacity of this equipment does
not give sufficient capability to; (1) Fill aircraft that are located at
Tan Son NHut, (2) Turn-around aircraft as rapidly as necessary, and (3)
Operate with the three different type chemical agents now being used. The
present system is characterized by the following; (a) Insufficient tank
storage capacity, (b) Insufficient transfer capacity which limits turnaround time, (c) Inability to systematically select proper chemical
appropriate to target requirements, (d) Inability to evacuate unused
agent from tanks in aircraft.
(2) The present system is progressively deteriorating due to
use of 1952 vintage Hour Glass transfer equipment. This system cannot
be supported and therefore will be eliminated from inventory at failure
or when sooner replaced. Glaring deficiencies of this system are as noted;
(a) Non-standard system, (b) Limited or no spare parts available, (c)
Fire hose used to connect transfer tanks deteriorates in from h to 10 days,
( d ) Contamination of flow system (mainly due to rubber particles from fire
hose lining plus sand and other foreign particles introduced by siphoning
probes) because of lack of well thought out systems approach, (e) Inadequate
pumping capability (Spider pump used for siphoning agent from 55 gallon drums
is old and weak).
k-

Progress to JDate;

(1) An R-2 Storage Tank (5,000 gallon), salvaged from an R-2
Servicing Unit, is to be ins tolled by Ranch Hand to provide additional
transfer and storage capability and is awaiting plumbing installation by
Base Civil Engineer. (Compatibility of this tank with existing chemical
agents is doubtful).
(2) One F-7 Servicing Unit is now in use with five more on order.
(So far this equipment is functionally satisfactory, but will need teflon
hosing and seals for compatibility with existing agents).

�(3) Use of ARMY" Bladder Tanks for storage is being investigated by
377 Combat Support Group (Base Fuels), Tan Son NHut. (Question of agent
compatibility still remains).
(l») The A/A15Y-1 System has a self-filling capability, but was
found to be too slow and therefore incompatible with quick turn-around
re quirement.
(5) Use of B-l and B-1A Nitric Acid Servicing Units (2,000
gallon capacity) were proposed by Hayes as they were believed to be in
excess storage. Investigation by WRAMA Vehicle Manager revealed these
units to be unsatisfactory for their designed purpose and were dismantled
and removed from inventory.
c. Action to be Taken and Action Agency;
(1) Provide adequate bulk storage and pumping facilities for
three different chemical agents at two, possibly three different bases.
A requirement exists for the simultaneous filling of as many as nine
aircraft at Tan Son NHut and three at Da Nang with a possible total of
five at Da Nang and three at another operating location (does not include
Lucky Tiger). Action agency to be determined.
(2) Provide additional F-7 Servicing Units to Ranch Hand WRAMA (WRNR).
(3) Provide teflon hoses and gaskets for F-7 Servicing Units WRAMA (WRNR).
d

• Forecast for Completion:
(1) Fixed facility - to be determined.
(2) Additional F-7 Servicing Units - accomplished.
(3) Teflon hoses and gaskets - to be determined.

�Item Number 9-66-2 - TCTO for Installation of A/AiuY-1 System in UC-123B
Aircraft, Class V Mod 1776;
a.

Problem Presented;

Eglin AFB Contract AF 08(635)-lj89ij, dated 20 Oct 1965, provided
a line item for data in accordance with DD Form 11423 covering preparation
of TCTO for installation of A/AJj5Y-l System in UC-123B Aircraft (AFPI 71531-(l8). Repeated attempts by Contractor, AFATL, and A/Ah5Y-l IM have
been unsuccessful in obtaining from C-123 SSM appropriate documentation
(AFLC Form 118A) identifying type of TCTO and aircraft handbook revisions
desired. Ranch Hand representatives advised that considerable difficulty
is being experienced by Flight cre*s and Aircraft Maintenance personnel
due to lack of appropriate --1 Flight Manual Supplement and Aircraft
Maintenance Handbook data reflecting this systems installation. This
creates an obvious problem with operation and maintenance as well as a
serious problem with indoctrination of new crews due to high percentage
and frequency of personnel rotation.
k*

Progress to Date;
None

Ct

Action to be Taken and Action Agency;

(1) WRNB initiate documentation for preparation of TCTO
covering installation of basic A/Alj5Y-l system using Hayes tail boom
and de-modification of aircraft (removal of tank and cradle assy) back
to cargo configuration.
(2) WRNB initiate documentation for preparation of TCTO
covering installation of Ranch Hand wing and tail boom and marriage with
basic Hayes A/Alt^Y-l System.
(3) WRNB establish requirement for preparation of Aircraft
Maintenance handbooks concurrent with requirement for respective TCTO's.
WRNB initiate immediate action to provide Ranch Hand with
required supplement to T. 0. 1C-123-1 Flight Manual reflecting Defoliant
Spray configuration.
d.

Forecast for Completion;

Delinquent - In view of non-participation in this meeting by
C-123 SSM personnel, a report of intended action and progress made is
required at next meeting tentatively planned for 11-13 Oct 1966.

�Item Number 9-66-3 - Retrofit Installation of MARK III Engine;

a.

Problem Presented;

AFATL (ATCB) has provided for complete modification kits to
retrofit present operational Ranch Hand Dispensers, utilizing MARK I
and MARK II engines, to latest ARMY standardized MARK III engine
configuration. The A/Aij^Y-l system has not been made full standard
by AFSC; therefore, responsibility rests with AFSC to provide retrofit
kits and required TCTO for Field installation.
b.

Progres s to da te ;

Required number of kits have been placed on Contract AF 08(635) -l489h with Hayes International.
c.

Action to be Taken and Action Agency:

(1) AFATL (ATCB) submit request to WRAMA (WRNSTH) for AFPI 18
covering this modification and appropriate handbook revisions.
(2)

WRNSTR provide AFPI 18 as required.

(3)

Contractual provisions by AFATL for TCTO and handbook

revisions.
d . Forecast for Completion :

(1) 25 Sep 66.
(2) Provide AFPI to AFATL within five days after' receipt.
(3) To be determined - contingent on authority for reprogramming funds within project 2$23&gt; and subsequent initiation of
Purchase Request.

�(2) Reference a ( 2 ) above. WRAMA (WRNQ) will review this problen
with appropriate personnel at WRAMA and Eglin AFB to determine specific cause
and remedial action.
(3) Reference a(3) above. WRAMA (WRNQ) will review end item
spares requirements to determine proper course of action necessary to provide adequate spare assemblies to support Field operations where battle
damage or loss might be incurred requiring complete assembly replacement.
Coordination with the using activity will be required.
d.

Forecast for Completion;
(1) Reference c(l) above.
(a) Revision of AFLC Form 2? - 15 Sep 1966.
(b) Spare parts recomputation - lij Oct 1966.

(c) Release of spare parts orders to contractor/vendors to be determined based on method to be employed.
(2) Reference c(2) above. 15 Sep 1966.
(3) Reference c(3) above.

30 Sep 1966.

�Item Number 9-66-Ii - Spares;
a.

Problem presented:

(1) Requirement for M&amp;O spare parts for support of A/Alj5Y-l
System is expected to reach critical proportions in the very near future
due to, (1) increase in number of spray aircraft, (2) late provisioning
action in relation to first operational units, and (3) system contamination by grit and rubber particles resulting from poor system arrangement
and servicing equipment that is incompatible with presently used chemical
agents. Also, WRAMA has received a flood of requistions for spare parts
exceeding initially provisioned quantities, which did not consider system
contamination problem. Lack of spare parts support is a limiting factor
in Ranch Hand operations.
(2) Spare parts orders are not being received by Hayes from
Eglin AFB, procurement agency (APGC), in a timely manner.
(3) No provisions have been made to procure and stock spare
complete assemblies, such as, Tank and Cradle Assembly, Engine and Pump
Assembly, and Control Console Assembly.
b.

Progress to Date;

(1) Reference a(l) above. A quantity of stop-gap spare parts
were procured by AFATL on Contract AF 08(635)-li89k. However, these have
proven inadequate to sustain desired degree of Ranch Hand operation
pending delivery of spare parts as a result of formal provisioning by
WRAMA. Some support has been furnished by Hayes International through
their engineering representative previously stationed with Ranch Hand.
Further, WRAMA and DCASO at Hayes are working together with the contractor
in an attempt to expedite vendor delivery of specific spare parts.
(2) Reference a ( 2 ) above. A previous review of this problem
with Eglin AFB, procurement activity, was supposed to have alleviated
this condition or at least improved flow of documentation from Eglin
to Hayes. Further investigation is in order.
(3)
c

Reference a(3) above.

No progress to date.

• Action to be Taken and Action Agency;

(1) Reference a(l) above. The programming check list (AFLC
Form 2?) will be revised to reflect increase in number of systems and
bases to be supported, and spare parts requirement will be recomputed
for appropriate procurement action,.

10

�Item Number 9-66-5 - Retrofit Installatiqn of Optimized (Redesigned) Wing
Boom on UC-123B Aircraft:
a.

Problem Presented;

No authorization currently exists for installation of the Optimized
Wing Boom on Ranch Hand and Lucky Tiger Aircraft. The wing boom, now ^employed
by aircraft in SEA, is a non--stajid^r^jJ^gm^as^jMPJlQejvts which are^jipX
"cToTSpatibie"witlT~agenJts now in use, and is not logistically supportable.
_ T __±_

^

ii

.. |nr .._ m-,,i ,-!•-• ,

T\ .immi-"'^-"— "•

J*"i"""'-'*'*r'M'^''"T'"~

"'"

'

" " -—'""-•"•-""••*J**J-V*—•*"'
"

-.1 • *^u^-»Mf»iart-.•^J.&lt;fa. ...-»^*••&gt;*••. — •«

*•

b.

Progress to Date^

The Optimized Wing Boom is presently being developed by AFATL
under Contract AF 08(635)5710 with Hayes International.
c. Action to be Taken;
The using command will establish appropriate requirement for
installation of Optimized iVing Boom.
d.

Forecast for Completion:
23 Sep 1966.

11

�Item Number 9-66-6 - Maintenance Data and TechnicalOrder Verification;
a

*

Problem Presented;

Maintenance data has not been provided field activities due to
delayed verification of technical order. This has created considerable
difficulty regarding system maintenance and identification of spare parts
requirements.
kf

Progress to Date;

Hayes has completed technical order draft in MIL Spec format.
Preliminary review of blue line draft has been accomplished by WRAMA at
Hayes. Equipment is currently available at Hayes and ready for verification.
However, it has a MARK I configured engine installed. The MARK III engine
is still pending delivery from vendor's plant where it is being mated to
the pump. It was agreed that the difference between the MARK I and MARK III
engine was not sufficient to warrant further delay in verification of technical order. WRAMA agrees to accomplish verification on existing equipment
with MARK I engine. Final draft is to reflect the MARK III configuration,
which will be verified against engineering drawings.
c. Action to be Taken arid_Action_Agency;
(1) Hayes will take immediate action to establish a date with
WRAMA (WRNSTR) for verification meeting at Hayes. Time of meeting should
be established to allow a minimum of 15 days for proper notification of
participating activities. Ranch Hand representatives agreed there will be no
requirement for participation by their activity in this verification. In
lieu thereof WRAMA will explore the possibility of obtaining using command
assistance from personnel of SAWC at Eglin AFB, who have a current and
specific knowledge of Ranch Hand operation.
(2) Assistance of the Hayes - DCASO Quality Office will be
required in the performance of this certification and will be primary
point of contact relative to WRAKA/Hayes coordination of proposed date
of certification meeting.
d.

Forecast for Completion;
At the earliest possible date.

12

�Item Number 9-66-7 - Maintenance_Training_of Ranch Hand Personnel
a. Problem Presented:
Newly assigned Ranch Hand Maintenance personnel upon arrival have
little or no knowledge as to maintenance of the A/Ali$Y-l dispenser due to
there having no prior training on this system. The resulting problems are
obvious.
b.

Progress to Date;
None

c. Action to be Taken;
(1) Ranch Hand should establish and submit an official requirement in accordance with AF Regulation 50-9 to Air Training Command citing
type and scope of training required. However, due to extreme urgency of
existing requirement, it was requested by Ranch Hand that a contractor
representative (Hayes) be provided in the interim, pending development of
training capability by ATC. If interim contractor support for indoctrination
of Ranch Hand Maintenance personnel is not provided, some other immediate
means of training must be investigated.
(2) Discussion of contractor support indicated the most feasible
and expeditious approach would be use of an existing Eglin AFB contract.
However, this will require approval and funding by Hq USAF.
d.

Forecast for Completion:
(1) Ranch Hand submit .requirement as soon as possible.
(2) Final action on this requirement is yet to be determined.

13

�SECTION IV
GENERAL COMMENTS/OBSERVATIONS
1. Forthcoming flight test of the protype optimized wing boom was
introduced as a discussion item by AFATL representative, Lt. Crea.
Also recognized was the recent diversion of UC-123B aircraft to
Dallas, Texas, pending deployment and voluntary participation and
support of Hayes International for the purpose of spraying insecticide
in encephalitis infected areas. It was noted that this disease is not
restricted to the CONUS as was indicated by an Associated Press report
reflecting loss of 3Qk lives so far this year out of 1616 cases throughout Japan. As a result of the tremendous effectiveness and publicity of
the C-123 spray operation in Dallas, it is envisioned that additional
requirements are forthcoming for use of A/Ali5Y-l equipped aircraft for
insecticide spraying on a world-wide basis, especially in SEA. Lt. Crea
indicated he would communicate with TAG regarding intended use of
insecticides with the defoliant system. If use is contemplated, TAG
will be asked to establish a formal requirement for test of insecticides
concurrent with test of defoliants during flight test of optimized wing
boom at Eglin during September and October 1966.

2. The Ranch Hand mission is not consistent with the mission of the
organization to which they are assigned. This leads to competition for
resources, maintenance, and Staff Support. Proper emphasis or priority
has not been placed on the defoliation mission thereby restricting the
establishment of appropriate facilities for storage and transfer of more
than one type chemical agent at Tan Son NHut and other operating locations.
A definite advantage is envisioned by identification of the defoliation
system as a weapons systems for the delivery and dissemination of chemical
ordnance. Specifically, one advantage of a weapons systems identification
would be to rationalize the storage and loading problem by having the chemicals
handled by personnel who handle other Air Force ordnance. This could possibly
result in taking the aircraft maintenance people out of the ordnance loading
business. This was not introduced as a problem as appropriate agencies were
not in attendance for proper discussion and action assignment. However,
aforementioned weapons systems identification has considerable merit and
should be evaluated by PACAF and Hq USAF to determine specific advantages
to be derived for further discussion during next meeting.
3. A need was expressed by Ranch Hand for a pamphlet depicting defoliation
spraying in SEA covering subjects such as:
a. Chemical type, effect and hazzards.
b.

Type crop and vegatation recognition.

c.

Psyochological effect on populace.

14

�Such a pamphlet would be invaluable for indoctrination of new crews upon
arrival in SEA and would be used to supplement present verbal instructional
methods which are accomplished mostly during normal spray missions. Hayes
International expressed an interest in preparing such a manual as they have
the knowledge and capability. However, discussion was deferred to next
meeting at which time it is hoped that the office of primary responsibility
may be able to offer some constructive advice relative to obtaining this
pamphlet.

15

�SECTION V
A/A45Y-1 DEFOLIATION CONFERENCE ATTENDEES

Maj Robert N. Scheideoker, WRAMA
Capt Richard Peshkin, Ranch Hand
Lt William J. Crea, Jr., ATCB
SMS Charles Lightner, Ranch Hand
Mr. Gene Smith, WRAMA
W.B. O'Neal, Hayes
C.F. Conklin, Hayes
J.L. Harrington, Hayes
John Bonta, Hayes
Don Smallwood, Hayes
J.E. Merk, Hayes
Stan Burkot, Hayes
Ronnie Dear, Hayes
M.J. McMahan, Hayes

16

�SECTION VI
DISTRIBUTION

Activity

Nr of Copies
2
2

MACV
7th AF (DOPE)
(BMP)

Name
J-3 Chemical Branch
Major Haugaton
Lt Col McCellan

(DAFSC/AFSC
Lia O f f )
2

315th ACW (DO)

h

309th ACS (SASF)

377th CSG (DCM)
(D/M)
1
1
3

377th OMS
llith ACW (Coradr)
PACAF (DM) .
(DMM)

1
1

(DMMB)
Hq USAF (AFRDDA)
(AFRDQRA)
(AFSMEAA)
(AFXOP)
(AFSMSDA)
TAG (DOFT-S)
(DOO-S)
(DORQ-FM)
ATC (ATTAT-B)
Dept of Aerospace
Munitions (GS-WC)
AFLC (MCKTA)
(MCMTE)
(MCO)

(MCOQM)
ASD (ASJB)

1
1
1
1
3
3
12

AFSC (SCSMM)
HQ RTD (RTTW)
kkOQth CCTS
SAWC-LC
AFATL (ATCB)
SAAMA (SANM)
(SANNR)
(SAQR)
WRAMA (WRNQO)

Maj Richard Engian
Lt Col Reddrick
Major Kline
Lt Col Ferguson
Major Dresser
Captain Peshkin
S/MSGT C. B. Lightner
Col Harris
Lt Col Carter
Major Sibley
Colonel Bradburn
Colonel Thomas B. Kennedy
Lt Col C. N. Powell
Maj W. A. McKinney
Lt Col Carter
Lt Col May
Mr. Ed Dougherty
Maj Vinson
Maj White
Maj Marshall
Capt Adams
Maj Novikoff
Lt Col Gibson
TSgt Gailes
Mr. Fields
Mr. Whitacre
Mr. Finch
Mr. Clark
Mr. Bro'rfn
Mr. Brothers
Mr. Pfiefer
Mr. Goodwin
Capt John R. Spey
Lt Col Huston
Lt Crea
Mr. Arthur Miller
Mr. Jack Burton
Maj R. N. Scheidecker
17

�SECTION VII
A/A45Y-1 INTERNAL DEFOLIANT DISPENSER SYSTEM

SYSTEM DESCRIPTION

The A/A45Y-1 Internal Defoliant Dispenser, designed and manufactured
by Hayes International Corporation, Birmingham, Alabama, is a complete
airborne defoliant dispensing system. The dispenser is packaged to permit
rapid installation into, and removal from, C-123 aircraft, with only minor
modifications required to the affected aircraft. (See figures 1 and 2.)
The Internal Defoliant Dispenser, Part No. A/A45Y-1, provides for loading,
transporting and dispensing of 1000 gallons of defoliant chemical, and in case
of an emergency, dumping the full load overboard in less than 45 seconds. The
tank and cradle assembly is mounted on detachable casters which are removed
before anchoring in the aircraft. A control console is electrically connected
into an electrical network which in turn is connected to the aircraft electrical
system, certain controls and indicators in the flight compartment and the electrically operated units within the system. Pressure is applied to defoliant
chemical, by an engine and pump assembly mounted on the same frame with the
tank. The defoliant is transported to a nozzle assembly mounted in the slipstream of the aircraft in such a manner that a strip 250 or 300 feet wide along
the line of flight is effectively covered. The nozzle assembly is designed for
the most effective atomizing of the defoliant and coverage of foliage to be
destroyed. The dispensing operation and, in emergency, the dump valve
operation can be controlled from either the control console near the tank and
cradle assembly or from the pilot's position in the flight compartment.
CAPABILITIES AND LIMITATIONS

The internal defoliant dispenser is capable of containing 1000 gallons of
defoliant which can be completely dumped overboard by remote control or
manually in less than 45 seconds. The pump is capable of maintaining 60 + 5
psi pressure during the normal 3- to 4-minute period of operational spraying.
Refilling the tank assembly is accomplished with power and equipment contained
within the defoliation dispensing system.

18

�A / A 4 5 Y - I I N T E R N A L DEFOLIANT DISPENSER

. T A N K VENT

.MANHOLE COVER

DUMP VALVE
(SEE FIGURE 5)
TANK

LIQUID LEVEL

ENGINE EXHAUST

VIBRATION
ISOLATOR SEGMENT

CENTRIFUGAL PUMP
(SEE FIGURES)

TIE-DOWN
FITTINGS

MAIN SPRAY VALVE

RECIRCULATING
LINE
CONTROL CONSOLE
(SEE FIGURE &lt;)

JACKING LUG

TEMPERATURE
INDICATOR
JET PUMP
REFILL
CRADLE

NOTE:
SEE FIGURE « FOR TAIL
BOOM AND FIGURE 7 FOR
WING BOOM. FIGURES 8
AND 9 SHOW A/A45Y-1
INSTALLED IN C-123 AIRCRAFT.

Figure 1. Major Components of Defoliant Dispenser

19

�Figure 2. Defoliant Dispenser (right side)

LEADING PARTICULARS

Length
Width
Height (without casters)
Weight
Empty
Full
Capacity
Normal operating pressure
Normal dispensing interval
Emergency dump duration
Electrical system
Dump valve operation
Refill time (approx)
Dump valve
Spray valve
Suction valve

16 feet, 4 inches
4 feet, 10 inches
6 feet, 5 inches
1420 pounds
12, 420 pounds
1000 gallons
60 ± 5 psi
3 to 4 minutes
Less than 45 seconds
28 volts dc (supplied by host aircraft)
Electrical or manual
20 minutes
Electrical, 10 inch
Electrical, 3 inch
Manual, 3 inch

20

�TANK AND CRADLE ASSEMBLY

The tank and cradle assembly is the major unit of the entire system, having a
1000-gallon tank with baffles, manhole, tube connections, and stabilizing and tiedown brackets; an engine and pump assembly which consists of a four cylinder,
horizontally opposed air-cooled, engine and pump directly coupled to the engine

I^S^SiSfs^SQ

^^^^iiMK^is^^^i:i^XiJ&amp;^
Figure 3. Centrifugal Pump

crankshaft; and a cradle which carries the tank, the engine and pump assembly, and is
provided with four casters which are readily detachable. A temperature indicator and
a liquid lever gage are installed in the tank. The engine is slightly modified from its
original configuration to achieve adaptability to the requirements of the dispenser
system. The detachable casters are to provide limited mobility and are removed
when the unit is tied down.
The defoliant used in the dispenser is stored in the tank and is fed through a
suction line to the pump. The pump is driven by an air-cooled engine and forces
the defoliant through a discharge line to a spray valve. A recirculation line is

21

�provided so that when the spray valve is closed, the defoliant will recirculate
back through the tank. When the spray valve is open, the defoliant is forced
into the spray boom and atomized by spray nozzles. When the tank is empty,
a float-operated switch, located in the tank, automatically stops the engines.
The centrifugal pump consists essentially of an impeller and a pump body,
and is driven by the engine through a direct drive. The engine drives the pump
and the speed of the engine controls the quantity of defoliant being dispensed.
(See figure 3.)
The recirculation line incorporates a jet-pump (ejector) tank refilling system which utilizes the fluid left in the tank from prior operation to initially
operate the jet pump.
CONTROL CONSOLE

The control console is the nerve center of the defoliation system. All
functions are controlled from this position; all monitoring equipment is located
in this position; and the electrical supply is channeled and protected at this
position. Prefabricated electrical cables tie the control console to all related
FLUID

REFILL

POWER

FLOAT SWITCH
OVERRIDE
FWD UHIT
AFT UNIT

STARTER
AND
SPRAY
CHOKE THROTTLES INDICATORS VALVE

ENGINES
FWD UNIT
OIL PRESSURE
LOW
OPERATE

MAGNETO

AFT UNIT
OIL PRESSURE
LOW O P E R A T E

MAGNETO

INCREASE

ol

p

UNIT

DECREASE

Figure 4, Control Console

22

�tfoliant Handling System Loyovf

�parts of the system, including the controls on the pilot's instrument panel and
the aircraft electrical supply system. Tandem or single installations are
controlled and monitored from the control console without any changes or
alterations being performed. In the event of electrical power failure of the
aircraft electrical system, certain critical functions have an option of
manual operation. (See figure 4.)
DUMP VALVE

The dump valve is a 10 inch gate valve having both electrical or manual
activation. It is designed for horizontal (vertical flow) installation and liquid
flow in only one direction. The bottom of the defoliant tank incorporates a
vortex interrupter and adapter to which the dump valve is secured and is in
perfect alignment with an opening and spring loaded door in the belly of the
aircraft. A high speed motor coupled to an actuator provides 2 second operation of the dump valve in either direction and circuit manipulation to indicate
open condition. (See figure 5.)

Figure 5. Dump Valve

23

�SPRAY BOOM

The prime function of the spray boom is to discharge the defoliant under
pressure at such a location and at such an angle that air flow, in the proximity
of the discharge (spray) nozzle, contributes to the proper density of spray, the
consistency of the defoliant blanket; and the lateral dimension of the effective
strip. Two spray booms are available when the C-123 model aircraft is used
and each boom satisfies a specific set of requirements.

INSTALLATION
STRUTS

TIE-DOWNS

TAIL BOOM

INSTALLATION
STRUTS .

Figure 6. Tail Spray Boom and Associated Plumbing

24

�• LEFT HAND SIDE
OF FUSELAGE
AT THIS POINT

FUSELAGE

CENTER WING
PIPING

EXTERNAL BOOM

:.-—J
O

VJ

CO
O
O

HOZZLE
FAIRING
SPRAY NOZZLES
INBOARD OF
NACELLE
NOZZLES OUTBOARD
OF NACELLE

Cn

�The tail spray boom (figure 6) is mounted outside the aircraft, approximately
midway of the aft cargo loading door. It is designed for simple and fast
installation and removal and £rovides coverage of a 250 foot strip.
The wing spray boom (figure 7) is installed in the inside of the center wing and
externally underneath the outboard wing. As compared to the tail boom, its installation and removal is more complex and is considered a more permanent installation. The wing boom provides coverage of a JOO foot strip and the
effectiveness of the application is more uniform.
Installation and removal of either spray boom does not require special
skills or special tools.
U

^^te^;'fe';'"^
£5S£S^ V&amp;K^--v*

Figure 8. Installation in C-123 (left side)

26

�AIRCRAFT INSTALLATION

The dispenser installation in C-123 aircraft consists of towing the tank and
cradle assembly (unfilled) into the aircraft and securing it to the aircraft floor
utilizing twenty 10,000-pound hook and chain assemblies and the cargo floor
tie-down fittings (figures 8 and 9). All piping, hose assemblies and electrical
cables are installed which tie the A/A45Y-1 dispenser into the aircraft (as
modified) systems, and the control console is secured to the aircraft floor;
thus, making the aircraft-dispenser combination ready for servicing and operation.

if-

SSSSS«ti'i«V.f!.

Fi'gure 9- Installation in C-123 (right side)

27

�VIET NAM RANCH HAND OPERATIONS

A sketch of the ground support equipment used by RANCH HAND to refill
the A/A45Y-1 dispensers with agent is shown in figure 10. The refill system
presented here is the system used at Tan Son Nhut Air Base, Viet Nam. It
utilizes four 1000 gallon HOURGLASS tanks. A similar refill system is
used at Da Nang, but utilizes only three HOURGLASS tanks. These tanks
are the predecessor to the A/A45Y-1 and incorporate a 10-horsepower
engine and pump unit by which the agent is transferred into the aircraft.
The agent is delivered in 55-gallon drums, then pumped from three
drums at a time into the refill tanks. This is the slowest part of the
operation. The procedure for filling tanks is as follows:
a. The number 2 tank is filled from 55-gallon drums.
b. The agent in the number 2 tank is pumped into tank number 3.
c. Agent in tank number 3 is then pumped into tank number 4.
d. Tank number 2 is refilled and the agent pumped into tank number 3.
e. Tank number 2 is again refilled from the drums and pumped into
tank number 1.
.
f. All other tanks now filled, tank number 2 is refilled again.
Upon return from a mission, the aircraft is backed as close as possible
to the refill tanks and the systems are refilled with agent using a
commercial fire hose. After completion of the days work the HOURGLASS tanks are filled and the agent transferred into the aircraft. The
refill tanks are then refilled in preparation for a second mission. Due
to the long time needed to fill from the drums, the RANCH HAND crews
are limited to only one turn around, or a total of two missions.
A big disadvantage of refilling in this manner is the problem of
contamination to the agent. Foreign matter gets into the refill tanks and from
there into aircraft defoliant dispensing system. The rubber inside lining
of fire hoses, presently used, is acted upon by the defoliant and causes large
pieces of rubber to be released into the defoliant stream, thereby reducing the
system effectiveness. See figures 11 thru 14 for potographic on-site refill
operations.

28

�Figure 70. Existing Defoliant Transfer System Tan Son Nhut Air Base, Viet Worn

29

�Jiff,

Figure 11. Ranch Hand Worfc Area

ss^vavirrc .i«w«-i..7iBas.Mj-is-.e!*

2
^^nr.«!!«*'•• iiS*-j^rn'«—.5
\ • •-'. ;-. 'O^^s&amp;s^ ?

^praiw^s^s
lv%3$StiSt3&amp;M&amp;*5Jg*£e&gt;

^.^3^S^-^ •^X^V^.^«*SS*

^ai^k^^sssa^s^^^
Figure J2. Moor Class Tank and Pump
30

�^r^PS

Pump (Insulated)

•,-, i
*•" : •"• '- •Ofc-^a^^^^ .- V—-»*
_,-./^•S^^^^^^f^^^.
s^c

-;%*/---&lt; "^V .

5:5-,.-•• '-' .*

\Jfe*i

Figure ?4,. Hour Class Spider Pump

�SUPPORT FOR FLEXIBLE LIKE

55 GAL DRUM

NOZZLE FOR REFILLING A/A45Y-1

TRUCK FLAT-BED
;re 16. D*fo//oof Handling System Components

�of defoliant under sustained operation. The engine is a government
standard, air-cooled, four cylinder, four stroke cycle, horizontally
opposed model modified for remote control when mated with the control
console. The engine is available in large quantities, economical to operate, proven in performance, and easily maintained due to maximum accessibility. It is designed to operate a minimum of 1500 hours at rated load
and speed between major overhauls. Its extensive use in defoliation
operations tends to standardize maintenance and provide a spare parts
source through controlled cannibalization.
The pump has been modified by the manufacturer so that it attaches
to the engine at the blower section and the drive end of the crankshaft
thus giving the engine and pump a one to one ratio. Shock mounting is
provided to the engine-pump unit.
CONTROL CONSOLE

The control console is located at the end of the storage to permit
visual monitoring of any engine-pump unit on the platform. All transfer
functions are controlled by a single operator at the control console position.
In addition to control functions, there are certain monitoring gages and
instruments installed in the instrument" panel of the control console. The
electrical network is considered semi-permanently installed and so
arranged that simple maintenance is quickly accomplished.
TANK

The tank has a 10, 000-gallon capacity, protected sight gage, manhole, vent,
drain line connection, and facilities for securing to the platform. The sight gage
is a vertically mounted glass tube with connections to tank at each end, protectors
to reduce the probability of breaking, and calibrations to indicate tank contents.
MISCELLANEOUS

Suction Hose. Suction hoses are provided having an inside diameter
which will not be too restrictive to defoliant flow and having a wall structure
to prevent collapse of hose. Hoses which are frequently disconnected have
quick-disconnects to prevent rapid deterioration at connecting points.
Pressure Hoses. Pressure hoses are capable of pressures up to 100 psig
and have adapters in cases where control nozzles are attached. Hose material
is selected to withstand the chemical action of the defoliant.
35

�SYSTEM TIE-IN

The storage tank is located in the approximate center of the platform with
one engine-pump unit on the truck side of the platform and two engine-pump
units on the aircraft side of the platform. The single engine-pump unit has
a 3-inch suction hose connected between the pump and the suction manifold.
The suction manifold has three 1-1/4 inch suction hoses attached which are
suspended from the suction manifold in such a manner as to hang directly
over three 55-gallon drums on the flat bed trailer. A control console is
secured to the platform deck in the proximity of the end of the storage tank
and is electrically connected to the engine-pump unit.
Two engine-pump units and their companion control console are located
on the aircraft side of the platform and are shock mounted to the platform
deck. The suction ports of the two engine-pump units are manifolded so
that a single line attaches to the bottom of the storage tank. The discharge
(pressure) ports of the two engine-pump units are also manifolded and
after the pressure manifold, a single line conveys the defoliant to the aircraft having A/A45Y-1 dispensers to be serviced. Check valves are installed
in pump discharge lines to permit operation of a single engine-pump unit when
demands are less than maximum. At each aircraft position, a smaller
pressure line with a shutoff nozzle is connected into the main line hose.
These two engine-pump units are controlled concurrently from a single
control console.
An electrical network is provided which gives electrical tie-in of all
related electrically functioning units. Cable insulation is chemically unaffected by defoliant in the environs of the defoliant handling system.
CAPABILITIES

Transfer 10, 000 gallons from drums
to storage tank (less truck move time)
Service two A/A45Y-1 dispensers
(in aircraft)
Service four A/A45Y-1 dispensers
(in aircraft)
Remotely controlled functions:
1. Drums to storage tank
.
shutoff valves
2.

Storage tank to aircraft
main lines (2) shutoff
valves

25 minutes
5 minutes
5 minutes

3. Engine throttle
4&gt;

Engine starter

Engine ignition
b
&amp;

36

�PORTABLE DEFOLIANT HANDLING UNIT

The portable defoliant handling unit idea is conceived for military installations
where limited servicing of A/A45Y-1 dispensers might be required. The trailer
is capable of traveling at faster speeds and for greater distances than the A/
A/A45Y-1 dispenser and, being a powered unit, it speeds up the servicing of
the dispensers installed in aircraft. Overall dimensions are kept within limits
which will permit air transportation of loaded units to isolated landing fields or
airstrips.
Technical data and capabilities are contained in figure 17.

37

�-Tr^^z^^^L

96

fcs5&gt;

;T~

CZIiD

Figure 17. Tank Trailer De

�66

SMTWTFS

SMTWTFS

SMTWTFS

JAN

III

MAR

: r

i ^ ~li&gt;

~~i~~i~i'. s i B| 71 8

9 10 11 12JJ3: 14! 15
16" 17: 18 19! 20i 2li 22
23 24 25 26! 27 28[29
1)31.

,

!

1
6 7 8
13 14 15
20 21 22
28
27 i— —)

2
9
16
23

2j 3J 4i 5! BJ 7

1

^8

9' 10 1l! 121 13] 14

5 6 7 8
12 13 14 15
19 20 21 22
26 27 28 29

15 TB 17 18 19 20; 2T
22 23 24 25 26, 27 28
:

•

2
9
16
23
30

3
10
17
24

4
11
18
25

'
;

.
.

3
10
17
24

4
11
18
25

5
12
'19
26

6 7
,3 14

20 21
27 28

1
8
15
22
29

2
9
16
23
30

i ! J ll 2' 3
40! 6 ! 7 8 9 10
11 12! 13! 14! is; 16; 17

18 19: 20, 21; 22| 23 24
25 26! 27: 28; 291 30:

;

2
9
16
23
30

3
10
17
24
31

4
11
18
25

5
12
19
26

AU6

1 2
Q
^tf_
5 6 7 8
10 11 12 13 14 15 16
» 18 19 «L 21 ^2 23
24 » 26 27 28 29 30
31

©

7
14
21
28

1
8
15
22
29

2
9
16
23
30

NOY

!

r~i ' i i '

4 5
11 12
18 19
25 26

,
0

OCT

SEP

i_

3
10
17
24
31

JUl

JUM

f 1

29© 31

7
14
21
28

6
13
20
27

1 2
8 9
15 16
22 23
29 30

AM

.......

;

MAY

i—

3 4 5
10 11 12
17 18 19
24 25 26

SMTWTFS

6 7
13 14
20 21
27 28

1
8
15
22
29

6 7
13 14
20 21
27 28

1
8
15
22
29

•3
10
17
24
31

4 5 6
11 12 13
18 19 20
25 26 27

DEC

2 3 4 5
9 10 11 12
16 17 18 19
23
® 26
30

4 5 6
11 12 13
18 19 20
27

7
14
21
28

1
8
15
22
29

2
9
16
23

3
10
17
24
30 31

L.J
NOTES

39

�NOTES

�5C»H OM IfHlH FQlMlS HfftlQK.lt

Controlled Access :
Other Dual Thoroughfares
Principal Through Routes
Other Paved Roads
Streets and Connecting Roads
it Mileage Distances between red dots
Iniersiaie

J28 US

@ Stale

j77] Count

X. ii

* If

\

{

I

/

::

\

Lewisourg t.

-^vi/vf

\ A KrK"j^^^'^
^^my^^^F^^4

^-^^^^^£j^^^
iX

-r
"

^&amp;WP^s•/ 1
^'
yjp ^'--''m^rv^ fr/^
^iT *' '^
&amp;«^ ^'
7

3
t
J

!

l

r

^"fe &gt;« ^V. -^t«
Jr"~SsH# »-*^Z ^t? r&gt; ?-#~^
" f-A-^
t?^=-£^m^ui/
if ^^s-Jf^yul/
2 1S
::
!

jyftEi

'»OMnf&gt;''' «. .•«!•«••

i

iX^

tf

(P0p*.»t

W

fc_-

/^frfr^^^^ ^'
""H^S^^^^^-^
W^T/ J "
^
f

**$&amp;
iX*%

c

d
P
* /--•&gt;CtftIVc-' r-;--**MlCahaba
*^* /-"J^^TV;'' r-:" ^Cahaba

«;' '^j^'-Vestavia/.;.. :».".;•: v
» \^iHillsl''i ; •' ):

N

^^S« 1

" ~ A&gt;K
*^5\
BSL

W

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4962">
              <text>007</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4964">
              <text>0065</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="4967">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4961">
                <text>Scheidecker, Robert N.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4963">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;U.S. Air Force</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4965">
                <text>1966-08-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4966">
                <text>Minutes: A/A45Y-1 Internal Defoliant Dispenser System Support Conference, 25 and 26 August 1966</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="4968">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="4969">
                <text>Ranch Hand aircraft</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1429" public="1" featured="0">
    <fileContainer>
      <file fileId="1244">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/015a729b1af5623d424441746a06bc4d.pdf</src>
        <authentication>0d438b62c4671f25db3c1b731cdd1b84</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63193">
                    <text>Item ID Number

00355

Author

Scheidecker, Robert N.

Corporate Author

u.s. Air Force
Minutes: A/A45Y-1 Internal Defoliant Dispenser System
Support Conference, 25 and 26 August 1966

Journal/Book Title
Year

1966

Month/Day

Au ust

Color

M

Number of Images

1

DBSCrlptOU Notes

pages 32-34 missing; figures 4 and 17 incomplete. This
item was filed by Alvin L. Young under the category
Military Use of Herbicides (item no. 65) and under the
category Equipment, How Developed (item no. 356)

9

Monday, January 29, 2001

Page 356 of 382

�Item No.: 356
Author(s): Scheidecker, Robert N.
Editor/Translator:
Corporate Author:
Article/Report Title: Minutes: A/A45Y-1 Internal Defoliant
Dispenser System Support Conference, 25 and 26 August
1966
Journal/Book Title:
Date: August 1966
Publisher:
This item was filed by Alvin L.Young under the category
Military Use of Herbicides (item no. 65) and under the
category Equipment, How Developed (item no. 356).

Item no. 356 is a duplicate of item no. 65
Please see item no. 65 for the complete
document.

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6680">
              <text>024</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6682">
              <text>0356</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6685">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6679">
                <text>Scheidecker, Robert N.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6681">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;U.S. Air Force</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6683">
                <text>1966-08-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6684">
                <text>Minutes: A/A45Y-1 Internal Defoliant Dispenser System Support Conference, 25 and 26 August 1966</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6686">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6687">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6688">
                <text>herbicide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1303" public="1" featured="0">
    <fileContainer>
      <file fileId="1145">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/42cf7c14e91a84772f29cd3f258ff731.pdf</src>
        <authentication>fd2cf2b6a328349550d5cf305cdc8e80</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63094">
                    <text>INFO

PLAIN

McConnell, A.F.
1970
Mission: Ranch Hand

T f N t. T I. *
O

OF An« /;-

U,./

UJ

CM

CM N^ «K

I—

-X

^
•
«

O •£&gt;

•,
CJ

o
o

x
ua

oooooooool
o&gt;»ocxooooooWt
» « * * » * * *

&lt;y

l^J

^fj

^jg gQ

50

tibn11w

f PFY

JANUARY-FEBRUARY 1970
C H A N G ? IN E A R N t D R t l H B M

UOO CFY
REIMS UOQ 1ST
UOO

uno

,«F

V'

�AIR
UNIVERSITY

THE

P R O F E S S I O N A L

review

J O U R N A L

OF

THE

UNITED

S T A T E S

THE AIR STAFF
Gen. John C. Meyer, USAF
AIR FORCE MANAGEMENT
Lt. Gen. Duward L. Crow, USAF
MILITARY PROGRAMMING AND BUDGETING PRACTICES
D. V. Schnurr
•/THE ENVIRONMENT AND FUNCTIONS OF MANAGEMENT ANALYSIS IN THE 1970s
Dal Hitchcock
INFORMATION PROCESSING STANDARDS FOR COMPUTERS
Col. Lucius Theus, USAF
ON THE LEVERAGE OF MULTIPLE-PURPOSE WEAPONS
Richard H. Anderson
Dr. Bruno J. Manz
SOME ASPECTS OF AIR FORCE-UNIVERSITY RELATIONS
Dr. William J. Price
^HE TIME BARRIER: PSYCHOLOGICAL FRONTIER OF STUDENT ACTIVISM
1st Lt. Charles M. Plummer, USAF
Air Force Review
SIDE-FIRING WEAPON SYSTEMS
Lt. Col. Ross E. Hamlin, USAF
MISSION: RANCH HAND
Lt. Col. Arthur F. McConnell, Jr., USAF
In My Opinion
LAUNCH ON WARNING—A COUNTER TO THE ARMS RACE
Robert I. Widder
Books and Ideas
ON HISTORY AND STAFF WORK
Dr. I. B. Holley, Jr.
MILITARY HISTORY AND THE FIRST GREAT AIR WAR
Dr. James J. Hudson
THE CONTRIBUTORS

Address manuscripts to: Editor, Air Univcrtity Review, Aerospace Studies Institute. Maxwell Air Force Buse, Ala. 36112. Printed by
Government Printing Office, Washington, D.C.
Subscriptions are sold by Air University
Book Department, Maxwell Air Force Base,
Ala. 36112: yearly $4.50, back issues 75
cents. USAF RECURRING PUBLICATION 50-2.

Vol. XXI No. t

JANUARY-FEBRUARY 1970

AIR

FORCE

2
10
19
. . . .

28
36
46

57
65

76
89

95

101
109
114

the cover
With General John C. Meyer's article, "The
Air Staff," Air University Review enters
a new year and a new decade by beginning a new series of articles about the Air
Staff. In this, the first installment, Comptroller of Air Force activities are the center
of interest. Subsequent issues will focus
on other Air Staff agencies. Review readers will thus be given an up-to-date accounting of some of the important plans
and programs coming from the Air Staff.

�^MISSION: RANCH HAND
LlEUTKNANT COLOVEL AnTHXJK F. McC()NVKLL, Jit.

T

HE nature and environment of the conflict in South Vietnam have required the
U.S. and its allied military forces to revise
many traditional strategic and tactical concepts of operations. Without question one of
the most difficult and frustrating problems
facing these forces is that of actually locating
the enemy. The many densely forested areas
throughout the country afford the enemy excellent concealment, which permits him to
move personnel and supplies rapidly and with
impunity to within striking distance of key
government centers, lines of communication.
Special Forces camps, and other military
installations.
The use of air-delivered chemical defoliants as a tactical weapon to deny the enemy
concealment in forest areas evoked considerable interest in Southeast Asia as early as
1945. British forces operating in Malaya employed this tactic with a fair degree of effectiveness during the late 1940s, with helicopters
applying the defoliant along lines of communication. It was not until 195&amp;-59, however,
that the United States undertook any largescale defoliation tests. As a result of the tests,
several acceptable defoliants and delivery
techniques were selected for further consideration.
In late 1961 a test program in South Vietnam was approved for the United States Air
Force. With the lull concurrence and support
of the government of the Republic of Vietnam
(CVN) and the Vietnamese Air Force, this
project, under the code name RANCH IIAVD,
began trial operations in January 1962 with
three specially equipped UO-123 aircraft based
at Tan Son N'hut Airport. Saigon. The initial
unit designation was "Special Aerial Spray
Flight." Because of the newness and uniqueness of this weapon sv stern, the volunteer
crews assigned to the RANCH IIAVD project designed their own concept of operations and an
entire range of tactics and delivery techniques.

Constantly innovating and modifying, the
crews slowly developed a highly effective
defoliant-delivery operation geared to the
varied tropical vegetation, foliage, and terrain
of Southeast Asia.
By June 1962 the crews of the Special
Aerial Spray Flight were ready to fly tactical
missions, and it was not long before the merits
of the delivery sxstem were proven. A notable
effort occurred in October 1962. when the
crews successfully completed their first largescale defoliation mission on the Can Man
Peninsula in the Mekong River delta. This
project was personally observed and evaluated
by the Chief of the U.S. Army Chemical Corps
as "outstanding."
Even so, defoliation operations in the following months wen- mostly conducted on a
moderate scale. By mid-1964. however, authority had been received to expand project
coverage and to establish limited operations
from Da Nang Air Base. The program \vas
proving its worth, and new target requests
were constantly being received.
As hostile ground fire became more intense;, the mission became extremely hazardous. The heroic efforts of the early spray crews
were not without cost. Since the need to assign
fighter aircraft to escort and support the defoliation project had not yet been recognized,
the spray aircraft were entirely defenseless.
However, despite the considerable number of
problems inherent in their mission, the RANCH
HAND crews delivered increasing amounts of
defoliant on targets from the Demilitarized
Zone (n\fz) to the delta.
Although RANCH HAND aircraft received
heavy automatic-weapons fire from the ground
with increasing regularity, it was not until
January 1965 that approval was granted to
prestrike targets with fighter aircraft and to
provide a fighter escort for the spray aircraft.
From that point forward, close-in fighter support was a vital part of the defoliation pro-

�90

AIR i:\ivF.nsin'

gram and made a significant contribution
toward minimizing the effect of ground fire
against tho defoliation aircraft, although it
could not entirely eliminate losses of aircraft
and crews.
Operations continued to increase during
1965, and tlie Special Aerial Spray Flight successfully completed defoliation of a number
of critical target areas. Particularly noteworthy
was the unit's work in the Rung Sat Special
Zone, a dense mangrove-covered swamp along
the main shipping channels into Saigon. Because of the excellent cover afforded by the
mangrove swamp, hostile forces operated with
near impunity throughout the area and constantly harassed allied shipping into and out
of the capital city. In March 1965 Rung Sat
was placed on the list of critical targets, and
in the following weeks sp. ay crows Hew 42
missions into the area, delivering over 77.000
gallons of defoliant on the target. The results
rank as one of the most successful de-foliation
projects carried out by RANCH HAND crews,
enabling friendly forces to sweep the area and
secure the shipping channels against further
enemy encroachment.
Another \ital target during this period
was War Zone D. In spite of hcav\ hostile
troop concentration within the target area and
almost continuous ground fire, tho spray crews
returned again and again until the project was
successfully completed.
Because of a greatly increased demand
for defoliation throughout South Vietnam, the
United States and South Vietnamese governments directed that the HANOI HAND program
be expanded. On 15 October 1966, the 12th Air
Commando Squadron (HA.NCIJ HAND—VILTVAM)
became an administrative and operational
reality. It was initially equipped with 18
UC-123 spray aircraft, and the crews—all
handpicked volunteers—quickly established an
outstanding reputation for mission accomplishment throughout South Vietnam.
Several important events occurred in the
months following establishment of the 12th
ACS. including approval to assign OIK; aircraft
to Operation Flyswaltor, a program designed
to deliver insecticides over various populated
areas throughout the country, to control ma-

laria mosquitoes and other disease-bearing
insects. Using techniques similar to those
employed in defoliation, the insecticide crews
made an outstanding contribution to the
health and welfare of the people of Vietnam.
I5y late 1966 the 12th ACS had significantly
increased ils defoliation operations and embarked upon another key project: the southern
half of the DM/, was approved for targeting.
Flying o\er flat terrain and visible to the
enemy for many miles throughout the target
run. the HAVCII HAND crews courageously defied groat odds to place their defoliant precisely on the briefed targets. As a result of
these operations, much of the southern portion
of tho DM/, was exposed, and the enemy was
denied ready access to his hitherto secure;
infiltration and supply routes into South Vietnam.
In December 1966, as RANCH HAND crews
continued their country-wide defoliation
schedule, the 12th ACS moved its operational
headquarters to Bien Iloa Air Base, where it
remains today.
During early 1967 the main areas of activity were War Zones C and D. while Da
Nang-based aircraft concentrated on targets
along enemy infiltration routes in South Vietnam. One of the highlights of this period was
Operation Pink Rose, a jungle-burning project
carried out by RANCH HAND crews. They (lew
approximately 225 sorties and delivered over
a quarter-million gallons of herbicide on
selected target areas in War Zones C and D.
successfully completing their part ill tho project in April 1967.
Target areas throughout the country wen;
sprayed during the remainder of 1967, particular emphasis being placed on vital targets
in the IV Corps area. This accounted for
a significant increase in hits received from
ground fire during 1967. since the flat terrain
of the delta region allowed enemy gunners to
see the spray aircraft coming from miles away.
The flexibility of the 12th Air Commando
Squadron \\as severely tested in February
196S. in the throes of the Communist Tet
offensive 1 . The unit was directed to assume an
airlift role under diree;tion of its parent organi/ation. the- 315th Air Commando Wing. The;

�A/rt FORCE REVIEW
RANCH HAND team stripped the aircraft of all
defoliation equipment, including tanks and
spray booms, and reported in. "Ready to go."
in the amazing time of 24 hours. During the
weeks that followed, crews of the 12th flew
2866 productive sorties in the airlift role, with
the same professionalism and /.eal which had
become the RANCH HAND trademark.
After the Tet offensive was blunted, the
UC-]23s were restored to their defoliation
mission. Again in minimum time, maintenance
teams reconfigured the aircraft, and spray operations were quickly resumed.
The remainder of 196S reflected a continning increase in the amounts of herbicides
dispensed and in the testing of new formations
and tactics. So that seasonal weather for spraying priority targets in I Corps might be used
to advantage, a significant increase was made
in the size of the detachment operating from
Da \ang Air Base, and the sortie rate doubled. RANCH HAND crews operating from this
forward base flew highly successful defoliation missions against some of the most heavily
defended areas in South Vietnam, including
the A Shau Valley, Khe Sanh. and as far south
as Pleiku. In defiance of the rugged mountain
terrain and accurate enemy antiaircraft fire,
the defoliation crews frequently went in over
these vital targets in order to open them np
for aerial observation. The results were always
outstanding, as attested to by Army commanders and aerial observers.
On 1 August 1968 all units in Southeast
Asia with an "Air Commando" designation
were renamed "Special Operations," and
RANCH HAND became the 12th Special Operations Squadron.
Between the date of the first RANCH HAND
flight in January 1962 and 1 January 1969,
defoliation crews made more than 19,000 combat sorties, all of which were flown under the
extremely difficult and hazardous circumstances associated with defoliation work. With
rare exceptions, target areas were occupied
and/or utilized by unfriendly forces, consisting primarily of hostile base camps and lines
of communication.
In this hostile low-level environment the
RANCH HANDS received more than 3500 hits

91

from all types of enemy ground fire. Yet, without hesitation, with complete disregard for
personal safety, and in outstanding displays
of courage and determination, combat crews
daily flew their four-minute target runs—the
"run of terror"—arid laid the defoliant with
near-perfect precision.
The enemy has testified to the effectiveness of HA NCI r HAND operations. A Viet Cong
prisoner of war observed that after a base area
had been sprayed the camp would be moved.
Kach man would pick up his hammock and
backpack and walk about three hours to a
new camp site. Another i&gt;ow stated that defoliated areas hampered the vc in moving
and stationing troops. These areas had to be
avoided for nearly a year before they could
be reused.
When it was necessary to cross a defoliated area en route to an objective, the vc
waited for nightfall or crossed singly—either
course of action delaying the movement.
When it was necessary to cross small defoliated areas, they crossed in daylight, provided
the unit could assure itself that no aircraft
were in the vicinity. With regard to the defoliation along GVN lines of communication,
the vc published orders making the removal
of brush and trees along roads and waterways
a punishable offense: they used the cover for
hiding places from which to spring ambushes.
Our defoliation and subsequent removal of
vegetation along such lines were therefore a
prudent exercise.
^—,„.., .......
—•- "*Trp
'Defihite""a3vantages accrued from the de- 4/
foliation program, particularly along the lines
of communication in South Vietnam. In one
instance, no ambushes or hostile incidents
occurred after defoliation. In another, there
were only eleven in a four-month period. In
a third, the number of incidents decreased
from six in four months to four in six months.
During this same period, the amount of traffic
along the roads remained constant or increased. Thus defoliation resulted in a dramatic decrease in the incident rate, and the
potential for ambush was greatly reduced.
Defoliation along one river caused the vc to
evacuate their sheltered positions there. Along
another river, defoliation caused at least three
Continued on page 94

�Defoliation
Operations

The boundaries of a defoliation objective must be
carefully observed, to ensure maximum concentration
of the herbicide on Viet Cong areas. The formation
leader and following aircraft keep lateral distance so
as to cover the proper swath. . . . The Hayes AA-45
internal defoliant system . . . A C-123 modified for
defoliation operations . . . Spray as seen from the tail.

��94

AIR UNIVERSITY

REVIKW

ainbush attempts to fail in a region when;
/ they had regularly succeeded.
There was a vivid improvement in the
ability to find enemy routes of travel, bunkers,
structures, and defenses after the foliage cover
had been removed. Ground commanders reported increased visibility from 40 to 60 percent, while forward air controllers reported
improved aerial visibility from 70 to 90 percent.
~1
War Zones C and D were heavily defoliated. Prior to defoliation, seven brigades wen;
necessary to maintain U.S./GVN presence in
War Zone C; after defoliation, only three were
required. In War Zone D, only one brigade
was necessary after defoliation. In one instance plans called for a 22s-division effort to
be conducted. Defoliation made this operation
unnecessary. These examples emphasized the
value of the defoliation operations and underlined the need for continuation of the program.
IN SUMMARY, the defoliation program did
what it was intended to do. Viet Cong routes of
movement were revealed, and their hiding
places were eliminated. They were forced to
divert resources to noncombatant tasks—moving base camps, waiting for hours of darkness,
etc. The number of our trucks and troops lost
in ambushes decreased because of defoliation
operations.
The unique role played by RANCH HAND

in Southeast Asia bred an esprit de corps
among its members that became respected
throughout the area of operations. Taking
immense pride in their mission, their aircraft,
and their purple scarves, RANCH HAND crews
displayed gallantry and courage of the highest
order. With full knowledge of the importance
of their work, as well as its hazardous nature,
they continued on countless target runs while
receiving intense and accurate hostile ground
fire. They significantly increased the ability of
aerial observers to monitor the movements of
hostile forces and to direct fighter-bomber
strikes against them. More important, they
provided allied ground forces with protection
against sneak attack by depriving enemy
troops of valuable ambush positions, resulting
in many allied lives saved. In totality, they
enhanced the combat effectiveness of allied
air and ground forces fighting in Vietnam.
The obvious corollary to a successful air
mission is a reliable ground operation. The
dedication of the maintenance crews of the
12th Special Operations Squadron in preparing the aircraft for flight, in continually repairing battle-damaged aircraft, and returning
them to operational status in minimum time
is equally responsible for the success enjoyed
by the RANCH HAND mission. The 12th has
written a new page in the history of aerial
warfare.
Ent Air Force Basv, Colorado

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5642">
              <text>015</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5643">
              <text>0159</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="5647">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5641">
                <text>McConnell, Arthur F., Jr.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="48">
            <name>Source</name>
            <description>A related resource from which the described resource is derived</description>
            <elementTextContainer>
              <elementText elementTextId="5644">
                <text>Air University Review</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5645">
                <text>January-February 1970</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5646">
                <text>Mission: Ranch Hand</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="5648">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="5649">
                <text>military impact</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1425" public="1" featured="0">
    <fileContainer>
      <file fileId="1240">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/bc319e3111ea0218ef09e3aae8852d2d.pdf</src>
        <authentication>04e7e763c1b62eddf0b80cf3ed977a60</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63189">
                    <text>Item ID Number
Author
Corporate Author
Report/Article Title

00338
Brown, James W.
[U.S.

Air Force, U.S. Department of Agriculture, and U.S.J

(Modification and Calibration of Defoliation Equipment
KC-123 First Modification)

Journal/Book Title
Year
Month/Day
Color
Number of Images
Doscrlpton Notes

185
This item was filed by Alvin L. Young under the
category Military Use of Herbicides (item no. 61) and
under the category Equipment, How Developed (item
338); OSD/ARPA Order 256-62, Amendment 4;
Supplement: Graphs of Spray Deposit not included

Tuesday, January 23, 2001

Page 338 of 341

�Item No.: 338
Author(s): Brown, James W. and Donald Whittam
Editor/Translator:
Corporate Author:
Article/Report Title: Modification and Calibration of
Defoliation Equipment (C-123 First Modification)
Journal/Book Title:
Date: July 1962
Publisher:
This item was filed by Alvin L.Young under the category
Military Use of Herbicides (item no. 61) and under the
category Equipment, How Developed (item no. 338).

Item no. 338 is a duplicate of item no. 61
Please see item no. 61 for the complete
document.

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6642">
              <text>021</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6644">
              <text>0338</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6647">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6640">
                <text>Brown, James W.</text>
              </elementText>
              <elementText elementTextId="6641">
                <text>Donald Whittam</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6643">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;U.S. Air Force, U.S. Department of Agriculture, and U.S. Army (Cml Corp)</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6645">
                <text>1962-07-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6646">
                <text>Modification and Calibration of Defoliation Equipment (C-123 First Modification)</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6648">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6649">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6650">
                <text>herbicide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1433" public="1" featured="0">
    <fileContainer>
      <file fileId="1248">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/ddefb13719614505e1f0c0aa461f14cc.pdf</src>
        <authentication>eb024c221a893d868ed9a2e5f48db212</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63197">
                    <text>Item ID Number

00379

Author

Ramsauer, Larry R.

Defense Technology Laboratories, FMC Corporation

RepOrt/ArtiClO TitlO PWU-S/A Modular Internal Spray System

Journal/Book Title
Year

™™

Month/Day

Januar

Color

L]

Numbor of Images
DOSOrlptOD NOtOS

v

201
Alvin L Your)

9 had this item filed under the category
"Equipment - How Developed, How Used"; contract no.
F08635-69-C-0213, project no. 5172, task no. 05, work
unit no. 00

Monday, January 29, 2001

Page 379 of 382

�Hamsauer, L.R.,
1972

I/UNLIMITED

PWU-5/A Modular internal Spray system
AD 904481

Technical
Report
distributed by

Defense Technical Information Center
DEFENSE LOGISTICS AGENCY
Cameron Station. Alexandria, Virginia 22314

AEROMEDICAL LIBRARY
10 1980

UNCLASSIFIED/UNLIMITED

DOCUMENTS

�..;
i

THIS REPORT HAS BEEN DELIMITED
AND CLEARED FOR PUBLIC RELEASE
UNDER DOD DIRECTIVE 5200.20 AND
NO RESTRICTIONS ARE IMPOSED UPON
ITS USE AND DISCLOSURE,

DISTRIBUTION STATEMENT A
APPROVED FOR PUBLIC RELEASE;
DISTRIBUTION UNLIMITED,

"

�i-.'' ?&amp;5$$c3

1.0 %
II

1*1

t

is B2£

ku

1.25 IIIU.4 11.6

MICROCOPY RESOLUTION TEST CHART

�TiiJijfcJHliiliiiffltt'fc'irffH^tn

feS^&amp;-j&amp;&amp;x^:iS?-3i;"
jtffwSitifisvw**^*,. j^r .,1

.1-

-

-4im •»;. w**s
m;. K^^^/^'^mMm^mm^m^s^

M

MODULAR INTERN A
^••'^•^^•••
SPRM SYSTEM

EFENSE TECHNOLOGY LABORATORIES

TECHNICAL REPORT AFXiUTR-72-13

ntitrib ition limited to U. S. Government agencies only;
Sis reportdocuments test and evaluation; distribution
limitation applied January 1972. Other requests for
SS focuLnfmust be referred to the AirTorce Armament
Laboratory '"'TC^ Pfr14n Air Force Base'Florida 3254Zl

.J

FORCE ARMAMENT

&lt; I.

FORCE SYSTEMS COMMAND • UNITED STATES

EGLIN

^^:'^^X^Vlt''- ' ; ''(i" '^:''' •••"*-H / ••'-•-• ••-•^pip
J
Di^UiS&amp;^J .^y^b^^3^^ «^-t.:'i^^.wA i.^*;^J\:,4.:&gt;-.;^^Sfe£f

�PWU-5/A Modular Internal
Spray System

Larry R. Ramsauer

Distribution limited to U. S. Government agencies only;
this report documents test and evaluation; distribution
limitation applied Januarv 1972 . Other requests for
this document must be referred to the Air Force Armament
Laboratory (OLIF), Eglin Air Force Base, Florida 32542.

�FOREWORD

This report has been prepared by the Defense Technology Laboratories
(DTL) of FMC Corporation* San Jose/ California, under Contract
F08635-69-C-0213. Program monitors for the Armament Laboratory
were Mr. Marshall G. Solomon (DLGZ) and Captain Harold L. Hebert
(DLIP).
The design, development, fabrication, testing and delivery of the
PWU-5/A Modular Internal Spray System was conducted from
•7 July 1969 through 30 September 1971 by DTL under the direction
of Mr. Atlee H. Bussey, Program Manager, and Larry R. Ramsauer,
Project Engineer. Technical personnel assigned to the program
were William P. Farris, David N. Singletary, Richard W. Triebel,
and Forrest A. Hettinger.
This technical report has been reviewed and is approved.
—-y/t ^ j'£s t^j^"^/*/•
Ftfanklin (XDavi)/s, Colonel, USAF
Chief, Flame, Incendiary, and Explosives Division

ii

�ABSTRACT

The PWU-5/A Modular Internal Spray System (MISS) has been designed
and developed to fit ten cargo/utility-type aircraft, including
the C-47, C-54, C-123, and C-130. The system was designed to
disseminate herbicides, pesticides, and fertilizers in chemical
solution, suspension, or slurry form at ground deposition rates
from 3 ounces/acre to 3 gallons/acre with a minimum swath width
of two times the applicable aircraft wing span. The system is
completely self-supporting, requiring no aircraft power, and
includes provisions for suction filling, agent recirculation/
agitation, dissemination, system flushing, aircraft washdown, and
emergency dumping of the full agent payload. The system used
aerospace adhesive to secure all external hardware, allowing
system installation with minimum aircraft modification. A complete
C-123K MISS was installed and flight tested at Eglin Air Force
Base, Florida. The system was subjected to the complete flight
envelope and functioned as designed. Flight test results indicated
that manual operation of the emergency dump took too long to
initiate. The dump chute should be moved to the aft portion of
the jump door to minimize emergency dump contamination, and the
right-hand fuselage spray station should be capped off to eliminate
fuselage spray contamination.

Distribution limited to U. S. Government agencies only;
this report documents test and evaluation; distribution
limitation applied January 1972. Other requests for
this document must be referred to the Air Force Armament
Laboratory (i^LIF), Eglin Air Force Base, rlorida 32542.

iii

(Tne reverse of this page is blank.)

�TABLE OF CONTENTS

PAGE

SECTION
I

i-

•

1

II

INTRODUCTION
SUMMARY

III

DESCRIPTION

5

3.1

5

3

System Description

3.2 System Parameters

7

3.3

7

Component Description

SYSTEM DEVELOPMENT

33

4.1 Aircraft Consideration

33

4.2
4.3
4.4

IV

81

4.5
4.6
4.7
4.8
4.9

V
Appendix
I
II
III

Chemical Agents
Agent Transfer System
Plastic Agent Transfer System
Flow Model

88
96
99
105

Tank Module
Power Module
Internal Plumbing
External Plumbing
Electrical System

108
110
117

4.10 Ground Operations
4.11 Reliability and Maintainability
4.12 Safety Considerations
4.13 Value Engineering
4.14 Category I Testing
-i
4.15 Category II Testing
CONCLUSIONS AND RECOMMENDATIONS

117
123
123
126
126
127
129

ELECTRICAL SYSTEM DESCRIPTION
CATEGORY I TESTING REPORTS

131
147

STRESS ANALYSIS

161

VTV

�LIST OF FIGURES
FIGURE

1

PAGE

C-123 Modular Internal Spray System
Kit No. 4373716

6

2
3
4
5
6

Agent Transfer System Schematic
Agent Transfer System Power Module Piping
Pneumatic System Schematic
Power Module Assembly (Front View)
Power Module Assembly (Back View)

7

Power Module Assembly (Left View)

17-18

8

Power Module Assembly (Right View)

17-18

9
10

Tank Module Assembly (side View)
Tank Module Assembly (End View)

21
22

11

Tank Module Assembly Electrical Cable Connection

23

12

Control Panel

25

13

Vent Valve Control Schematic

27

14

Pilot Controls

30

15

C-47D Floor Plan

38

16

C-54G Floor Plan

17

C-123K Floor Plan

18

C-130E Floor Plan

46

19

C-46D Floor Plan

49

20
21

C-97G Floor Plan
C-118A Floor Plan

,,.

50
52

22

C-119G Floor Plan

-

55

23

C-121G Floor Plan

-

57

24
25

C-131E Floor Plan
C-47 Modular Internal Spray System
Kit No. 4374132

••

58

26

9
10
12
15-16
15-16

:;-

,

. . . . - . , .

40
44

59

C-130 Modular Internal Spray System
Kit No. 4374236

60

27

Mounting Plate (First Design)

64

28

Bonded Mounting Plate Load-lime History

65

29

Modified Mounting Plate Design No. 1,
Picture Frame

66

VI

�LIST OF FIGURES (Continued)
FIGURE
30

.
Modified Mounting Plate Design No. 2, •

Picture Frame with Gussets
31
32
33
"34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

PAGE

Modified Mounting Plate Design No. 3,
Slotted Plate
Modified Mounting Plate Design No. 4,
Individual Bonding Pads
Wing Boom Drag Coefficient
Aircraft Loading Nomenclature
—
Module Envelope
C-47 Installation
Wing Vortex Effect
Effective Swath Width
Thixotropic Nature of Slurried Fertilizer
Agent Transfer System (Original Proposed
Concept)
Agent Transfer System (Second Concept)
Agent Transfer System (Third Concept)
Agent Transfer System (Fourth Concept)
Plastic Agent Transfer System Flow Model
Plastic Flow Model Schematic
Tank Module (Original Concept)
Split Series Tank Module (First Concept)
500-Gallon Tank
500-Gallon Tank Module
Power Module (Early Design)
Power Module (Later Concept)
Check Valve Type Nozzle
Nozzle Valve Assembly
Dynamic Wing Boom Operation
Wing Boom Strap Assembly
Field Fill
Airfield Fill
Mixing/Filling Operation with Wettable
Powders
vii

67
68
69
71
- 74
76
77
80
82
86
91
92
94
95
97
98
101
102
103
104
106
107
111
113
115
116
119
120
121

�LIST OF FIGURES

(Concluded)

FIGURE

PAGE

59

Tank Flushing

122

60

Functional Level Diagram for the Modular
Internal Spray System

124

1-1

Main Power Circuitry

132

1-2
1-3
1-4
1-5
1-6

Circuit Breaker Delay Curves
Flowmeter Circuit
Engine Control Circuit
Agent Level System Circuit
Liquid Level System Automatic Engine Shut-off
Electrical Schematic
Spray Circuitry
Dump System Circuitry
Vent Valve Control System Logic Diagram
(One Valve)
Vent Valve Control System Schematic (One Valve)

134
135
137
139

1-7
1-8
1-9
1-10

Vlll

140
141
143
144
145

�LIST OF TABLES
TABLE

TITLE

I

PWU-5/A Modular .Internal Spray System Parameters

II

PACE

8

Aircraft Characteristics

34

Aircraft/System Parameters

36

IV

Enviroirnental Factors

37

V

C-54G Tie-Down Details

41

VI

C-123 Tie-Down Details

45

VII

C-130E Tie-Down Details

47

VIII

C-97G Tie-Down Details

51

C-118A Tie-Down Details

53

C-119G Tie-Down Details

56

III

IX
X
XI

XII
XIII
XW
XV
XVI
XVII

'

Aircraft Performance Degradation and Horsepower Increase
Required to Maintain Cruise Condition Using Streamlined
Wing Boom
72
Installation/Removal Data

74

Contamination Possibilities

79

Spray Parameters

83 ,

PWU-5/A Modular Internal Spray System Agents

85

Agent Application Rates

87

PWU-5/A Modular Internal Spray System Agent Compatibility 89
Compatibility
89

ix
(The reverse of this page is blank)

�SECTION I
INTRODUCTION

This report describes the work performed in the development of
the PWU-5/A Modular Internal Spray System, designed to disseminate various chemical agents utilizing ten different cargo/
utility-type aircraft.

Major effort was devoted to the design of a modular spraying
system which would exploit the full payload capabilities of all
applicable aircraft by using multiples of the modular components,
allow for installation and removal at the organizational level
without permanent modification to the aircraft, and permit
spraying of a large variety of chemical agents over a wide range
of deposition rates. Compliance with these requirements resulted
in the use of a modular power unit and multiple modular 500-galloncapacity tank units. All hardware attached to the aircraft skin
(wing booms, etc.) was attached using adhesive to avoid metal
cutting or welding. Emergency dumping was accomplished through
the use of internal ducts, manifolded into a single duct, which
exhausted at an open rear jump door.
To assure an optimized agent transfer system, a complete system
flow model was built and tested.
This report contains a complete description of the PWU-5/A
Modular Internal Spray System; a development history of each of
the major subsystems and components; discussions of contamination
and safety considerations; ground and flight testing results; and
discussions of reliability, maintainability, and cost effectiveness. The appendices contain the stress analysis for the various
system internal components. Analysis of the C-47, C-123, and
C-130 external hardware and complete installation instructions
are presented in the modification documents for these aircraft.

1
(Tl'.e reverse of this page is blank.)

�SECTION II
SUMMARY
The detailed design requirements were defined in the contractual
document. The design and development effort was directed at the
complete system, including aircraft compatibility; material/agent
compatibility; minimizing aircraft modification; internal tanks,
power module, and agent transfer system; emergency dump, and
sealed tank venting system; external wing booms, nozzles, and
positive shut-off nozzle valves; operator and pilot controls;
flow rate monitoring and control; contamination prevention; builtin ground support features including self-filling and draining,
system flushing, and aircraft washing; reliability, maintainability
and supportability.
The PWU-5/A MISS was designed to be compatible with and exploit
the full payload capabilities of the C-46, C-47, C-54, C-97,
C-118, C-119, C-121, C-123, C-130, and C-131 aircraft. Each
system uses a single power module; multiple tank modules; multiple
standard wing boom, dump, and vent sections; and miscellaneous
plumbing fittings. Due to the unique geometry of each aircraft,
different length hoses and other special fittings are used for
each installation. These special parts are kept to an absolute
minimum, utilizing the modular concept to the fullest extent
possible.
The agent transfer system contains all necessary controls and
monitoring equipment to fill, mix, and disseminate chemical solutions, suspensions, or slurries. Dissemination rates may be
varied from 2.5 to 600 gpm while controlling tho flow rate to
within + 5.0 percent. This flow rate range permits all aircraft
to meet the required 3-ounce to 3-gallon per acre ground deposition rates while maintaining an effective swath of at least two
times the wing span of the applicable aircraft.
To minimize agent transfer system components and insure system
effectiveness, a complete agent transfer system flow model was
built and tested.
All system components were studied to reduce hardware costs while
maintaining functional effectiveness.
The C-47, C-54, C-123, and C-130 aircraft were selected as primary,
and complete PWU-5/A Modular Internal Spray Systems wers designed,
fabricated, tested, and delivered for the C-47, C-123, ind C-130
aircraft.

�The C-123K MISS wa&amp; installed and flight tested at Eglin Air
Force Base. The delivered C-130 system, to be used for Air Force
flight testing, utilizes four tank modules instead of the eight
tank modules normally installed in a C-130 aircraft. Complete
system fitment tests for the C-47, C-123, and C-130 aircraft were
made at NAS Moffett Field, California, to insure aircraft/system
compatibility.
Material/agent compatibility studies were made to select compatible system materials at minimum cost.
Several prime system components were cycle tested to verify a
minimum 5-year life. Flowmeter accuracy tests were performed'
as were functional tests of major hardware components.

�SECTION III
DESCRIPTION
3*1

SYSTEM DESCRIPTION

The PWU-5/A is an airborne, modular, reusable system capable of
disseminating defoliants, herbicides, pesticides, and fertilizers
as chemical solutions, suspensions, or slurries. The system
consists of a power module with a control panel, multiple agent
reservoirs, an emergency dump system, wing booms and fuselage
spray stations with positive shut-off nozzle valves, a sealed
tank venting system, and miscellaneous piping and fittings. The
system can be assembled in various combinations to fit the ten
specified cargo-type aircraft. Figure 1 shows the C-123 MISS
installation, which is a typical two-tank system. Larger air-'
craft use additional tanks. The C-130 uses eight tanks, four
on each side of the power module. The C-54 uses four tanks, two
on each side of the power module. The C-47 MISS installation is
unique in that it uses two tanks, both on the same side of the
power module.
The power and control module contains all necessary equipment
for controlling filling, priming, recirculating, disseminating,
emergency dumping, flushing, and draining the fluid system. Thn
system is entirely self-supporting, requiring no aircraft power.
System power is provided by an air-cooled, internal combustion
engine which drives the main pump, an air compressor, and generates necessary electrical power., The control panel includes all
gages and controls for complete system operation and .monitpring.
In addition, the aircraft pilot is provided with controls for '
both disseminating and emergency dumping.
. . . . . . u.- :•.• •
The agent reservoirs have a usable capacity of 500 gallons each
and include a filler cap, vent line, level sensors, inlet and
outlet tubes, and an emergency dump valve.
The entire system is closed to insure no escape of agent or agent
vapors inside the aircraft. The power module' a'nd tank modules
have captive, retractable casters for/mobility,.
All nozzle stations have pneumatically actuated positive shut-off
valves that prevent agent leakage at the nozzles when spraying is
stopped. These valves are fail-safe; if the pneumatic actuation
line fails, the valves continue to function as agent shat-off
valves but will only sc-al against agent pressures less than 5 psig.
Minimal aircraft modification is assured by routing all -external
plumbing, the tank vent system line, and the emergency dump outlet line through the aircraft jump Joors, and by bonding che
external plumbing and wing boom mounting plates to the aircraft
with an aerospace adhesive.

�TANK MODULE ( )
2
POWER MODULE (I)

FUSELAGE HOSE
ASSEMBLY

l-BOOM TRANSFER TEE ASSEMBLY
Figure 1.

C-123 Modular Internal Spray System Kit No. 4373716

�3.2

SYSTEM PARAMETERS

The parameters given in Table I apply to the complete MISS system
as installed in;-the ten specified aircraft. Parameters of the
individual system modular components are discussed in paragraph
3.3.
3.3
3.3.1

COMPONENT DESCRIPTION
Agent Transfer System

The agent transfer system consists of all components which transfer agent from the tanks to the wing booms. The transfer system
is shown in schematic form in Figure 2, and the power module
piping portion of the system is shown in Figure 3 for crossreference.
.
.:„.
The system uses twin 4-inch suction lines to draw agent from the
tanks. These 4-inch suction lines merge and feed the centrifugal
pump. The pump output may be directed four ways; (1) recirculated back to the tanks, (2) disseminated through the high volume
spray system, (3) disseminated through the low volume spray system,
(4) drained through the power drain port.
The amount of recirculation is controlled by a butterfly valve,
and recirculation may continue during spraying.
Both the high and low volume spray systems have turbine flowmcters
for accurate flow rate monitoring. Each system also has its own
throttle valve to allow adjustment of flow rates. The low volume
system has a fine mesh strainer to filter out foreign matter,
which may tend to plug the extremely small orifices of the low
voldme spray nozzles.
The MISS agent transfer system is self-supporting in that it
includes provisions for self-priming, suction filling, and power
draining. Self-priming is accomplished by using an air eductor
which draws agent through the ground fill hose and the centrifugal
pump. Once the centrifugal pump is primed, it becomes the pumping
source for suction filling.
During power draining, the centrifugal pump transfers agent from
the tanks through the appropriate ground support hose.
The agent reservoirs are equipped with motor-driven vent valves,
which automatically open when the desired function switch is
thrown on the control panel (i.e., pump prime, fill, dr.iin, etc.).

�TABLE I.

PWU-5/A MODULAR INTERNAL SPRAY SYSTEM PARAMETERS

SMALLEST SYSTEM
LARGEST SYSTEM

2 TANKS, 1 POWER MODULE
8 TANKS, 1 POWER MODULE

CAPACITY

0 - i*,000 GALLONS (MAX.)

DISSEMINATION RATE

2.5 GPM CHIN.)
s6o GPM (MAX.)

FLOW RATE MONITORING ERROR

LESS THAN i 5.0% FROM 2.5
TO 600 GPM

SUCTION FILLING RATE USING
50-FOOT, 2-INCH DIAMETER HOSE
1U5 GPM 57-INCH LIFT
WITH WATER
125 GPM 16.5-FOOT LIFT
WITH 55-GALLON DRUM
SUCTION PROBE ATTACHED,
75 GPM 57-INCH LIFT
WITH WATER
50 GPM 16.5 FOOT LIFT
EMERGENCY DUMP TIME

LESS THAN U5 SECONDS FOR 1/2
AGENT PAYLOADFORALL AIRCRAFT

ELECTRICAL SYSTEM

28 VDC, ALL CIRCUITS INDIVIDUALLY PROTECTED BY BREAKERS

NOZZLE VALVE

3/14-INCH PNEUMATIC DIAPHRAGM

DUMP VALVE

k-INCH BUTTERFLY, PNEUMATIC
WITH MANUAL OVERRIDE
3-INCH BUTTERFLY, PNEUMATIC

SPRAY VALVE
SELF-SUPPORTING

FEATURES

NO AIRCRAFT POWER REQUIRED
SUCTION FILL
POWER DRAIN
TANK WASHING NOZZLE PROBE
AIRCRAFT WASHING GUN
RECIRCULATION MIXING

�TO
WING BOOMS
©
&lt;2&gt;
d&gt;
®
&lt;D
©
©
&lt;D

DISSEMINATION

EDUCTOR EXHAUST
AND AGENT.

»
*
3
3
3
3
I
3

INCH
INCH
INCH
INCH
INCH
1KCH
INCH
tNCH

TANK SUCTION VALVE
SUCTION VALVE
SUCTION FILL VALVE
POWER DRAIN VALVE
RECIRCULATION VALVE
HIGH VOLUME SPRAY
LOW VOLUME SPRAY THROTTLE
SPRAY -ON-OFF" VALVE

LEGEND
=
=
LSU-T

=4
CS3-Q

LOW VOLUME STRAINER
TURBINE FLOWMETER

=

BUTTERFLY VALVE, MANUAL LEVER

= BUTTERFLY VALVE, MANUAL HANOWHEEL
= BUTTERFLY VALVE, PNEUMATIC
=

DIAPHRAGM VALVE, MANUAL

_J

I-1 inure 2. • Agent Transfer System Schematic

�L.V. THROTTLE(7
OH OFF SPRAY VALVE(?

L.V. FLOWMETER
U.V. FILTER

OISSEHIMATIOX (3 INCH LINE)

H.V. TfcROJJLE
VALVE

RECIRCUUTtON (3 »HCH LIME)

RECIRCULAT10H
SUCTIOi1 VALVEU.

Figure 3.

SUCTION (4 INCH LIKE)

Agent Transfer .System Power Module. Piping

�3.3.2

Pneumatic System

The pneumatic system generates, stores, and directs compressed
air for control of various system functions, as shown in Figure 4.
Compressed air is generated by a single 7.4-CFM .two-cylinder air
compressor, which is belt-driven by the Packette PE90-7 internal
Combustion engine. The compressor is:,equipped with a governor
and unloader assembly which allows the compressor to exit-out and
free-wheel after a preset air reservoir pressure has been reached.
When the air reservoir pressure drops below a certain level, the
air compressor automatically cuts back in, and supplies compressed
air. When free-wheeling, the compressor continues to cycle but
without compressing air. Normal range between cut-in and cut-out
pressure is 17-22 psig. The cut-out pressure is adjusted to
130 psig for use with the PWU-5/A MISS.
Compressed air is stored in two 1200-cubic-inch primary reservoirs
and a single 634-cubic-inch emergency dump reservoir. The emergency dump reservoir supplies air through a filter-regulator set
at 100 psig and 4-way solenoid valve to the emergency dump valves
on the tank modules. The emergency dump air reservoir is isolated
from the primary air reservoirs by a check valve so that the
emergency dump air supply cannot be depleted except by actuation
of the emergency dump system. The emergency dump air system can,
however, utilize the primary air supply when the emergency air
supply pressure falls below the primary air supply pressure. All
three air reservoirs are equipped with drain petcocks, and both
the primary and emergency air systems employ safety valves to
prevent excessive pressure build-up due to any system malfunction.
Both the primary and emergency air supplies are monitored by
individual pressure gages.
.
.
The primary air supply passes through a filter-regulator set at
60-30 psig and supplies air for the spray valve, eductor, wing
boom purge, and the wing boom nozzle diaphragm valve air pressure
regulator. Both the eductor and wing boom purge air supplies are
controlled with 2-way solenoid valves and are protected from spray
agent by check valves. Air supplied to the eductor creates a
vacuum in the agent transfer system piping for priming the centrifugal pump. The wing boom purge function allows air to pass
through the external aircraft plumbing and out of the spray
nozzles, purging agent from 'uhe wing booms. The nozzle diaphragm
valve air supply utilizes a regulator to maintain pressure at 40
psig and a 3-way solenoid valve to control air direction. Air is
supplied to the nozzle valves at all times when not spraying and
is exhausted when spraying.

11

�7.11-CFM
AIR
COMPRESSOR

8 x 26, PRIMARY .
RESERVOIR(I200 CU IN)

(O

DRAIN
EHERG. DUMP AIR
PRESSURE GAGE
OH-OFF
SPRAY
VALVE

100 PSIG

II-WAY

3/8

1/2

DUMP
SOLENOID
VALVE

^H DRAIN
-DUMP
RVOIR.
CU IN)

PSIG

U
©

60-80
.
f
I3/8
IAI
2-WAY

.

CS

r~"~
tQ
EDUCTOR

3/8

3/8

,
Jl«3/8
2-WAY

500-GAL \
*T\EM^
)
/

3/8

" '
W PSIG

REG H

3/8
C AA - r A 1

OUU'OAL. \ I
1
S
)

!

LEGEND

IAn

MM

P" J
EXHAUST -^—V-f*^-

/

"

WING

..- • -

!•

'• - .-: r:

BOOM

!

3/8

[$

^1

1^!

3/8

"IMMOM.

n-R'1 = FILTER-REGULATOR

3/8

Jl

i^V^''^ ^

= CiECK VALVE
3/8

= QUICK DISCONNECTS

r T = SAFETY AIR RELEASE VALVE
O !
Figure 4.

Pneumatic System Schematic
12

D

BB77irp
1

lr

U

3 WAY

1

= SOLENOID VALVE

g
[

•

APHRAGM
VALVEt
«»«.»fc\ TYP)

3/8

�3•3•3

Power Module Assembly

The power module assembly is the heart of the PWU-5/A MISS and
contains all necessary equipment to transfer, monitor, and
control the spray agsnt. The power module incorporates an agent
transfer system, pneumatic system, and electrical system. Figures
5, 6, 7, and 8 show the major power module components. The power
module assembly measures 51-1/4 inches from front to back by
60 inches wide by 51 inches high. Approximate dry weight is
2000 pounds.
3.3.3.1

Frame

The frame is a structural aluminum weldm-jut and has retractable
castors, lifting jacks, engine heat deflector, forklift slots,
belt guards, and tie-down eye bolts. The castors are held in the
extended or retracted position with captive ball-lock pins, and
the lifting jacks are used to raise or lower the front and back
sides of the power module when extending or retracting the castors.
The entire frame is coated with heavy-duty industrial epoxy paint.
3.3.3.2

Engine

The engine is 110-hp piston-driven, air-cooled, four-cylinder,
four-stroke gasoline engine. It is a PE90-7 Packett engine produceby Continental Motors Corporation, FSN 2805-633-6689, and is currently in the Air Force inventory as the power source for several
types of ground support equipment.
To drive the pump and air compressor, a 0.75:1 reduction gear
housing (FSN 2805-960-1916) is used. This provides a single pad
power take-off to which a splined stub shaft is attached with an
outboard bearing to support the main drive pulleys. Two sets of
four each 3V belts drive the pump; a single 3V belt drives the
air compressor.
On the opposite end of the engine from the power take-off, a loadsensing governor and a 28V, 50-ampere generator are mounted or.
power take-off pads provided for them.
The dual exhaust pipes are manifold into a single pipe exhausting
upwards. A commercial spark arrester is mounted to the exhaust
pipe. Gasoline is supplied to the engine by a separate tcink and
connected with drip tight quick-disconnect fittings.
3.3.3.3

Centrifugal Pump

The centrifugal pump is a 316 stainless steel chemical process
pump with TFE mechanical seals. It is constructed to AVS size
A70 envelope with a 10.0-inch casing and a 9.5-inch open impeller.
The suction port is 4.0-inch diameter and discharge is 3.0-inch

13
(The reverse of this page is blank.)

�HIGH VOLUME FLOWMETER
LOW VOLUME STRAINER
LOW VOLUME FLO*M£TER
EDUCTOft AN!) W I N G BOOM PURGE
A I R R r OULATOR
LOW VOLUME fHROHLE —
— WING BOOM N07ZUE &lt;ALVE
A I S REGULATOR

HIGH VOLUME.
THROTTLE

CONTROL PANEL

3 INCH
D l S S E M I N A i ION

KECIRCULATION v A L &lt;

2 INCH
RECIRCULATION

U INCH
SUCTION

PUMP CASING D R A I N

JACK
POWER PRAIN

Figure 5.

Power Module Assembly
(Front View)

�24 VDC B A K E R Y

EXHAUST STACK

SPARK ASREST
3 IHCH
OlSSEMtHATil

EM£&lt;if,?NCV DUMP
AIR RESERVOIR

PE90-7 E K O I N i

Alk

E M f S G E H C Y DUMP A I R

HLTER/REGULAIOR
A I R RESESVOIS

JACK

Figure 6.

AUK MODULE ELECTRICAL A
PNEUMATIC CONNECTIONS

Power Module Assembly
(Back View)

15

(The rcvcvso of this [lago is l&gt;l;ink)

�-EDUCTOR AIR

RUER/REGULATOR

2&lt;*-VDC BATTERY
EXHAUST STACK

EDUCTOR

3 INCH
DISSEMINATION
28-VDC G E N E R A T O R

3 INCH
RECIRCULATION
INCH
SUCTION

AIR

W I N G BOOH
CONNECTIONS

FUEL LINE -

Figure 7.

A I R RESERVOIR

Power Module Assembly
(Left View)

�3 INCH DISSEMINATION LINE
WING BOOM AIR CONNECTION
2i»-VOC BATTERY —

WING BOOM
NOZ/LE YHVE
A I R REGULATOR
EMERGENCY
DUMP
RESERVOIR
PE30-7Q EN
CONTROL BOX

BE
:£NSiONEi&lt;

PUMP PUUEY
(8 GROOVE)
COMPSESSOR

PUMP BELT TENSIONER
(8 GROOVE)
—

AIR RESERVOIR

Figure 8.

Power Module Assembly
(Right View)

17
(The reverse of tliis i&gt;age is blank)

�diameter; both ports are fitted with ASA 150-pound drilled flanges.
The casing has a 3/8-inch drain port. Pump bearings are oil lubricated, and the mechanical seals are pressure lubricated with a
spring-type grease cup. The pump is designed to handle slurries
and highly viscous agents as well as highly corrosive chemicals.

3.3.3.4 Air Compressor and Air Tanks
The air compressor is a reciprocating, power-driven, air-cooled,
self- lubricated design used as a source of compressed air in the
air brake system of military and commercial wheeled vehicles.
Its rated delivery is 7.4 CFM of free air at 100 psig nominal.
The compressor is belt-driven off the engine power take-off shaft.
A pressure unloader allows the compressor to free-wheel when the
air tanks have been pressurized to 130 psig and cuts t;»e compressor
back into the system when the pressure falls to approximately 90
psig.
The air tanks are cylindrical in shape and are secured to the
power module with strap brackets.
3.3.3.5

Agent Valves

The 3-inch and 4-inch-ciiameter butterfly valves are aluminum
body with TFE sleeves and seals and 316 stainless discs. The
butterfly valves are gearwheel, lever, and pneumatically actuated.
The low volume spray throttle valve is a TFE diaphragm/stainiess
steel valve.
3.3.3.6

Piping

3-inch, and 4-inch-diameter pipi-n9 is 304 stainless and a conbanation of, schedule 5 pipe and 0.065-inch wall tubing. All piping
is welded and passivated. Piping connections are made with corrosion weight flanges, sanitary fittings, or quick disconnect fittinc
(used for ground support hose connections) . The low volume spray
system is 1-inch, schedule 40, 304 stainless screwed pipe.
3.3.3.7

Solenoid Valves

The solenoid air valves are commercial 24 Vdc brass.
3.3.3.8

Pneumatic Actuator

The pneumatic actuator on the main spray valve is an alaminum
body, twin piston-type actuator.
3.3.3.9

Eductor

The eductor is 304 stainless and obtains a maximum suction of 27
inches of mercury at 80 psig input air pressure. Air consumption at 80 psig is about 11.4 SCFM. At 60 psig, air consumption
is 9.0 SCFM, and a suction of 25 inches of mercury is ojtained.
19

�3.3.3.10

Flowmeters

Two flowmeters are used: 3-inch-diameter high volume (up to 600
gpia). and 1-inch-diameter low volume (2.5 to 6D gpm). The meters
are turbine-type, constructed of stainless steel with carbide
bearings. (The prototype MISS flowmeters were supplied with TFE
bearings due to the unavailability of carbide.) The meters are
fitted with ASA ISO-pound drilled flanges.
3.3*4

Tank Module Assembly

The tank module assembly i** shown in Figures 9 and 10. The
assembly measures 48 inches wide by 72, inches long by 64 inches
high and weighs approximately 670 pounds dry. Agent capacity is
500 gallons.
3.3.4.1

Tank

The tank is constructed of 14-gage 304 stainless steel. The tank
ends are ASME low crown flanged and dished heads. Access into
the tank is through a 10-inch by 19-inch manhole in the tank top.
The manhole cover has a fill cap, cup-type strainer under the
fill cap, liquid level transmitter assembly and 2-inch pipe vent
line. Agent slosh is controlled by a single vertical internal
baffle of perforated sheet, which covers the lower half of the
tank and is curved for strength. One tank end has three 3/4-inch14 NPT plugged openings to provide for possible instrumentation
during testing. Two of these openings were used for a visual
liquid level indicator designed for water testing only, since the
indicator materials are not agent compatible. Two 4-inch agent
pick-up pipes are provided on the bottom of the tank, one at each
end. Attached to these pipes with sanitary fittings are 90°,
4-inch elbows. A 4-inch dump valve is located on one lower end
of the tank.
3.3.4.2

Cradle

The cradle is a weldment of structural aluminum, coated with
heavy duty industrial epoxy paint, and secures the tank with two
band straps. Castors are provided on each corner of the cradle,
retained with ball-lock pins, and can be easily extended or
retracted after lifting the end oi" the tank module assembly with
the captive jacks provided. Forklift tubes are located on the
cradle side. Eye bolt tie-downs are located at each cradle
corner.
3.3.4.3

Electrical Junction Box

The electrical junction box is secured to the top of one forklift
tube. Extending from the electrical junction box is a cable
which connects to either an adjacent tank or the power module, es
shown in Fidure 11.

20

�LIQUID LEVEL TRANSMITTER/
FL.OAT ASSEMBLY

MOTOR-DRIVE* VEKT VALVE

FUt CAP

MANHOLE

LIQUID LEVEL

, INDICATOR
(FOR WATER TESTS
ONLY)

3/t PIPE
HALF-COUPLING

HOLD-DOWN
STRAPS

H INCH DIAMETER
90 ELBOW
*GEHT LI "

JACK

CASTOP

AIRLINE CONNECTIONS

ELECTRICAL CABLE
COKNECTOP,
ELECTRICAL ,
JUNCTION BOX

Figure 9.

Tank Module Assembly
(Side View)

21

�MOTOR-DRIVEN VENT VALVE
2 INCH DIAMETER VENT LINE

VENT VALV? __
ELECTRICAL CABLE
UMP VALVE WITH
PNEUMATIC ACTUATOR

IMNCH DIAMETER
90 ELBOW
AGENT LINE
DUMP AIRLINE

ELECTRICAL CABLE
DUMP A I R L I N E CONNECTIONS

Figure 10.

Tank Module Assembly
(End View)

22

�0UMP PQRT
ELECTRICAL
JUNCTION BOX

rj

i
i
*
v

ELECTRICAL JUNCTION
BOX CABLE

POWER
MODULE

I

i
i
i
)

FRONT

TANK MODULE ( T Y P )

Fiauro 11.

Tank Module Assembly Electrical Cable Conne -t

�3.3.4.4

Dump Valve

The dump valve, located at the bottom of one tank end, is a 4-inch
butterfly with TFE sleeve, 316 stainless disc, and aluminum body.
The valve is actuated by a twin-piston pneumatic actuator, which
is equipped with a handle for manual operation. The actuator uses
air to open and close the valve and; therefore, air pressure must
be relieved before manual valve operation is possible. The dump
valve air lines are connected in exactly the same sequence as the
electrical junction box cable (Figure 11). The air lines on the
tank module nearest the power module are connected to the power
module, the next outermost tank module air lines are connected
to the tank nearest the power module, etc. The two dump valve
air lines are different sizes, eliminating the possibility of
incorrect connection.
3.3.4*5

Vent Valve

The vent valve is a 2-inch brass ball valve with TFE seats. It
is driven with a 28-Vdc motor actuator which provides feedback
to the power module control panel to indicate vhether the valve
is open or closed.
3.3.4.6

Fill Cap and Strainer

The fill cap is 304 stainless with a fluorosilicone gasket. It
is spring-loaded and will seal up to about 15 psig internal tank
pressure. Located below the fill cap is a removable stainless
steel strainer to filter out foreign matter if agent is poured
directly into the tank.
3.3.4.7

Liquid Level Float/Transmitter Assembly

- -

The liquid level transmitter is a sealed resistive-type level
indicator made of nickel-plated brass, stainless steel, and TFE.
It is bolted to the manhole cover and suppor^c'd at the bottom of
the tank by a short vertical tube which forms a slip-joint. This
method of connection allows the tank to expand and contract due
to temperature changes, etc., without damaging the float assembly.
When the float reaches the top of its travel during ground filling,
it trips an internal switch which closes the tanks vent valve,
preventing agent from being pumped through the vent line. When
all tanks in any size PWU-5/A MISS have been filled in this
manner, the power module engine magneto is grounded, stopping the
engine to prevent overpressurization of the tanks.
3.3.5

Power Module Controls and Instrumentation

The power module control panel is shown in Figure 12. It contains
all instrumentation and remote controls for the PWU-5/A MISS. All
indicator lights are the press-to-test type and can be dimmed by

24

�AGENT PRESSURE
AND TEMPERATURE
VENT VALVE INDICATORS
— AND CONTROL
OPERATOR
EMERGENCY DUMP
SWITCH

AGENT
LEVti
SYSTEM

FLOWMETER
ELECTRONICS

R RESERVOR
PRESSURE

,,.

OPERATOR—
SPRAY SWITCH

•NGINE CONTROLS

r"!7,«AS,- -.'i-vw.c-- *i!:-^V*"*VfJIl-;_&gt;4

CIRCUIT BREAKERS
"(COVER OPENED)

Figure 12.

Control Panel

25

�rotating. The control panel is hinged for easy access to the
control box immediately behind the control panel. The control
box contains the majority of the system's electrical equipment.
3.3.5.1 Agent Temperature and Pressure

.

The agjent temperature and pressure gages are located at the upper
left-hand corner of the control panel. Agent pressure is read
•'at.the centrifugal pump output and agent temperature at the pump
intake.
3.3.5.2 Air Pressure
Two air pressure gages are located below the agent temperature
antf pressure gages. The upper gage reads the air pressure in the
emergency dump reservoir, and the lower gage reads the pressure
in the primary air reservoirs.
3.3.5.3 Number of Tanks
The switch at _the top center of the control panel is used to set
the system for the total number of tanks in the system. For all
systems (2, 4, 6, or 8 tanks) except the C-47, the tanks are
located symmetrically about the power module. The C-47 MISS
installation uses two tanks both on the same side of the power
module and therefore requires a special switch position.
3.3.5.4 Vent Valves
Figure 13 shows the vent valve control display and how it relates
to the MISS tank placement. The switches marked "End Tank Left"
and "End Tank Rinht" are used to set the system electronics for
the correct end tank. For a two-tank symmetrical system, the
switches would be set at 1 and 2; for a four-tank system, they
would be set at 3 and 4, etc. The C-47 has special switch
positions because it is not a symmetrical system.
The vent valve switch in the center of the vent valve panel opens
and closes all tank vert valves simultaneously. Each tank has
indicators to display whether its vent Valve is open or closed.
Red lights indicate open, and green lights indicate closed.
3.3.5.5

Dump

The dump switch opens all tank vent valves and dump valves,
simultaneously. This switch is in parallel with the pilot's dump
switch so that either the operator or pilot can start and stop
the dump sequence. (The same switch must be used to both start
and stop the dump operation.)

26

�LEFT

-&lt;-

•&gt;-

RIGHT

i
POWER

7

5

3

2

1

4

6

MODULE

•

i .....i
.....

^x

FRONT

I— TWK MODULES

NUMBER OF TANKS
6

to
-j

OPEN

OPEN

O O

©

© ©
5
3
CLOSED

V*LVES

©

©
2

©
4

O

O

©
©
TV
&gt;
CLOSEO \

END UKK RI'SHT

S W I T C H OPENS/CLOSES ALL
VENT VALVES SIMULTANEOUSLY

INDICATOR LIGHTS
OPEN - RED
CLOSED - GREEN

Figure 13.

Vent Valve Control Schematic

8

�3.3.5.6

r 11

The fill switch opens all tank vent valves for ground filling
using the power module suction fill function. As each tank is •
filled, its vent valve automatically closes. When all tanks are
filled, the engine magneto is grounded, stopping the engine and
preventing overfilling the tanks. Turning the fill switch off
allows the engine to be restarted. If the tanks are not filled
full v?hen ground filling is terminated, turning off the fill
switch will close all tank vent valves.
3.3.5.7

Pump Prime

The pump prime switch supplies air from the primary air reservoirs
to the eductor for priming the pump when the system is dry and
opens the end tank vent valves to allow venting of the eductor
exhaust air through the recirculation line and the end tank

vent's..' 3.3.5.8

•••

- ...'..

. ,:.

..

Air Purge

The air purge switch supplies air from the primary air reservoirs
to the 3-inch dissemination line just after the main on-off spray
valve. The air purge switch will not function unless the main
on-off spray valve is closed, preventing the possibility of
blowing air back through the system and into the tanks.
3.3.5.9

Drain

The drain switch opens the end tank vent valves only.
sequential draining of the tank modules.
3.3.5.10

Agent Capacity System

........

?. . . . . . .

^.

This allows
;

The agent capacity system includes a twin opposed needle indicator
with each needle reading 0-500 gallons, and a four-position selector switch marked 1-2, 3-4, 5-6, 7-8. With the selector switch in
the 1-2 position, the agent capacity of tank number 1 is displayed
on the left needle indicator and number 2 tank agent capacity is
displayed on the right needle indicator. In the same manner, the
agent level in tanks 3 through 8 can be read. If a tank is
selected which is not in the given system (i.e., tank No. 6 in a
two-'fahk system), the indicator needle will pin off scale, above
the full mark.
3.3.5.11

Spray

The spray switch opens the end tank vent valves and the on-off
main spray valve (3-inch butterfly) simultaneously, allowing the
tanks to empty sequentially from the end tanks to the innermost
tanks (both sides of the power module simultaneously). The

28

�operator spray switch is in series with the pilot's spray switch
s&gt;o that both switches must be thrown to initiate spraying, but
eitbtsr the operator or pilot can terminate spraying. Two indicator: lights next to the spray switch indicate if the pilot's or
operator's spray switch is on.
3.3.5.12 Main Powei:
The main power switch supplies power to all system functions and
is also a circuit breaker. All subcircuits are individually
protected with circuit breakers, and an indicator light illuminates
if any circuit breaker is activated to the OFF position. A hinged
panel provides circuit breaker access.
3.3.5.13 Engine Controls
Engine- controls include a start button, ignition switch (magneto
ground), throttle, and choke. The choke and throttle levers are
the push-pull type. Pulling the choke lever activates the choke;
the throttle lever is pulled to decrease throttle and. pushed in
to increase throttle. Rotating the throttle lever clockwise will
lock it in a given setting. The engine tachometer is located
above the engine controls.
3.3.5.14 Engine Instruments
A twin needle indicator displays oil and engine head temperature.
The hourmeter indicates elapsed operation time. The ammeter shows
battery charging or discharging rate, and the oil pressure gage
indicates engine oil pressure.
-3.3.5;. 15 Panel Illumination Lights

*. ... ,

Two flexible goose-neck panel lights are provided. These lights
may be positioned as desired, include dimming devices, and can be
adjusted to illuminate with either white light for day flying or
red light for night flying.
3.3.6 -Pilot Controls
Pilot controls are shown in Figure 14. Switches for spraying and
dump are provided. A dump indicator illuminates if either the
pilot or operator activates the function. Separate indicators
for the pilot and operator are provided with the spray switch.
The indicators are the press-to-test type and can be dimmed by
rotating them. The pilot control box is connected to the power
module control box with an electrical cable.

29

�PILOT'S CONTROL BOX

Figure 14.

Pilot Controls

30

�3.3.7

Electrical System

The main electrical power system consists of a 28-volt lead-acid
aircraft battery, 50-ampere - 28.5-volt direct current generator
powered by the PE90-7 engine, a carbon pile voltage regulator,
and a reverse current relay. All secondary electrical systems
are individually protected with circuit breakers.
A detailed explanation of the complete PWU-5/A MISS electrical
system is presente-i in Appendix I of this report. •
3.3.8

Emergency Dump System

The emergency dump system allows one-half the agent payload to be
jettisoned overboard in less than 45 seconds. Each tank dump
valve output is manifolded into a 10-inch-diameter duct which
extends through ah aft jump door. A single 10-inch dump line can
handle up to four tanks; larger systems require two dump lines.
The ducting is silicone-coated glass fiber, and fittings are
stainless steel.
3.3.9

Tank Vent System

The complete MISS is sealed to prevent leakage of agent or agent
vapors inside the aircraft. To accomplish this, the 2-inchdiameter tank vent hoses are manjfolded into a 3-inch vent line
and routed out a rear jump door. Each 3-inch line will handle
four tanks; larger systems use two 3-inch vent lines. At the
jump door the 3-inch vent line chute is positioned so the airstream causes slight ram-air pressurization of the tanks, decreasing emergency dump time. All vent line ducting is siliconecoated glass fiber, and all fittings are stainless steel.
3.3.10

Internal/External Aircraft Plumbing

Ayent suction lines are 4-inch-diameter flexible hose. The first
MISS prototypes were supplied with a vinyl interim hose which
should not be used with agents containing aromatic hydrocarbons.
A stainless steel suction hose, which is compatible with all MISS
agents, is specified with the system.
Recirculation and spray hoses are 3-inch-diameter- cross-linked
polyethylene-lined pressure hoses rated at 150 psig working pressure. All suction and pressure hoses are sanitary^type couplings.
Each aircraft used with the PWU-5/A MISS requires certa:.n custom
fittings to route the spray hose out the jump door to the wing
booms. For complete information regarding internal/external
plumbing for a specified aircraft, consult the PWU-5/A Modular
Internal Spray System, Class II modification documentation for
that aircraft.

31

�3.3.11 Wing Boom System
The wing boom is a 2-inch stainless pipe streamlined with an aft
fairing. Standard wing boom lengths are 8 feet and 4 feet. Variations of shape and length are required on certain aircraft.
Sections are joined with flexible connectors, which allow angular
movement but restrain axial movement and rotation.
Nozzle stations are located every two feet along the boom. Air- ...
assisted diaphragm nozzle valves are used at each nozzle station
to insure positive termination of spraying and prevent agent
leakage through the nozzles when not spraying. A pneumatic line
is located inside the boom fairing to supply air pressure to the
nozzle shut-off valves.
Two size stainless steel nozzles are used: 1/2-inch high capacity
nozzle rated at 7.5 gpm/nozzle at 10 psig to 23.7 gpm/nozzle at
100 psig; 1/4-inch low volume nozzle rated at0.10 gpm/nozzle at
10 psig to 0.32 gpm/nozzle at 100 psig.
The booms are positioned underneath the wing and secured by struts
and bonded mounting plates (bonded to the wing with aerospace
adhesive).
3.3.12

Ground Support Equipment

Ground support equipment consists of:
•

50-foot, 2-inch-diameter suction/pressure hose

•

50-foot, 1-inch-diameter pressure hose

•

55-gallon drum suction probe'assembly

•

Tank washing probe

•

Aircraft washing gun

•

Adaptor fittings.

The 2-inch hose is used for suction filling or power draining.
Attaching the drum suction probe assembly allows suction filling
directly from 5r-gallon drums. The 1-inch hose may be either
connected directly to the power module or to the end of the 50foot, 2-inch hose. The tank-washing probe includes a spherical
spray head to wash down all internal tank surfaces when cleaning
the system and is inserted through the tank fill cap opening.
The aircraft washing gun has a variable spray which may be
changed from a jet stream, cone spray, or shut off according to
the gun's trigger position

32

�SECTION IV
SYSTEM DEVELOPMENT

Tithe following sections of this report present the development
sequence of all FWp-5/A MISS hardware plus discussions of design
criteria such as aircraft characteristics, chemical agents, and
field operations.
•
..,„. . „„...
, - -r..^4.1

AIRCRAFT CONSIDERATIONS

The PWU-5/A Modular Internal Spray System has been designed for
use on a wide variety of cargo-type aircraft: C-46D, C-47D,
C-54G,, C-97G, C-118A, C-119G, C-121G, C-I23K, C-13QE, and C-131E.
Some of these aircraft date back to the late 1930's while others
are modern-day sophisticated transports capable of carrying up to
45,00.0 pounds of cargo. This wide range of aircraft technology
required extensive investigations to insure that suitable system/
aircraft combinations resulted. The aircraft were divided into
two groups: primary and secondary. The primary aircraft are the
C-47D, C-54G, C-123K. and C-130E;'other aircraft are termed as
secondary. Some specific aircraft characteristics are shown in
Table II.
The aircraft design considerations included aircraft compatibiliL ,
modifications required, installation and removal restraints, aircraft contamination, and spray performance. These subjects are
discussed in the following sections to show the restraints placed
on the design and to show how the design satisfies the restraints:.
4.1.1

Aircraft Compatibility
.

1

.

'

•••••*

'-

'

'

'
'

To determine aircraft compatibility, several requirements v.'ere
established. These requirements include:
•

Using full aircraft payload capacity

•

Attention to floor load limits

•

Attention to center of gravity

•

Fitment in allowable cargo-space

•

Attention to tie-down requirements

•

Permitting access to emergency exits

•

Permitting access to service points

•

Withstanding airborne environments.

33

�TABLE II.

(

AIRCRAFT CHARACTERISTICS

PRIMARY AIRCRAFT

SECONDARY AIRCRAFT

C-470

C-54G

C-123K

C-13QE

C-97G

C-460

C-HB*

C-1196

C-121G

C-131E

SPAN

FT

95,0

117.5

MO.O

132.6

108.0

141.3

1 17. 5

109.3

123.0

K&gt;5.7

LENGTH

FT

6t}. 5

93.9

75.8

97.7

76.3

110.3

106. 9

86.5

113.6

79.,'

HEIGHT

FT

16.9

27.5

34. 1

38.0

21.8

38.3

28.4

26.3

24.8

27.8

2

4

2

4

2

4

4

2

4

290

200

326

260

310

329

242

295

2
295

167

IIH

291

129

200

229

146

212

170

ENGINES
MAUMUM SPEED

KNOTS

221

CRUISE SPEED

KNOTS

142

-

OPERATING WEIGHT

LB

20,000

MO, 000

39,100

71,500

31,000

92,500

60,000

45,000

110,000

38,000

LOADED WEIGHT

L8

33,000

73,000

60,000

153.000

61,900

169,000

112.000

72,700

145,000

60,500

LB

9.000

24,000

13.000

45,000

16,000

40,000

20,000

30,000

18,500

M A I N CARGO DOOR

• • •

SIDE

SIDE

REAR

REAR

SIDE

REAR

SIDE

REAR

SIDE

SIDE

DOOR HEIGHT

IN.

55-70

67

ICO

109

55.5-78.5

78

78

96

DOOR W! CTri

IN.

84

95

no

123

95.5

73

124

CO

74
112

72
120

HEIGHT

IN.

80

80

98 '

109

80

86

93

92

WIDTH

IN.

79

103

98- 1 10

123

109

88-107

104

110

80
120

LENGTH

IN.

270

420

444

492

510

764

816

443

984

79
93.6
554

MAX.

PSF

200

200

200

1080

185

200

200

200

300

300

' M A X . PAYLOAD

CAR30

30,000

COMPARTMENT:

FLOOR LOAD

' N O T E : PAYLOADS SHOWN ARE MAXIMUM FOR MISSIONS U T I L I Z I N G THE PWU-5/A MISS.

�Since the PWU-5/A .MISS must be capable of use on a wide variety
of aircraft with cargo capacities varying from 9,000 pounds to
45,000 pounds, several trade-offs were made resulting in the fin. :
system. The system is able to satisfy the requirements of the
large aircraft, and by rearranging the modules and connective
plumbing and reducing the number of tank modules, the system is
made compatible with other aircraft.
Parameters of the various aircraft/system combinations are shown
in Table III. The weights and payload efficiencies do not includ&lt;&gt;
the weight of connective plumbing and booms. It is seen that the
payload efficiency (without plumbing) is high, varying from 95
percent to 67 percent. For those aircraft which are payload
limited, the PWU-5/A MISS utilizes nearly 100 percent of the aircraft payload capac.ity when the internal and external plumbing
are included.
Since the system moduL..- must be interchangeable, the most extreme
environmental factors of the group of aircraft were considered.
These f actors,_ which were established as design goals, are presented in Table IV. Load factors were determined to meet the
requirements of the applicable Air Force technical orders for
normal and crash conditions. Aircraft attitude angles determined
the amount of center of gravity control which must be provided by
the PWU-5/A MISS. Altitude and temperature ranges were determine '
to aid in the design of system components. A design dynamic
pressure was established for the determination of maximum air
loads on external components.
Specific module layouts for the various aircraft arc discussed
below. Particular attention was given to satisfyinq floor loadin
compartment loading, and center of gravity requirements while
exploiting maximum possible payload capacities.
'•
.....
•;
-1
4.1.1.1 Primary Aircraft
•

C-47D

The module layout for the C-47D is presented in Figure 15. Tvo.
tank modules and ono power module are shown. The fuselage is
divided into compartments along its length. Each compartment hn:
a weight capacity independent of other compartments.
Center of gravity conditions were satisfied assuming a basic aircraft, crew, and fuel e.g. at the forward aircraft e.g. limit.
The modules were then positioned such that the aircraft e.g.
remained within limits. These e.g. requirements limited the load
of the aft tank. The forward portion of the main cargo door is
removed for routing of connective plumbing.

35

�TABLE III.

AIRCRAFT/SYSTEM PARAMETERS

T A N K MODULE W E I G H T : 653 POUNDS EMPTY

AIRCRAFT

POWER MODULE WEIGHT:

AGENT (T)
CAPACITY (GAL.)

NUMBER
TANK MODULES

MODULAR©
WEIGHT (POUNDS)

PAYLOAD©
EFFICIENCY

2.0SO POUNDS

LI. Ml TING FACTOR

C-U6D

t4

9%

12,982

0.81

CCVPftRTKENT LOAD

C-i«7D

2

i466

7,250

0.81

CENTER OF
GRAVITY

C-5^G

U

1,925

20,738

0.86

LATERAL
RESTRAINT

C-97G

8

3 ,W

36,U50

0.91

PAYLOAD

C-118A

6

2,592

27,598

0.92

PAYLOAD

C-119G

i4

1,72*4 -

19,050

0.95

PAYLOAD

C-121G

6

2,592

27,598

0.92

PAYLOAD

C-123K

2

992

11,712

0.90

PAYLOAD

C-130E

0;

3,9fc8

140,698

0.90

PAYLOAD

C-131E

k

932

12.U50

0.67

COMPARTMENT LOAD

\

NOTES:
Q
SPECIFIC G R A V I T Y 1.0
©

INCLUDING POWER MODULE, TANK MODULES. W I T H S.G = 1.0 AGENT, EXCLUDING CONNECTIVE PLUMBING, WING BOOHS, ETC.

©

R A T I O OF MODULAR WEIGHT TO MAXIMUM A I R C R A F T PAYLOAD.

�TAM.K IV.

I)

ENVIRONMENTAL FACTOHS

LOAD FACTORS
KORKU
FORWARD

3.0 9

6.0 g

AFT

3.0 g

1.5 g

UP

3.0 g

2.0 g

DOWN

i».5 g

9.5 g

SI OF
2)

CRASH

1.5 g

t.b g

AIRCRAFT ATTITUDE FOR C.G. CONTROL
PITCH * 30*
ROLL
i 60"

ALTITUDE
CRUISE:
SPRAY.
4)

0 FEET TO 20.000 FEET - MEAN SEA LEVEL
0 FEET TO 10,000 FEET - MEAN SEA LEVEL

DESIGN DYNAMIC PRESSURE
400 KTAS AT SEA LEVEL
= r,m» psr
TEMPERATURE

STORAGE
(WITHOUT AGENT)

-65"F TO H65°F

INSTALLED WITH AGENT

-65"F TO +IUCTF (OUTSIDE)
•»20'F TO +I"»0"F (INSIDE)

SPRAYING

+WF TO

37

�TOT»L
3000

C TY ( C A L . S.G. 1.0)

22CO

231

i xEIC-HT (L3)

185

E
3000

3000

L I M I T (L8)

7250

2050

O
17
INCHES

.10 INCHES

•NS-V5-:-:
I^ISScf^

FrfD

INCHES

oo

f
22.5 JNCHES

U.5 INCHES

FULL

'ALLOrfASLE PAYLOAD C. G.

FULL

ACTUAL PAYLOAO f.G.

'ALLOWABLE PAYLOW c.t.

&lt;////.

*///////////A

EMPTY

EMPTY

ACTUAL fAYLOAO C. G.

•BASED ON ASSUMPTION THAT BASIC

AIRCRAFT C.G. (iHCL. fUEl AHO
CREW) IS AT THE FWO C.G. LIMIT.

Figure 15.

C-47D Floor Plan

�Tie-down of modules should be in accordance with the cargo load inT.O.'s of.the applicable C-47 model. Due to extreme variance of
tie-down locations and strengths between C-47 models, no simile
tie-down procedure is applicable.
•

C-54G

The 4-tank module layout proposed for the C-54G is presented in
Figure 16. The versatility of the modules, necessary to maximize
payload capabilities, may be seen in this layout. The modules
are oriented crosswise in the cargo compartment in order to
satisfy center-of-gravity requirements. The two end tanks will
empty first, and the two center tanks will empty l?..it. The forward portion of the aft cargo door will be removed to provide
the opening for connective plumbing.
Due to restraint capability of the cargo tie-downs, the forward
tank must be limited to a total weight of 4332 pounds. In addition, it is required to directly bolt the cradles to floor
fittings and to use several tie-down brackets to maximize the
available restraint. Table V presents the recommended tie-down
scheme. The tie-down fitting number is composed of the compartment, ths row (from left to right), the type fitting (primarily
used for engine tie-down or general cargo), and the numerical
position (from forward) of the fitting in the particular compartment row.
•

C-123K

The module layout for the C-123K is presented in Figure 17. 'iVo
tank modules and a power module are used, and the small c.n. banu
requirements are satisfied by this arrangement as shown. The
tanks empty simultaneously.
Cargo tie-down fittings are adequate, passageways are sufficient,
and the forward bail-out chute is not obstructed. Floor and
compartment loading requirements are satisfied. The two aft jump
doors are removed to provide openings for connective plumbing.
Tie-down details are presented in Table VI; fitting' nomenclature
is standard to tho aircraft.
•

C-130E

The module layout for the C-130E is presented in Figure 18. The
full capacity eight-rank system is shown. The module layout
satisfies e.g., floor loading, and compartment loading requirements, and the jump doors provide openings for connective plumbin
Tic-down details are presented in Table VII. Fitting ncmer.~l.alur.
is standard to tho aircraft. For the prototype tent system, a
four-tank assembly was designed and fabricated.

39

�,L,GH,- (is)

•Cm
20,, 7 23

3050

U776
C A P A C I T Y (GAL. S.G. 1.0)

r

U35

U36

U925

COMPARTMENT,
(capacity)

(WOO)

EMPTYING
SEQUENCE

(H300)

(WOO)

(WOO)

' (H800)

o
f"- 12 INCHES

O
—*i

«-12
INCHES

}*— 12 INCHES
tj.-r 7&gt;,

FKO

16 INCHES

•ALLOWABLE PAY LOAD C.G.
ACTUAL PAYLOAD C.G.

IS////,'/*

FULL

®

FULL

•ALLOWABLE PAYLOAD C.G.

^77777777/////r//r//////7//77//////7/7/\

ACTUAL PAYLOAD C.G.

Q

EMPTY

EMPTY
'BASED OH ASSUMPTION THAT BASIC
VIRCRAFT C.G.i(H*CL. FUEL AND
CREW) IS AT THE FWO C.G. LIMIT.
NO T.O. DATA

Figure 16.

C-54G Floor Plan

�TABLE V.

MODULE
I
(HOST AFT)

TIE-DOWN
FITTING NO.

C-54G TIE-DOWN DETAILS

TIE-DOWN DEVICE
QTY
SIZE
1

6-A-C-3
H-A-t-J

l

12 50
t

ATTACHMENT POINT
LEFT AFT CORNER

H-B-C-I
H-C-C-I

LEFT AFT CORNER
RIGHT AFT CORNER

H-D-C-I
H-E-C-I

RIGHT AFT CORKER

fl-F-C-3
H-F-C-I
6-B-C-l

i

I

12 50
BOLT

0-6-E-l

RIGHT AFT CORNER
RIGHT AFT CORNER
THROUGH CRADLE
i

G-.6-C-?
G-B-E-2
G-B-C-3
G-C-C-I
G-C-C-2
G-C-C-3
G-D-C-I
6-0-E-l
G-D-t-2 ,
G-O-t-2
G-D-C--3
G-E-C-I
G-E-E-I
6-E-C-2
i

G-E-E-2

1

G-E-C-3
2

BOLT

THROUGH CRADLE

F-A-C-I

1250

LEFT FWD CORNER

F-A-C-2

i i

LEFT FWD CORNER

f-A-'.-3

LEFT AFT CORNER

G-A-C-I

LEFT AFT CORNER

G-A-C-2

LEFT AFT CORNER

F-B-C-I

RIGHT FWD CORNER

F-C-C-I
F-O-C-I

RIGHT FWD COftlER
LEFT FWO CORNER

F-E-C-I
F-F-C-I
F-F-C-2

LEFT FWD CORNER
\

(

l

RIGHT FHO CORNER

1250

RIGHT FHO CO&lt;HER

41

�TABLF V.

; mm
2
(CONTINUED)

(CONTINUED)

TIE-DOWN DEVICE

TIE-DOWN
F I T T I N G NO.

QTY

SIZE

F-F-C-3

1

1250

I

ATTACHMENT POINT
RIGHT AFT CORNER

, G-F-C-I
G-F-C-2

1250

RIGHT AFT CORNER
RfGHT AFT CORNER

F-8-E-I

BOLT

THROUGH CRADLE

F-8-C-2
F-l-C-3

t

\

i

F-C-C-2
F-C-C-3
F-O-E-I
F-D-C-2
F-D-E-2
F-D-C-3
F-D-E-3
F-E-E-1
F-E-C-2
F-E-C-3
POWER MODULE

BOLT

THROUGH CRADLE

E-A-C-2

1250

LEFT FWD CORNER

!

E-A-C-3

LEfT AFT CORNER

1

E-F-C-2
' •'

RI-1HT FWD CORNER

E-F-C-3

1250

RIGHT AFT CORNER

E-C-C-I
E-C-C-2

BOLT

THROUGH CRADLE

I \

E-C-C-3
E-D-C-I
E-O-E-I
E-O-C-2

I
f

E-O-E-2
1

E-O-C-3
E-D-E-3
3

t
BOLT

D-A-C-2
D-A-C-3

'
THPfHlfiK C8imF

E-A-C-I
E-8-C-I

LCFT
LEFT
LEFT
LEFT

D-F-C-2

RIGHT AFT CORKER

1250
j 1

AFT
AFT
AFT
AFT

CORNER
CORNER
CORNER
CORNER

D-F-C-3
E-F-C-I
E-E-C-I
D-B-C-I

1 '

t
1

t

1250

SIGHT AFT CORNER

BOLT

THRJUGM CRADLE

42

�V.

MODULE
3
(CONTINUED)

TIE-POWN
F I T T I N G f'O.

(CONCLUDED)

TIE-DOWN DEVICE

QTV

D-8-C-2

ATTACHMENT POINT

SIZE
BOLT

THROUGH CRADLE

BOLT
TIE DOWN
BRACKET
BOLT

THROUGH CRADLE

D-6-E-I
D-fl-C-3
0-B-E-C
D-C-C-I
D-C-C-2

t

AFT CRADLE
THROUGH CRADLE

I

i

D-C-C.J
D-O-C-;
-

D-D-C-2
D-O-E-I

. 1

D-O-C-3
0-1/-E-2

MLT
TIE DOWN
BRACKET
BOLT

BOLT
TIE DOWN
BRACKET

D-E-C-I
O-E-C-2

THROUGH CRADLE
AFT CRADLE
THROUGH CRADLE

THROUGH CRADLE
AFT CRADLE

O-E-E-I
O-E-C-3
D-E-C-2
il

(MOST FWD)

M

C-A-C-I

TIE DOWN
BRACKET
1250
TIE DOWK
BRACKET

C-A-C-2
D-A-C-I
C-F-C-I
C-F-C-2
D-f-C-l

1
1

LEFT SIDE
LEFT SIDE
LEFT AFT CORNER
XiGKT S'lOE
RIGHT SIDE

1250

RIGHT AFT CORNER

C-B-C-I

BOLT

THROUGH CRADLE

C-B-E-I

1

C-B-C-2
C-C-C-I
C-C-ft-2
C-D-C-I
C-D-E-I
C-D-C-2
C-E-C-I
C-E-E-I
C-E-C-2

IN
ADDITION

1

1

BOLT

•

TIEDOWN
BRACKET

1

43

THROUGH CRADLE
INTERCONNECT
MODULE NO. 1 TO NO. 2 AND MODULf
NO. 3 TO HO. t

�4831

2050

MODULE H E I G H T (IB)
UPACITY ( G A L . S.G. 1.0)

=

11,712
992

U36

COMPARTMENT

TOTAL

I

IOW CAPACITY (LB)
EMPTYING SEQUENCE

7500

7500

7500

7500

©

©

r
FWO

L...
•ALLOWABLE PAYLOAO c.e.

FULL

ACTUAL PAYLOAO C.6.

FULL

EMPTt

•ALLOWABLE PAYLOAO C.6.

EMPTT

ACTUAL PAYLOAO C.O.

•PER T.O. tC-l236-9

Figure 17.

C-123K Floor Plan

�TABLE VI. O123 TIE-DOWN DETAILS

WOOULE

TIE-DOWN
FITTING NO.

FORWARD TANK

A- 8

ATTACHMENT POINT

A- 9
A-10

RIGHT AFT CORNER

E- 9

RIGHT FORWARD CORNER

E-10
A-11

RIGHT AFT CORNER
LEFT FORWARD CORNER

A-12

LEFT AFT CORNER

E-11

RIGHT FORWARD CORNER

E-12

RIGHT AFT CORNER

A-U

LEFT AFT CORNER

A-16

LEFT FORWARD CORNER

A-18

LEFT AFT CORNER

E-1U

RIGHT AFT CORNER

E-16

RIGHT FORWARD CORNER

E-18

AFT TANK

LEFT AFT CORNER

E- 8

POWER MODULE

LEFT AFT CORNER
LEFT FORWARD CORNER

RIGHT AFT CORNER

NOTES;
TIE-DOWH DEVICE:
QUANTITY = 1
SIZE
= 10.000

45

�MODULE WEIGHT (L8)
CAPACITY(6AL. S.C.

&lt;«83I ',
1.0)

COMPARTMENT

196
,

U

LOAD CAPACITY (L8)

0

12,900

i(83l

U83I

K96

H96

¥831

«»96

E

19. -.00

.

F

.

'

28,000

»L
'

48 31

U96

2050

H83I

&lt;m

),000

30,000

MO,698

496

W6 «

t,Wt

2H.UOO

12.700

t

H

G

M83I =

»5,

EMPTY INd SEQUENCE

FWO

•ALLOKASLE PAYLOAO c.c.

V////271

AfTJAL PAYLOAO C. G.

®

•ALLOWABLE PAYLOAO c.o.
ACTUAL

?uu.
FULL

EMPTY

V/////////S7//77//////777/S//A
Q

PAYLOAO C. 0.

EMPTY
'PER T.O. IC-I30E-5

Figure IS.

C-130E Floor Plan

�TABLE vn. C-ISOE TIE-DOWN DETAILS
MODULE
8
(HOST FWD)

TIE-DOWN
FITTING NUMBER
«A

ATTACHMENT POINT
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
RIGHT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER

no
.... :.. 5A

50
6B
6F

7

6

5

POWER MODULE

i»

3

2

1
(MOST

MOTES:

AFT)

TIE-DOWN DEVICE QUANTITY =

6A
66
8A
86
9B
9f
9A
•90
IOA
100
MB
IIF
IIA
110
I2A
120
138
I3F
m
118
I"»F
(KG

LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
' R I G H T FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
RIGHT FORWARD CORNER
LEFT AFT CORNER
LEFT RIGHT CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORKER
RIGHT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER

••-

LEFT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
RIGHT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORnER
RIGHT FORWARD CORNER
LCFT AFT COSHER
RIGHT AFT CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
RIGHT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
RIGHT FORWARD CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT AFT CORNER
RIGHT AFT CORNER
LEFT FORWARD CORNER
LEFT FORWARD CORNER
RIGHT FORWARD CORNEA
RIGHT FORWARD CORNER

I6A
166
ISA
I8G
198
I9F
I9A
190
201
20G
218
2IF
2IA
2IG
22A
220
2KB
2HF
23A
230
25A
258
25F
256
1

SIZE

=

47

10.000

�4.1*1.2 Secondary Aircraft
Tim compatibility restraints of the secondary aircraft are satisfied in a similar manner as the primary aircraft. Figures 19
through 24 and Tables VIII through X &lt;how the module layouts and
tie-down details where tie-down data was available.
4.1.2

Aircraft Modifications

One primary goal in designing the MISS was to allow the system to
be rapidly installed while minimizing aircraft modification.
Welding and metal-cutting operations were to be avoided. This
philosophy was followed; major internal hardware is secured using
standard tie-down devices. External hardware is attached to
mounting plates which are bonded to the external aircraft surfaces.
Complete modification information for the C-47, C-123, and C-130
is contained in their respective Class II modification documents.
Figures 25 and 26 show the MISS test kits as installed on the
C-47 and C-130 aircraft. Figure 1 (Section III of this report)
shows the C-123K installation.
4.1.2.1

Internal Modifications

The jump door openings were chosen as the location for the
internal/external plumbing connection, the vent and dump outlets,
battery and gas tank vents, and engine exhaust. This requires
the jump doors to be removed for spraying but provides convenient
routing without modifying the aircraft. The plumbing at tho- 'doors•
can be removed and doors closed for ferrying. Several alternate
openings were considered. A hole could be conveniently cut in
the fuselage to minimize pipe length requirements, but this is
time-consuming and is a major metal-cutting operation. Removal
of a window was considered, but it would not adequately serve as
a route for the emergency dump line since the dump line must be
below the tanks to allow gravity flow. Removing an emergency
exit is fast; again/ this does not present an attractive means
of routing the dump line.
The pilot's control box location was determined for each aircraft
during the system fit tests according to the pilot's preferences.
Most pilot control box brackets can be either bonded or bolted in
place. The C-123 box bracket is bonded, the C-130 bolted to the
window frame, and the C-47 pop-riveted to the central control
console.
The dump chute, vent chute, and exhaust chute, located at the
jump door, are mounted to brackets which, in turn, are bc-.ided-to
the aircraft interior. The bonding agent specified is silicone
which can be easily removed when desired to reutore the aircraft
interior to its original non-modified condition. Another method

�TOTAL
12.982

MODULE WEIGKT(LB)
CAPACITY (GAL. S.6.

i,024

COMPARTMENT
LOAD CAPACITY

'ALLOWABLE PAYLOAD C.O.
ACTUAL PAYLOAD C.O.

'ALLOWABLE PAYLOAO C.G.
ACTUAL PAY LOAD c.o.

FULL
FULL

EMPTY
EMPTY
•BASED ON ASSUMPTION THAT M3»C
AIRCRAFT C.G. (IMCL. FUEL AND
CREK) IS AT THE FWO C.fl. UMIT.

Figure 19. C-46D Floor Plan

�M03UIE WEIGHT ( L B )

1300 *300

1300

U300

4300

1300

1300

138

438

138

138

438

20 50

1300
M38

TOTAL =

36.800

•

CAPACITY (GAL. S.G. ».0)

138

; 138

r
L
r
i
1r—+—+—^
E

COMPARTMENT

9500

LOAD C A P A C I T Y

EMPTYING SEQUENCE

.O

f

G

H

9000-

7500

" 75CFO

9000

u) (3) m

CO

(a;

3.««

i i
' i
»•!*—t—t—^—Hi
7000

(z)

7000

7000

7000

(i

FWD

en
o

J~

HATCH

HATCH

' A ^ - J . *.
'J''t

•ALLOWABLE PAYLOAO c.o.

. FULL
FULL

ACTUAL PAY LOAD C.G.

•ALLOWABLE PAYLOAO C.G.
ACTUAL PAYLOAD C.G.

Y//7////7777/77/77/A
&amp;

EMPTY

EMPTY

'PER T.O. IC-97A-9

Figure 20,

C-97G Floor Plan

�TABLE VIII.

MODULE

TIE-DO WN
FITTING NO.

C-97G TIE-DOWN DETAILS

TIE-DOWN DEVICE
qn
SIZE

ATTACHMENT POINT

L-«IL

1

TIE-DOW BRACKET

LEFT SIDE

L-U2R

POKER MODULE

4

TC-DOWH BRACKET

RI6HT SIDE

H-5U

10,000

LEFT AFT CORNER

M-5IR

10.000

RIGHT AFT CORNER

•

I-1IL

BOLT

THROUGH CRADLE

(An TANK)

J-m.R

BOLT

THROUGH CRADLE

L-7IL
L-7IR

10,000
10,000

LEFT AFT CORNER .
RI6HT AFT CORNER

L-5IL

10,000

LEFT FM&gt; CORNER

L-5IR

10,000

RIGHT FWD CORNER

H-H3L

BOLT
BOLT

THROUGH CRADLE

I-OIR
H-81L
N-6IR

25,000
25,000

FWD LEFT CORNER
FWD RI2HT CORNER

H-Hk
H-UIR

BOLT

THROUGH CRADLE

BOLT

THROUGH CRADLE

2

3
|J

THROUGH CRADLE

THROUGH CRADLE
THROUGH CRADLE

25,000
25.000

FWO LEFT CORKER

K-8IR

FWO RIGHT CORNER

F-UIL

BOLT

THROUGH CRADLE

F-UIR
6

BOLT
BOLT

K-8IL
5

G-'HL
G-1IR

BOLT
BOLT

THROUGH CRADLE
THROUGH CRADLE

BOLT
25.000

THROUGH CRADLE

E-4iL
E-«HR
I-8IL

25,000

I-8IR

7

o-mt
C-H2L
D-4IR
G-8IL
G-8I.&lt;

IK ADDITION

RIGHT FWO CORNER

BOLT
BOLT

D-UIR
&amp;
(FWD TANK)

LEFT FWO CORNER

,

THROUGH CRADLE
THROUGH CRADLE

BOLT

THROUGH CRADLE

BOLT

THROUGH CRADLE

25,000

FWO LEFT CORKER

1

25.000

FWD RIGHT CORNER

2
2

BRACKET
BRACKET

CONNECT MODULE 2 AND 3

2

BRACKET

CONNECT MODULE K AND 5

2

BRACKET

CONNECT MODULE 6 AID 7

51

CONNECT MODULE 1 A*D 2

�WOUU «IGHT{18)

42S8

UPACITY(QAL. S.G. 1.0)
COMPAHTKEKT

C

LOAD CAPACITY

;

432
,
L

432
0

EH»niK5 SEQUENCE

J

I

5120

U32
y

432

r—T—T
J

5200

4258

H25S

432

432

r —h—T
4800

2050

\

5200

"

5200

• I

TOTAL

=

27,538
2.592

432

"
5HW

T—i
I

I

J720

O

1
16.S INCHES

12 'NCHES

30

10 1HCHES

Ul
NJ

•22

* ALLOW ABLE PAYLOAD C.Q.
ACTUAL PAYLOAD C.G.

10

INCHES

\777777777A
®

FULL
FULL

•ALLOWABLE PAYLOAD c.s.

EMPTY

ACTUAL PAYLOAD C.Q.

EMPTY
"PER T.O, IC-II6A-9

Figure 21.

C-118A Floor Plan

�TABLE IX.
TIE-DOUN

MODULE

FITTING NO.

1

i-»

(AFT TANK)

8-30
8-3!
1-32
C-2&gt;

C-118A TIE-DOWN DETAILS

TIE- DOWN DEVICE

&lt;m

SIZE

1

5000

4

i

2

3

K

LEFT AFT CORNER

i

k

i

C-31
C-32
A-33
B-29
D-30
0-bl
D-32
E-2S
£-30
£-31
£-32
F-2«
F-33
A- 19
A-23
A- 23
A-2S
F-19
F-23
F-25
F-26
A- 18
A- 20
A-21
A-22
F-18
F-20
F-21
F-22
A-IU
A-l*
A-16
F-lt
F-15
F-16
8-16
B-16
0-16
D-18

ATTACHMENT POINT

i

LEFT AF T CORNER
RIGHT AFT CORNER
I i

RIGHT AFT CORNER
LEFT FWD CORNER
LEFT FWD CORNER
LEFT FWD CORNER
LEFT AFT CORNER
RIGHT FWD CORNER
RIGHT FWD CORNER
RIGHT FWD CORNER
RIGHT AFT CORNER
LEFT AFT CORNER
LEFT FWO CORNER
LEFT FWO CORNER

LEFT' FWD CORNER

1

'
5000
10,000
10,000
10,000
10,000

53

RIGHT AFT CORNER
RIGHT FWD CORNER
RIGHT FWD CORNER
RIGHT FWD CORNE?
LEFT FWD CORNER
LEFT FWO CORNER
LEFT AFT CORNER
RIGHT FWD CORNER
RIGHT FWD CORNER
RIGHT AFT CORNER
LEFT AFT CORNER
LEFT AFT CORNER
RIGHT AFT CORNEl
RIGHT AFT CORNEl

�TABLE IX.

MODULE
5

TIE- DOWN
FITTING NO,
A-IO
A-ll
A-f2
A-13

(CONCLUDED)

TIE-DOWN DEVICE
OTY

1

ATTACHMENT POINT

SIZE

I

LEFT FWO CORNER

5000

4

t

t

T

LEFT FWO CORNER
LEFT AFT CORNER

*

F-IO

6

RIGHT F*i&gt; CORNER

F-ll
F-12
F-13
A-U

RIGHT FWD CORNER
RIGHT FWO CORNER
SIGHT AFT CORNER
LEFT FWO CORNER

A-7
A-8
A-9
(

B-t

LEFT FWO CORNER
4IGHT FWO CORNER

C-4
F-¥
F-7
F-8
F-9

1

RIGHT FV 0 CORNER

.0-1

POWER MODULE

B-17
E-15
E-17
B-16
B-18
E-16
E-18

ADDITION

1

B-IS

1
i
2
2
2
2

LEFT FWO CORNER
LEFT FWO CORNER
SIGHT FWD CORNER
RIGHT FWD CORNER
LEFT AFT CORNER

1

6000
BRACKET
&amp;RACKIT
BRACKET
BRACKET

LfFT AFT CORNER
RIGHT AFT CORNER
RIGHT AFT CORNER
CONNECT MODULE NO. 1 TO NO. 2
CONNECT MOOUIE NO. 2 TO NO. 3
CONNECT MODULE NO. 4 TO NO. 5
CONNECT MODULE NO. 5 TO NO. 6

�4250

MODULE WEIGHT ( L S )

«S250

1250

2050

431

CAPACITY(OAL. S.fl. 1.0)
COMPARTMENT

5WO

LOAD CAPACITY

I'
—r ' 'I-

5300

5300

J
5W)

-I- ' •!•
5500

L
5500

* " 4
5300

5300

EMPTY I KG SEQUENCE

H

19.5 INCHES

FWD

j&lt;

10 IKCKES

T

en

•ALLOWABLE PAY LOAD c.o.

Y/////A

ACTUAL PAYLOAD C.G.

FULL

^

FULL

Y/////////77A

'ALLOWABLE PAYLOAO C.G.

EMPTY

EMPTY

ACIUAL PAYLOAO C.G.

'PER T.O. IC-H9B-9

Figure 22.

C-119G Floor Plan

5300

�TAgLE X.
WODUIE

C-119G TIE-DOWN DETAILS

TIE-DOWN
FITTING NO.

ATTACHMENT POINT

2

LEFT FORWARD CORKER

5

LEFT FORWARD CORKER

7

*

LEFT AFT CORNER

65

RIGHT FORWARD CORNER

68

RIGHT FORK ."&gt; CORKER

70

RIGHT AFT CORKER

3

LEFT FORWARD COT.NER

6

LEFT FORWARD CORKER

8

3

LEFT AFT CORNER

24

RIGHT FORWARD CORNER

71
10

RIGHT AFT CORNER
LEFT FORWARD CORNER

23

LEFT AFT CORNER

56

RIGHT AFT CORNER

73

RIGHT FORWARD CORNER

9

LEFT FORWARD CORNER

12

LEFT FORWARD CORNER

13

LEFT FORWARD CORNER

72

RIGHT FORWARD CORNER

75
76

RIGHT FORWARD CORNER
RIGHT rORWARD CORNER

II

LEFT FORWARD CORNER

HI

LEFT FORWARD CORMEft

15

r

RIGHT FORWARD CORNER

69

2

RIGHT AFT CORNER

66

POWER MODULE

LEFT AFT CORKER

57

LEFT AFT CORNER

30

RIGHT AFT CORNER

63

LEFT AFT CORNER

7»

RIGHT FORWARD CORNER

77

RIGHT FORWARD CORNER

78

RIGHT AFT CORNER

NOTES:
Tl£-DOWN DEVICE:

QUANTITY
SIZE

=
=

1
10,000

5&lt;5

•

�4258
432

CAPACITY (GAL. S.G. 1.0)

COMPARTMENT
LOAD CAPACITY (LB)

•

f

^

5400

EMPTYINft

4258

432

MODULE VEiGHT(LB)

1(32

• . .
1

6100

2050

•fr—:
6100
6300

4253

4258 4258

432

432

2,592

432

L
* 6)00 -I. 6100 'I
"
6100

H»
6100

© © G

©

1
24 INCHES

-•{

}«-36.5INCHES-*j

J4-23.5 INCHES

T

/ ft 1 ' /

fo1.^'

tn

.

14 INCHES

M!

FWD* ALLOWABLE PAYLOAD C.G.

'PER T.O. IC-I2IC-9

FULL

FULL

ACTUAL PAYLOAD C.G.

•ALLOWABLE PAYLOAD C.G.

EMPTY

ACTUAL PAY LOAD C.O.

EMPTY

Figure 23.

O121G Floor Plan

�TOTAL
2600

2600

2600

2050

2600

MODULE WEIGHT(lB)

i •'

233

E
1300

.

233

F

G

IMOO

IWO

f—:—H

1100

.

1233

233
K

CAPACITY(GAL.S.G. 1.0)
COMPARTMEKT

J

IWO- J300

•!• ' -I'

L

M

1300

-^fr

I 2. "*»

•

1300

1300

1600

j

LOAD L I M I T

FWOEMPTY 1H&lt;3 SEQUENCE
23 INCHES

J«- 8 IKCHES

IHCHES

CO

\t- 1 INCHES

-k| }*— 8 INCHES

'ALLOWABLE PAYLOAD C.G.

FULL

ACTUAL PAYLO.D C.6.

•ALLOWABLE PAYLOAD C.fl.
ACTUAL PAYLOAD C.G.

Y//////////////////////////},
®

EMPTY

EMPTY
'BASED OH ASSUWTIOH THAT BASIC
AIRCMFT C.G. ('SCL. FUEL A«0
CREW) IS AT THfc H&lt;0 C.6.'LIMIT.

Figure 24.

C-131E Floor Plan

932

�MINE CXHAU5T

2 INCH SPRAY HOSE
ASSEMBLY
VINT. DUMP CHUTE
ASSEMBLY

SPRAY BOOM TEE

Figure 25.

C-47 Modular Internal Spray System
Kit No. 4374132

59

�WIKG BOOM
(2)

-VtNT/OUMP CHUTE ASSEMBLY ( I )

FUSF.LAGE HOSF ASSEMBLIES

HOTE:

THIS is A IUTAKX SYSTEM
FOR AIR FORCE TESTING ONLY.
THE ACTUAL C-130 MISS USES
8-TWK MODULES, FOR A TOTAL
CAPACITY OF MOOO GALLONS.
FUSELAGE
SPRAY S T A T I O N
ASSEMBLY (2)

Figure 26.

C-130 Modular Internal Spray System Kit No. 4374236

�considered was bolting the hardware to existing tie-down points,
but this would require special brackets for each aircraft and
would reduce the .modularity of the PWU-5/A MISS.
4.1.2.2

External Modifications

The only modifications reouired to the exterior of the aircraft
are those necessary to attach external plumbing, consisting of
high-pressure hose along the fuselage and wing booms located
approximately 12 inches under the wings.
Several methods of attachment were considered:
•

Drilling and riveting

•

Projection welding stuus to the aircraft surface

•

Bonding mounting plates.

Drilling and riveting would mean permanent aircraft modification,
require highly trained modification personnel, would mean metalcutting advised against by the Air Force, and could not be performed on wet wing aircraft. Therefore, this method of attachment
was eliminated.
Projection welding studs to existing aircraft r.'vets or thick skin
appeared to be a satisfactory solution, since it could be ground
flush during demodification to restore the aircraft to its original
condition. This method was rejected, however, after several tests
proved that the rivet alloys were not compatible with stud welding
since micro-cracks formed in the weld zone which would be vulnerable to fatigue propagation and subsequent weld failure.
As a result, bonding was selected as the best attachment method.
To aid in the selection of a bonding agent, optimum requirements
were established:
•

Require little or no quality control

•

Bond to an aluminum surface without special surface
preparation other than solvent washing and priming

•

Require no pressure or heat for curing

•

Flexible (not subject to impact or fatigue)

•

Viscous (allow adapter plates to be held in- place
without fixtures while the bonding agent cures)

•

Resistant to temperature (-65 to +165°F), weather,
aromatics, aliphatics

•

Not critical to film thickness

61

�» 40-psi tensile strength minimum with good peel
•

Readily removed, if desired, to allow 100 percent
aircraft dejroodification.

Using the above criterion, Dow Corning 93-046 two-part'silicone
adhesive was selected. Using this adhesive, several laboratory
tests were run to determine adhesive tensile and shear ultimate
strengths as a function of surface preparation and bonding agent
thickness, the best results were obtained by preparing the
alumnun test samples as follows:
1. Pemove all paint using commercial paint stripper or
wire brush.
2. Abrade surface with Scotch Brite pad Uf-ing Scotch
3911 degreasing primer.
3. Allow primer to dry and dust off powder.
4.

Reapply 3911 (do not abrade with Scotch Brite), allow
to dry, and dust off powder.

5.

Prime all surfaces with Dow Corning 1200 primer and
allow to dry.

6.

Apply DC 93-046 adhesive, making sure all aluminum
surfaces are wetted.

:7v." Press samples together (hand pressure) and'allow
adhesive to cure.
Dow Corning recommends 24 hours for cure and 7 days for ultimate
strength. Using the above procedure to prepare the aluminum
samples, the following tensile and shear ultimate loads were
obtained:
Type of
Tost

93-046
Thickness (inQ

Ultimate Load
Jpsi)

Type of
Failure

Tensile

0.010

496

Cohesive

Tensile

0.050

410

Cohesive

Tensile

0.100

328

Cohesive

Lap Shear

0.010

212

Cohesive

Lap Shear

0.050

262

Cohesive

Lop F.hear

0.100

229

Cohesive

G2

�These results were obtained using the adhesive as it would be used
in the field, without degassing the adhesive prior to bonding.
As explained in the C-123 Class II modification documentation, the
worst case tensile load on the bonding agent (for the C-123K
system) is 8.72 psi, and the worst case shear load is 3.33 psi.
Therefore, the DC 93-046 bonding agent has a safety factor of over
30 based on ultinate strength.
An additional test was performed using two MISS wing boom mounting
plates (Figure 27). These mounting plates were bonded together
with outdated DC 93 -046 adhesive by following the prescribed surface preparation and bonding procedure. After allowing the
adhesive to fully cure, these plates were pulled in tension to
failure. Figure 28 shows the results of this test. As can be
seen, the plates held 10,000 pounds for over 20 seconds before
yielding (tearing), and still supported 7600 pounds after yielding
at 10,000 pounds to 7600 pounds. The maximum C-123K mounting
plate tensile load is 258 pounds.
Since the exposed edges of the DC 93-046 adhesive could be wetted
by fuel or spray agent in the actual MISS application, Dow Corning
94-003 Dispersing Coating was specified to coat all exposed silicone adhesive. This suspension coating is fluorosilicone which
is resistant to fuels and agents, whereas the DC 93-046 adhesive
could be degraded slightly by exposure to these agents.
The entire method of bonding was reviewed by personnel at WrightPatterson Air Force Base who stated that polymer reversion would
occur inside the silicone bonding agent whenever the bonding agent
width exceeded 2 inches. Although there was no data available to
prove this theory, several vented mounting plates were designed
to provide a maxitmra bonding agent width of 2 inches, as shown in
Figures 29 through 32. Of these special designs, Wright-Patterson
Air Force Base personnel chose Design No. 2, Picture Frame with
Gussets. Several ot these plates were submitted to WPAFB for
testing. For many of these tests, the bonded mounting plates
were soaked in jet fuel, and subsequent tension tests revealed
that the DC 94-003 dispersion coating did not protect the silicone bonding agent, and the silicone was badly degraded. After
discussion with Dow Corning personnel, DTL suggested the use of
DC 94-002 fluorosilicone sealant as a protection for the 93-046,
since it could be applied thicker. Wright-Patterson Air Force
Base personnel stated that even if the edges of the silicone
bonding agent could be adequately protected, the bonding agent
could be degraded by fuel leaks at rivets under the bonding agent
when the MISS was installed on wet-wing aircraft. Because of
this leaking rivet problem, Wright-Patterson Air Force Ease
personnel stated that silicone bonding agent could not be used to
attach the wing booms on the MISS. Subsequently, WrightPatterson Air Force Base personnel specified certain epoxies which
could be used. DTL then designed a mounting plate with removable
hanger specifically for use with epoxy bonding agents.

�0.375 INCHES

MATERIAL:

60CI-T6 ALUMINUM

P/H 2H882-W39UJ-I

Figure 27.

Mounting Plate (First Design)

64

�10-

I-

MAI C-I23X
WOlfflTIM fUT£ Kit 101
2M LI

»

s
TIME IN MINUTES

Figure 28.

Bonded Mounting Plate Load-Time History

�ft INCHES

o

INCHES

1.0 INCH TYP

2.0

•—

«»

u&gt;

o

O

INCHES
TVP

o

i
20
INCHES

^

2.0 INCHES

f
PROOF PULL TEST
POINTS
2.0 INCHES

O

Figure 29. Modified Mounting Plate Dsaign No. 1,
Picture Frame

�30.

67

�i

o
1

«•

2 INCHES

O
•»

I

1

0.50 INCH
&lt;

i

O

/

/
/
/

--

-

o

i uinti iff it ii i / /

/
'-™^ /

/
/

X«X

^
/
! 1 i

^

! I!

1I

8 INCHES

f
t
r

O

I
o

\

1

PROOF PULL TEST POINTS

Figure 31.

Modified Mounting Plate Design No. 3,
Slotted Plate

�6 INCHES
-TAPE TEMPLATE

WING
SURFACE

8 I ICHES

•. CLEAN AND PRIME (DC 1200)
b. LET DftY
c. APPLY TAPE TEMPLATE
d. APPLY DC 93-0*6 ADHESIVE

3 EACH
2 INCH x
6 INCH
HOLES IN
TAPE
TEMPLATE
2.0 INCHES

«. PEEL OFF TAPE TEMPLATE
WING
SURFACE
INCH x 6 INCH
PATCHES OF
ADHESIVE

a.

REPEAT ABOVE PROCESS ON
6x5 tNCH MOUNTING
PLATE
b. ATTACH POUNTING PLATE TO
NIKO SURFACE
C. ALLOW ADHESIVE TO CUKE
d. FLOOD COAT ALL EXPOSED
ADHESIVE WITH DC 9H-OQ3
DISPERSION COATING

VIKG

SURFACE
VOID
THROUGH

•TEST POINTS

APHf.SIVE
Figure 32.

Modified Mounting Plate Design No. 4,
Individual Bonding Pads

69

�The C-123K MISS was consequently installed and flight tested,
using epoxy to attach the wing boom system and DC 93-046 silicone
adhesive (protected with DC 94-002 fluorosilicone) to attach the
engine exhaust, vent chute/dump chute, and fuselage hose assemblies. All systems worked as designed, and both bonding agents
performed well. The components bonded with the silicone were
easily removed during aircraft demodification, but the epoxybonded mounting plates remained in place as &amp; permanent (Class V)
aircraft modification.
4-. 1.3

Performance Degradation

Since the external MISS wing boom system will cause additional
drag, several wing boom configurations were investigated. The
drag coefficients for these shapes are shown in Figure 33, and
the projected performance degradation in percentage of horsepower
increase required tc maintain cruise condition for several aircraft is shown in Table XI. As can be seen, a maximum increase
of 3.4 percent horsepower is required to maintain cruise condition if a fully streamlined boom were used.
This data was then combined with actual hardware designs to
develop a wing boom which was easily manufactured and exhibited
minimal drag. The actual designs investigated are-covered 1:1
paragraph 4.8.2 of this report. The final selection design was
the aft fairing type, which was flight tested on a C-123K at
Eglin Air Force Base, Florida. The pilot stated that additional
drag was minimal and did not adversely affect flight characteristics.
4.1.4

Ins tallat ion and Remova1

Based on a review of ANA Bulletin 518, Cargo Aircraft Compartment
Dimensional Data, the available aircraft T.O.'s, and other sources,
a summary of data pertinent to MISS loading operations was compiled. Figure 34 and Table XII present this data for the specified
aircraft. During loading, ANA Bulletin 518 specified that 6
inches clearance should be maintained between the cargo and the
aircraft. Temporary wood shoring or tracks may be required to
distribute the wheel loads on the aircraft floor, particularly in
those cases where the treadways are spaced wider than "the wheels.
-Several of the aircraft haYe built-in winches to assist loading.
In the C-97, the winch is mounted on an overhead monorail and can
be used to hoist cargo as well. Portable winches, either manual
or power types, can be used on virtually all of the aircraft.
However, these portable items are not a permanent part of the
aircraft and, therefore, cannot be assumed to be available in all
cases.
The? tank and power modules are supplied with captive castors and
jacks which facilitate installation and removal. These jacks and
wheels were found to be extremely helpful during installation of
the- O123K MISS at Eglin Air Force Base.

70

�THICKNESS/CHORD INDICATED

.2

TYPE:

-

o ao&gt;

CYLINDER

HEMISPHERICAL
NOSE

AFT FAIRING

Figure 33.

STREAMLINE

oo
ELLIPTICAL

Wina Boon Drag Coefficient

�TABLE XI.

AIRCRAFT PERFORMANCE DEGRADATION AND HORSEPOWER INCREASE REQUIRED TO MAINTAIN
CRUISE CONDITION USING STREAMLINED WING BOOM

COMPONENT CONTRIBUTION INO TOUL IX PERCENT
AIRCRAFT

VELOCITY
(KTAS)

ALTITUDE

WING

BOOM

NOZZLE

FUSELAGE

FUSELAGE

(FT

BOOM

BRACKETS

STATIONS

STAN&amp;OFF

NOZZLE

USD

TOTAL

C-470

•si

5.000

2.40

2.25

1.62

0.11

0.11

6.5

C-54G

to

142
157

5.000

1.76

1.54

1.12

0.06

0.06

4.5

C-97G

193

5.000

1.76

1.48

1.15

0.05

0.05

4.S

C-118*

198

10.000

1.76

1.53

1.16

0.06

0.06

4.6

C-U9G

151

5.000

1.04

O.S8

.72

NIL

0.09

2.8

C-I21G

212

10.000

1.64

1.45

1.08

0.06

0.06

4.3

C-123K

136

5.000

1.04

0.96

0.08

NIL

0.09

2.9

C-I30E

263

20.000

2.00

1.75

1.31

NIL

0.14

5.2

C-131E .

165

5.000

2.44

2.15

1.58

0.08

0.08

6.3

�000*

CONVENTIONAL LANDING GEAR
(SIDE LOADING)

-NOR.
WIDTH

TRICYCLE LANDING GEAR
(SIDE LOADING)
FLOOR HEIGHT

TAIL LOADING

FLOOR HEIGHT
1

RAMP ANGLE

Figure 34.

Aircraft Loading Nomenclature

73

�TABLE X I I . r INSTALLATION/REMOVAL DATA

AIRCRAFT

MAIN DOOR

FLOOR ANGLE RAMP ANGLE FLOOR HEIGHT
(DEGREE)

(DEGREE)

BUILT-IN

(INCH)

WINCH

WINCH
CAPACITY
(POUNDS)

DOOR WIDTH DOOR HEIGHT
(INCH)

(IBW)

C-460

SIDE

9.5

N.A.

90-97 AT DOOR

HO

N.A.

81

+ C-47D

SIDE

II. 5

M.A.

56.5 AT DOOR

NO

N.A.

84.5

+ C-54G

SIDE

(0)

N.A.

106.7

NO

N.A.

95

67

C-976

AFT

(0)

24

112

TES
IIKCH HOIST

7500/5000

(88)

84

C-H8A

SIDE

(0)

N.A.

106

NO

N.A.

124

78

C-H9G

AFT

(0)

10

45.5

YES

•

(HO)

(92)

C-I2IG

SIDE

(0)

N.A.

112.5

•

•

C-l23R

AFT

(0)

12.1)

33. b

TES

+C-130E

AFT

(0)

12.5

41.6-45

fES

SIDE

(0)

N.A,

NO

-f

C-I31E
NOTES:

•f
N.A.
*
( )

-

PRIMARY A I R C R A F T
NOT APPLICABLE
NO DATA
NOMINAL CR APPROXIMATE

89

69-79
55.7 - 70.6

112.5

74.5

no

98

25.000

120

108

N.A.

100

72

(3300)

�The installation and removal studies resulted in a required module
envelope, as shown in Figure 35. The required and actual dimensions of the tank and power modules are shown.
The C-47 aircraft, due to its small size and side-loading cargo
door, places the greatest restriction on the MISS design. During
the design effort it became apparent that, to be cost effective
and minimize the number of tank modules, the system would be a
tight fit in the C-47. As a result, the tank module must be
loaded from the end, as shown in Figure 36. During the fit test
of the actual MISS hardware into the C-47, this end-loading
technique was used successfully.
4.1.5

Aircraft Spray Contamination

Analysis of contamination possibilities on all ten aircraft was
performed. Both normal spray operations and emergency dump were
considered.
Small throe-view drawings of the specified aircraft were used as
an aid in this study. External MISS components were added to these
drawings on the basis of preliminary component placement studies.
The wing booms were 70 percent of the wing span in each case.
Wing nozzle stations were spaced every eight feet on the booms,
starting at the tip and working inboard. A minimum (of three
nozzles) was used on each wing boom; on some long-span aircraft,
four nozzles were used on each wing. Later design changes
specified nozzles every 2 to 4 feet along the 70 percent span,
but this design change does not affect the contamination data
presented here.
To provide for fuselage spray stations on side-loading aircraft,
a single central nozr.le station extending down from the open
cargo door was used. On tail-loading aircraft, a pair of central
nozzle stations were used, with one nozzle extending outward from
each open jump door.
The dump line was assumed to be mounted in the open cargo or jump
door, with the end of the tube protruding only slightly from the
fuselage line.
Normal spray patterns were superimposed on the drawings using an
arbitrary expanding conical form. If portions of the aircraft
appeared to fall within these spray patterns, a contamination
possibility was assumed to exist.
Likewise, the estimated dump pattern was superimposed on the aircraft and contamination possibilities were investigated.

75

�ALLOWED

O

POWER MODULE

60

85

LEHGTK (t»CKES)

TiU MODULE

72
«9

WIDTH

56

HEIGHT f t » C H E S )

0

=

DETEftttfKEO FROM C-U7 LOAD (NO CHARTS.

(2)

=

DETERMINED FROM C-«^ COMPAftTMEHT WIDTH Of 7$
ALLOWS 2 -

0

=

IS IMCH AISLES.

DETERMINED FROM C-&gt;»7 CARGO DOOft.

fOrt* MODULE OFfSET IH C-*7 TO ALLOW ONE AISLE l&gt; I»CHES WIDE

Figure 35.

Module Envelope

76

�DOOR

FLOOR

Figure 36.

C-47 Installation

�The results of the study are summarized in Table XIII. Note that
three spray nozzle orientations are considered, ranging from
straight aft to straight down. It appeared that a 45-degree down
or straight-down orientation was attractive from the standpoint
of reducing the possibility of wing contamination. The actual
nozzle orientation selected was straight down.
Emergency dump contamination/ although present/ is not considered
to be a significant problem due to the overriding safety requirements for the dump.
Results of the flight test of a C-123K Modular Internal Spray
System at Eglin Air Force Base, Florida, indicated that:
1. No contamination resulted from the wing boom nozzle
stations.
2. The right-hand fuselage nozzle station caused minor
contamination of"the right-hand aft fuselage (apparently due to the vacuum created by the dump chute
directly behind the nozzle station or due to the
aircraft propeller rotation direction).

'
4.1.6

3. The emergency dump caused contamination of the aft
fuselage up to the horizontal stabilizer, and slight
internal contamination due to sprayback through the
jump doors. All personnel present at the flight
tests agreed tnat moving the dump chute to the rear
of the jump door would prevent internal contamination.
.The dump chute was relocated accordingly on subsequent
MISS kits.
- ; ' - - . .
Spray Performance

Contractual requirements stated that the effective ground swath
width must be at least twice the applicable aircraft wing span
when agent is disseminated at 100 feet abovs ground level (AGL).
To accomplish this, it is necessary to take advantage of the
dispersing effects of the wing tip vortices.
«•
Figure 37 illustrates the general nature of these vortices. As
the vortex moves aft, it expands, forming a conical pattern. The
swirling effect causes agent introduced into the vortex to disperse
laterally. The size and strength of the vortex depends upon flight
conditions and the specific aircraft but, in general, it can be
expected to cause sufficient lateral dispersion to meet the swath
width requirement.
Propwash also can be expected to cause agent swirl, but generally
it is not sufficient to guarantee a wide swath.

73

�TABLE XIII.

CONTAMINATION POSSIBILITIES

NORMAL SPRAY OPERATIONS
NOZZLE ORIENTATION

AIRCRAFT

STRAIGHT AFT

C-46D

EMERGENCY
DUMP

A. B

C-54G

STRAIGHT DOWN

«, B

C-470

«5* MMI

A. 1

C. D

C-97G
C-II8A

A. B

C-U9G

A. S

C-12IC
C-I23K

A, B

C, £

C-I30E

A, B

C, E

C-I3IE

A.

C. F

NOTES:
0 = NO CONTAMINATION A N T I C I P A T E D
A - POSSIBLE CONTAMINATION OF LOVER VU&amp; SURFACE ABOVE ANO AFT OF NOZZLES
B = POSSIBLE CONTAMINATION OF TIP OF HORIZONTAL STABILIZER

c = LIKELY CONTAMINATION OF FUSELAGE SIOE
0 -- LIKELY CONTAMINATION OF HORIZONTAL STABILIZER (LOVER SUrffACE)
E = POSSIBLE CONTAMINATION OF EXTERIOR OF CARGO RAMP
.F -- POSSIBLE CONTAMIHATICN OF LO«R SURFACE OF HORIZONTAL STABILIZER
G -- POSSIBLE CONTAMIUTICK OF TAIL BOM

79

�WING VOR1EX

DISPERSION

Figure

.

Wing Vortex E f f e c t

80

�A relatively uniform deposition level over the swath width is
important for avoiding undue agent concentrations or voids. If
a single tail spray nozzle station is used, a large peak would be
expected along the aircraft flight path.
It should be noted that effective swath width differs from total
swath width, as illustrated in Figure 38. For efficient spraying,
it is therefore desirable to have relatively, uniform deposition
curve with steep ends.
It must be pointed out that nozzle placement can have an effect
on the ground spray pattern and therefore warranted investigation.,
However, nozzle placement can never be expected to achieve a perfect ground pattern, for it cannot overcome or change the basic
airflow characteristic of a given aircraft. These characteristics
determine the gross ground spray effects.
Spray performance data was ~en«l"'"t**d as an aid to design studies.
This data was based on a '
ray speed of 150 mph and
assumed ideal conditions .
, agent sprayed was to be
evenly distributed in a sw
a equal to twice the aircraft
wing span with no peaks or
je. Table XIV presents the spray
performance data. Note that v.ie 3 ounce/acre deposition columns
were based on four times the aircraft wing span. This is justified by previous low volume spray testing results, which show
greater lateral drift of the fine low volume spray.
Using the specified extremes of agent deposition, flow rates
were calculated. Eased on total agen.t capacity and flow rate,
maximum spray time was computed for both deposition level extremes.
From a practical standpoint, the spray times for the 3 ounce/acre
deposition level arc far in excess of normal mission time. In
fact, they generally exceed the maximum airborne endurance cap3bilitics of the aircraft. Maximum area coverage was then
calculated, based on spray time and area coverage rates.
To actually achieve effective swath widths equal to those shown,
it will be necessary to spray at greater than the indicated flow
rates (due to deposition peaks and trail-off), which will, in
turn, reduce spray time and area coverage figures.
4.2

CHEMICAL AGENTS

Contractual requirepients dictated that the PWU-5/A MISS was to
disseminate a variety of chemical agents, including defoliants,
herbicides, pesticides, and fertilizers in the form of chemical
solutions, suspensions and slurries. The range of physical properties for these agents as stated in the contract were:
PROPERTY
RANGE
LOW
HIGH
Specific Oravity

1.0

2.0

Viscosity, Centipoise

1

350

81

�CURRENT AIR FORCE
RESULTS

DESIRED
DEPOSITION
LEVEL

S«TH IIIOTH (FT)

Figure 38.

Effective Swath Width

R2

�TABLE XIV. SPRAY PARAMETERS
AIRCRAFT VELOCITY = 150 MPH
AIRCRAFT

SIATH
IIOTH ( F T )

AGENT
CAPACITY
(GAL)

SPECIFIC GRAVITY = 1.0

RECTANGULAR DISTRIBUTION
FLOW RATES
} 01 *eRC + 3 S»L'*CI£

SPRAY TIKE
) 02/ACU +
(•IN)

) SAl/XCftC
&lt;"tH)

AREA COVERAGE
1 SH'JCif
j o:'tcic

&lt;CM»)

&lt;cm&gt;

3.CS

196

335

5.3

43.700

345

&lt;»C«f$)

(ACICS)

C-45D

216

1024

C-i/C

190

480

2.7

173

178

2.7

20.600

158

C-54G

235

15*4

3.34

214

576

9.0

82.000

637

C-97G

283

3550

4.02

257

883

13.7

151,000

HBO

c-iie*

235

2592

3.34

214

776

12.1

110.000

860

C-1I9G

219

1752

3.10

199

735

8.7

74.600

S79

C-I2IG

246

2592

3.48

224

745

11.8

112,000

870

C-123K

220

992

3.12

200

318

5.0

42.500

334

C-I30E

265

3968

3.76

241

1053

16.5

169.000

1320

C-13!E

211

960

3.00

192

320

4.6

37,500

292

* 8 A S E O ON FOUR TIMES NIKS SPAN.

,

�4.2.1 Agent Characteristics
Using the above requirements, a survey of existing and potential
future chemical agents was made to determine their chemical,
physical, and toxicity characteristics. Table XV lists several
such agents. As can be seen* most agents have specific gravities
less than 1*5 and viscosities less than 50 centtpoise. Although
there^ were no contractual toxicity requirements, the agent toxicity was a necessary consideration to provide a system which is
safe for operating personnel. As shown in Table XV, certain of
the pesticides have high toxicity. This toxicity dictated that
the MISS agent transfer system be sealed to prevent agent or
agent vapor leakage inside the aircraft. As a result, sanitarytype plumbing connections were used throughout the system and
the tankage venting system was sealed and designed to vent harmful
vapors overboard.
Many of the wettable powder and suspension-type agents tend to
settle if not agitated constantly. Agitation can be mechanical
or can be accomplished by agent recirculation of at least 10 percent of the tankage volume per minute. The recirculation method
was chosen for the MISS since it could be easily and inexpensively
accomplished with the MISS centrifugal pump dissemination system.
The MISS can rccirculate. over 500 gpm (250 gpii through each 500gallon tank) and therefore provide 50 percent tank volume
recirculation. In addition, the tank agent pickup lines are
designed to provide maximum agitation at the bottom of the tanks,
allowing remixing of any settled agents.
The contractual requirements for suspension and slurry-type agents
also dictated the use of abrasion-resistant materials and mechanical-type pump seals in the agent transfer system.
"Of particular interest is the capability requirement for slurrytype agents. Investigation into the various possible agents
showed that the only true slurry-type agents were certain advance
fertilizers which exhibited thixotropic viscosity characteristics,
as shown in Figure 39. As can ba seen, thes&lt;* fertilizers had
viscosities well above the 350-centipoiso contractual limit. In
addition, these fertilizer slurries were extremely abrasive and
would severely limit mechanical component lifts if used.
Table XVI shows several of the MISS agents and their typical
application rates. As can be seen, they all fall within the 3
ounces to 3 gallons per acre contractual application rate requirer.ent.
4.2.2 Agent/Material Compatibility
The chenical nature of the applicable MISS agents dictated certain
r;ysten rwitcrials. Several materials were laboratory tested at
r^on ter^erature and reflux temperatures with the chemical agents.
:;',tii t.k;o corrosive and solvent action of the materials were

�TABLE XV.

PWU-5/A MODULAR INTERNAL SPRAY SYSTEM AGENTS

SPECIFIC
GRAVITY

AGENT NAME

VISCOSITY,
Toxicmr*
DENTIPOISE tD5B, mg^g

DEFOLIANTS
AGENT ORANGE
ARENT IHITE
AGENT BLUE

1 .28
1.14
1.336

&lt;uo
12.5

550
3 030
1 .600

HERBICIDES
TANDEX

1.5

350

3.000

36
&lt;50

2.800
190-350
450
135

PESTICIDES
MA LATH ION
FENTHION
OIBROU
OURSBAN

1.2315
1.245
1.842-1.846
1.062-1.175

FERTILIZER
N-Sol 32 (Urea~NN 4 NQ3)
UREA SOLUTION 504.
AMMONIUM PHOSPHATE
14-14-14 SUSPENSION
*

•UWIT 10JUC tO w = 1-20

45*

1.327
1.158
1.36
1 .404

43

28

3-18

20

2.0, 1.8

MOOU4IUY T O X I C lOy) = IW-7SD

29
280

NONE
NONE
NONE
&gt;5000

PRODUCT FORM
LIQUID
LIQUID
WATER SOLUTION

*P
EC, IP. LO*
VOLUME (LV)
LY

LV. EC, DUST

EC,

WATER SOLUTION
WATER SOLUTION
WATER SOLUTION
WATER SUSPENSION

SUGHUY TOXIC IDyj = 600*3000

�30,000

20,000

10,000

5,000

C9
C^
V*

1,000

,

0

10

20

»

«0

SHCU RITE. IteWFtflB RN

Figure 39. Thixotropic Nature of Slurried Fertilizer

86

�TABLE XVI.

AGENT
CONTRACT REQUIREMENTS

AGENT APPLICATION RATES

APPLICATION RATE
3 02 TO J (UL/ICHE

PRODUCT FORM
SUSPENSION. SOLUTION, SLURRY

DEFOLIANTS
ORANGE

3 GPA

.LIQUID

WHITE

3 GPA

LIQUID

BLUE

3 GPA

WATER SOLUTION

HERBICIDES
TANOEX

1-2 GPA

WET TABLE POWDER

PESTICIDES
MALATHION

3 OZ/ACRE

LV

FEN TH I ON

6 OZ/ACRE

LV

OIBROM

3 OZ/ACRE

LV

DURSBAN

3 OZ/ACRE

LV

FERTILIZERS
UREA

IIHWU

3 GPA
1-2 GPA

87

WATER SOLUTION
WATER SUSPENSION

�investigated, and the results of these tests were combined with
previously collected data to analyze the select cost-effective
piping, valving, tankage, sealing, and hose materials. The
results of the most applicable tests are shown in Table XVII.
Previous studies involving defoliants for military use indicated
that Agent Blue has a heavy corrosive action upon aluminum and
eliminated it as a candidate material without costly and troublesome protective coatings. Investigations of MF-1, 401, 301, 304,
and 316 stainless steels indicated the use of 304 or 316 stainless
for tanks and piping. The 304 was selected as being more cost
effective.
Several .plastic and elastomeric materials were investigated for
use as seals, bushings, valves, hoses, etc. The results indicated
that Teflon* , nylon, and cross-linked polyethylene were the most
stable plastics, while fluorosilicone was the only truly acceptable elastomer (mostly due to the Xylene content of certain. .
insecticidesy.
Another problem concerning agent-material compatibility is the availability of the compatible materials in a usable and cost-effective
product. As an example, cross-linked polyethylene is cost-effective and was used for high-pressure hoses, but it is not available
for seals or flexible enough for suction hoses. Teflon9 was used
for the centrifugal pump mechanical shaft seal and several valve
seals (suitably reinforced with isolated elastoraeric material),
since it was chemically compatible and available from manufacturers
in those product forms. Cuctom seals, such as for the tank manhole,
were compression molded from fluorosilicone. Nylon was utilised
for nozzle valves. Silicone, reinforced with fiberglass cloth,
was selected for the dump and vent hoses after laboratory testing
with pure Xylene. Teflon® could have been used but was prohibitively expensive.
4.
1

AfiENT TRANSFER SYSTEM

The agent transfer system consists of all those components which
contain, move, or control the agent on board the aircraft.
Section III of this report contains a description of the final
MISS agent transfer system and the related pneumatic and electrical
systems. The MISS Operation ami Maintenance Manual contains a
complete description of "eacn agent transfer system operation.
Several najor design changes were made to the agent transfer system
during the course of the contract. Changes were nade to either
increase system flexibility and performance or decrease cost.
From the origination of the contract, a gasoline engine-driven
centrifugal pump was selected as the best mechod for moving the
aocnt. A pneumatic agent expulsion system was considered, but it
was el initiated due to the complexity and danger of such a system

88

�TABLE XVII,

PWU-5/A MODULAR INTERNAL SPRAY SYSTEM AGENT COMPATIBILITY

'INSECTICIDES

SUBSTRATE

DIBROK

MALATHIQN

HERBICIDES
OURSBAN

ORANGE

r

WHITE

BLUE

FERTILIZERS

;
«

•ETUIS

"UNCHANGED

ALUMINUM
MIL3 STftL (UXUKEO)
STAINLESS STEEL

;

NOT SIQ.
SIG.

HIUH SIG.
. ,

SIG.

KOT SIG.

"%t NOT SlGv
'316 NOT SIG '

PLASTIC

HOT SIQ.

•NOT SIQ.

*0 EFFECT
NO EFFECT
NOT SIG.flF
SIG.
ACID FREE)
PASSIVE COAT ING FORKED

y. SIG.
SIC.

IN

KANT CASES.

EROSION FROM
ABRASION
NOT 5|&lt;i.
EXCEL. ABRASIVE RESISTANCE

*

NYLON 66

UNCHANGED

?LEXIGLAS

N.A.

;

.

UNCHANGED

*UVEMT CRACK'S t DISSOLUTION EVIDENT

NOT SIO.

UNCHANGED

POLYPROPYLENE

WITHSTANDS SOLVENT SWELLING I CRAZING

V. SLIGHT

WITHSTANDS SOLVENT SWELLING I CRAZING

CRQSSL INKED POLYETHYLENE

SLIGHT

SLIGHT

SLIGHT

WITHSTANDS SOLVENT SWELLING ( CRAZING

MO.riEO CRCSSLINKED POLYETHYLENE
TEFLON .

NOT SIQ.

NOT SIQ.

NOT SIQ.

WITHSTANDS HERBICIDE AGENTS

UNCHANGED

UNCHANGED

UNCHANGED

DOES XOT REACT WITH STD AQ CHEMICALS

SIQ.

SIQ.

V. SIQ.

SOLVENT SWELLING IN THESE AGENTS

in

N A.

VERY SIQ.

SIQ.

JOLVINT SWELLING IN THESE AGENTS

SILUONE rUMtR

NOT S'G."

NOT S'S?

NOT SI&lt;J."

T AFFECTED I'Y HERBICIDE AGENTS

FL'JCROSILiCONE RUdBER

UNCHANGED

UNCHANGED

MOT SIO.

'

NOT AFFECTED BY HERBICIDE AGENTS

~'*7AWeTH*!&lt;E

,

1
NOTES:

"AS LONG AS PASSIVATEO AND THE COATING IS INTACT.
NOT T0 BE USED FOR S10RKE.
•IF NOT F3RHUUTED WITH XYLEHi. XYLENE 25 PERCENT SHELLS.

C

.

�because a pneumatic expulsion system could not provide agent
agitation as required for the various wettable powder suspensiontype agents. A centrifugal pump was selected for its inherent
safety (can be run at stall conditions) and because it cou,ld pump
suspension-type agents without being damaged.
Figure 40 shows the agent transfer system schematic as originally
proposed. This system used a single agent reservoir assembled
from two end sections and several center sections depending on
the load-carrying capacity of the aircraft. Filling was done
directly into the tank using peripheral ground support equipment.
Tandem centrifugal pumps were used and agent control valves were
electrically operated. A single electromagnetic induction-type
flowmeter was used to monitor agent flow. Wing boom nozzle valves'
with spring-loaded poppets were proposed to seal agent at the
nozzles when dissemination was stopped. One large dump valve was
employed, and an air tank was used to pressurize the tank during
emergency dump to decrease dump time.
Detailed investigation of the center-of-gravity requirements for
all ten aircraft indicated that a single tank could not adequately
maintain fluid center of gravity, and a multiple tank concept was
generated. Two sets of tanks were used, one set on each side of
the power module. Each set of tanks was connected in series, and
each set was provided with its own pickup (power module pump
suction) and recirculation connections. By providing each tank
with a remotely actuated vent valve, fluid movement could be
controlled by opening or closing certain tank vents. Closing^all
tank vents prevented movement of agent between tanks and fulfilled
the aircraft center of gravity requirement. Opening the vent'.1 on
the tanks furthest from the power module (outside tanks on both
sides) allowed the tanks to sequentially empty from the furthest
outside tanks to the tanks nearest the power module during dissemination. Closing the end tank vents when dissemination was
stopped prevented further agent movement between tanks even with
the agent being recirculated through both sets of tanks. This
multiple tank concept with tank vent valves was utilized in the
final PWU-5/A Modular Internal Spray System.
Figure 41 shows the multiple tank system as used in the second
major agent transfer system concept, which included several major
changes over the original concept (Figure 30). A single large
capacity centrifugal pump replaced the previous tandem pumps to
decrease hardware costs and weight. The centrifugal pump was
also used to suction fill and power drain the system, and a small
ground pump was used for pump priming. Agent control valves were
pneumatically operated with air being supplied by a pneumatic
system built into the power module. The emergency dump valves on
each tank were also pneumatically operated, but the air pressure
was supplied by an isolated air reservoir which would maintain
pressure even if the primary air cystem failed (leaked). The
concept of pressurizing the tanks during emergency dump was eliminated due to the large volume of compressed air required and the

90

�RECIRCULATE VALVE

VO

SPRAY
BOOM

I-

&lt;Sert
DRAIN—/

Figure 40.

Agent Transfer System (Original Proposed Concept)

�'iWO-WAT

M CHECX VALVE

-Jxt! THXEE-WV

—V

vO

COUM.IKOS

FOUR-WAT
A

HOZZLE

H

^ VALVE, niEUMATIC

;:

D

SL VALVE, SOLEKOIO

Jfr"

1'

Figure 41.

-w-

VALVE, HAHUAL

O FLOW HCTEI

1

-c*-

VALVE, CLEC. HOTM

H

Agent Transfer Systen (Second Concept)

�system complexity. Tank vent valves were electric motor-driven
bali valves, selected to minimize hardware costs and complexity
ajard also provide positive feedback indication of their open or
closed position to the operator control panel. An electromagnetic
induction flowmeter was used in conjunction with a flow totalizer
to indicate total fluid volume on board' at ahy'-tfiven time. Pneumatically assisted diaphragm check valves were installed at each
wing boom nozzle to provide absolute agent shutoff after dissemination and assure no agent leakage at the nozzles even when the
aircraft underwent maximum airborne maneuvers.
The agent transfer system was further refined as shown in Figure 42.
As a result of flow model tests (paragraph 4.4 of this report),
the pneumatically operated recirculation line valves were eliminated and the agent pickup (tank suction) valves were—changed from.....
pneumatically operated to manual in order to reduce system
complexity. The small ground pump, used to prime the main centrifugal pump, was eliminated in favor of an air-activated eductor
which used the primary power module air system pressure to create
a vacuum in the centrifugal pump and draw agent into the pump.
Adoption of the eductor greatly simplified the cys'cem and ground
support operations and allowed the centrifugal pump to be easily
primed at any time.- even if prime were lost during system
operation.
Figure 43 shows the fourth agent transfer system concept. The
pickup tubes inside the tanks were changed so that both tubes in
each tank picked up agent off the tank bottom. This was done to
increase system flexibility by allowing the suction and recirculatio'h connections at the tank to be interchanged for ^different aircraft applications as required. Also, this positioning of the
tubes provides maximum agitation (during recirculation} at the
bottom of the tank to insure complete nixing and suspension of
wettable powder-type agents. The electromagnetic induction flowmeter system was eliminated because several spray agents did not
exhibit sufficient electrical conductivity, the induction flowmeters could not withstand airborne.vibrations, and the peripheral
equipment for the induction flowmeters was extremely heavy and
co'stly. Dual turbine flowmeters were selected to monitor agent
dissemination rate. The low volume system reads agent flow rates
from 0 to 60 gpm and includes a fine mesh agent strainer. The
high volume system reads 0 to 600 gpm. Dual flowmeters were
required to meet the +5.0 percent agent flowrate monitoring
contractual requirement. The fill bypass system was eliminated
with on-board agent volume being indicated by separate liquid
level sensors in each tank. An air purge system was added to
allow purging of the wing boom system after final mission dissemination.
For the final MISS agent transfer system, the recirculation line
check valve was eliminated as a result of preliminary system
tests, and the low volume agent strainer was moved upstream of
the flowmeter to prevent foreign matter from fouling tht: flowmeter
turbine.
93

�AIU BUHP srsuis MOT JHII»)
Yt«

*»wfe

LEGEND:

r

vo

VALVE. HW8AL

TMIITIU

*=£»
^ttitei
=

VALVE. MOTOR ACTUATED

=

VALVE. PKEtWWTIC
ACTUATED

=

CHECK VALVE

nil

fMT

tUtl

Figure 42.

Agent Transfer System (Third Concept)

�4g

T_ig

TANK VENT
(TYP

FILL

PICKUP

PICKUP

r&gt;
RECIRCUUT

PMUp

(PNEUMATIC S DUMP SYSTEMS
HOT SHOWH)

21
DRAIN

LEGEND:

EHUCTOR
100 PSI AIR-OJ

VALVE, MANUAL

*

H.V. FLOKMETER

L.V. FLOWMETER

^

VALVE, PNEUMATIC

H.V. THROTTLE

L.V. THROTTLE

loo MESH STRAINER!!

VALVE, ELECTRIC MOTOR
y^-Tj SPRAY VALVE
CHECK VALVE

AIR PURGE - 100 PSI AIR

£H

Figure 43. Agent Transfer-System (Fourth Concept)

�•4 ..48

PLASTIC AGENT TRANSFER SYSTEM PLOW MODEL

To investigate all phases of operations of the multi-tank agent
»transfer system concepts, DTL built the one-quarter scale plastic
flow model shown in Figure 44. The model utilized eight agent
reservoirs and was equipped with all the piping, valving, and
electrical controls required for complete system operation. The
tanks had a scale volume of 325 gallons each.
Figure 45 shows the flow model schematic and controls. The
following operational modes were investigated with the model level
and with the model sloped to the horizontal (aircraft nose up or
nose down): •
*•&lt;
•

Suction filling

•

Recirculation/agitation

•

Dissemination with and without recirculation

4-4.1

Suction Filling

To suction fill, the pump was switched on&gt; and the fill switch was
thrown. This opened all tank solenoid vent valves and closed the
pickup shutoff valves. The recirculation valve was manually
opened. To prime the pump the 55-gallon drum we^s pressurized to
2 psig, forcing agent through the suction fill recirculation line
into the reservdirs. When filling at a scaled flow rate equivalent
to 350 gpm, the outermost tanks filled slightly faster than the
innermost tanks. As each tank filled, its magnetic float closed
the upper reed switch, closing that tank's vent valve, which
prevented further filling of that tank. When all tanks were
filled, the recirculation switch was thrown, opening the pickup
shutoff valves, causing the system to enter the recirculation
mode. The suction fill valve was then closed by hand, and the
fill switch was turned off.
When filling with the model on an angle to the horizontal (such
as the C-47), the lower tanks filled first due to the fluid head
caused by the upper tanks. Closing the lower tanks' vent valves
prevented those tanks from filling and allowed the upper tanks to
continue filling.
4.4.2

RGcirculation

In the recirculation mode, agent was pulled from the innermost
tanks by the pump and forced into the outermost tanks. In full
recirculation, the model pumped at a scale flow rate equivalent
to 600 gpm, moving 300 gpm through each tank. Thus, each tank
had a 90 percent volume/minute recirculation rate (300 gpm/325gallon capacity).

Qfi

�*

-j-r*

vo

Figure

.44,- Plastic Agent Transfer System-Flow Model

i . &gt;__ —1 .

As"**"*-**.*

�•SOLENOID VENT VALVES

^y?^xjf
CENTRIFIGAL
ELECTRIC
PUMP

DISSEMINATE
VALVES

SUCTION FILL LINE

oo
PRESSURE &lt;USE;0MLY

INITIALLY PRIME PUMP)
RECIRCULATIQN
VALVE
POKER

OK

FILL

OISS.

RECIRC

DISSEMINATE LINE
MANUAL VALVE

I

1

lAJ SOLENOID VALVE
O—"O REED SWITCH
(-&gt;

Figure 45.

) MAGNETIC FLOAT

Plastic Flow Model Schematic

:

�The fluid level in each tank remained constant regardless of model
orientation since sach tank vent was closed.
To test the mixing capability of the scaled 1300 gpm' through each
tank, dye was introduced into one end tank. With all tanks onehalf full, the dye dispensed evenly through the first four tanks
within 1-1/2 minutes and through all eight tanks within five
minutes. With all tanks full of fluid, the dye evenly dispersed
throughout all eight tanks within nine minutes.
4.4.3

Dissemination

..When the dissemination switch was thrown, the solenoid dissemination valve opened disseminating the fluid into the 55-gallon drum,
and the two outermost tank solenoid vent valves opened. Various
dissemination rates were tried up to a scale 600 gpm.
While disseminating, the outermost tanks emptied first, then the
next outermost, etc. As the innermost tanks emptied, their pickup
shutoff solenoid valves closed independently just before the pickup tube started to suck air. This arrangement assured maximum
agent would be disseminated in case the tanks were filled somewhat
unevenly. When disseminating with the model on a slope to the
horizontal, the upper four tanks emptied slightly sooner than the
lower four tanks, but nearly all agent was disseminated due to
the automatic pickup shutoff valves. This automatic pickup shutoff concept was later eliminated from the final system concept
"due to complexity and expense.
The dissemination process was identical with or without recirculation. When recirculating through an empty tank, the fluid passed
right through the tank and did not fill it, since fluid was being
withdrawn at a faster rate than it was being introduced (dissemination+recirculation-recirculation).
4.5

TANK MODULE

The modular concept of the MISS dictated that as many components
and parts of the system be designed in such a manner that they
could be assembled together in appropriate combinations in order
that the payload capacity of each aircraft be exploited. The
agent reservoir, as a primary part of the system, received the
closest attention in modularizing the spray system.
First, the .maximum pay load capacities of the four primary arid six
secondary aircraft were obtained. The estimated weights of the
power module, spray booms, and interconnecting plumbing were
subtracted from those payload weights to obtain the estimated
specific gravity of 1.0 or Water at a nominal 8.34 Ib/gal. If
specific gravity 2.0 agent is used, the agent volume in the tank
would be halved. Coincident with the weight analysis, dimensional
constraints were evaluated to establish the width, height, and
length of the power module and agent reservoir.
99

�Secondly, these estimated weights and dimensional requirements
were applied to ths power module and agent reservoir, and various
cargo* compartment arrangements were made for all aircraft. It
soon became apparent that the. control of the aircraft center of
gravi'ty was of critical importance. The center of gravity of
each aircraft had to be within very specific limits from empty to
full payload capacity. Since the agents to be sprayed were liquid,
constraints against its movement during aircraft flight were also
to be imposed. For this reason, the original tank concept, as
shown in Figure 46, was abandoned.
The approach was then taken to place the pov/er module on the
center of gravity and split the agent into two series of tanks,
one set forward and one set aft of the power module. By extracting
from both sets of tanks at the same rate during spraying, the
aircraft center of gravity would not change from full to empty.
The tanks are separate, connected only by an agent transfer tube
at the tank bottom with each tank's vent being individually
controlled. Closing a tank's vent prevents movement of agent
into or out of the tank. This solves the problem of slosh or
movement of agent between adjacent tanks.
During dissemination, only the vents on the tanks furthest from
the power module are opened, allowing the tanks, to empty
sequentially from the outside tanks inward.
The first split series tank module concept is shown in Figure 46.
The tanks had a capacity of 325 gallons each and were 42 inches
in diameter. The cradle was designed with captive castors; integral
dump, vent and recirculation lines; and built-in ferklift slots.
The tank ends included agent inlet and outlet tubes and an integral
emergency dump valve. The fill port was offset to reduce the
module height.
Upon further study, it was decided to change the tank capacity to
500 gallons by increasing its diameter to 48 inches. Tfyis was
done to substantially decrease the number of tank modules in each
aircraft installation, and thus reduce cost, parasitic*hardware
weight, installation time, and system complexity. The inlet and
outlet ports were moved underneath the tank (Figure 48) to allow
both end-to-end and side-by-sido installation possibilities.
The inlet and outlet tubes were curved up, over, and down inside
the tank to provide maximum recirculation agitation at t»ie tank
bottom and to allow either tube to be used as the suction port.
Using the 500-gallon tank concept, the nearly finalized tank
nodule was generated, as shown in Figure 49. Because the tanks
were designed for the possibility of side-by-side installation,
the integral dump, vent, and recirculation lines were removed.
A completely new, lightweight cradle was designed and included
captive castors, lifting jacks, and forklift slots! Eye bolts
v/ere provided for sling lifting and aircraft tie-down. An

100

�"V" BAND

FWD

RECIRCULATION MIXING JET

EMERGENCY
DUMP VALVE

Figure 46.

Tank Module (Original Concept)

�POWER MODULE

Figure 47.

Split Series Tank Module (First Concept)

�o
CO

IHLET AND OUTLET PARTS-

Figuire '48.

500-Gallon Tank

�FILLER CAP
VENT VALVE ACTUATOR
FILLER CAP

TANK

TIE DOWH EYES

SCREW JACK
FORK LIFT

ELECTRICAL JUNCTION BOX
DUMP VALVE

•RETRACTABLE CASTORS
Figure 49.

500-Gallon Tank Module

�electrical junction box was provided for the liquid level indicator
and motor-driven vent valve electronics. Both the electrical cable
and dump valve air connections were designed to allow the tanks to
be connected in scries to minimize wiring and air hose connecting
errors and simplify installation. The tank fill port was increased
in size to three inches and a screen was added to trap foreign
matter if the tanks were filled through their fill ports. The
fill cap, liquid level indicator, and tank vent were mounted on a
manhole cover, and the manhole was sized to allow entry into the
tank if desired. An internal agent slosh baffle was added which
consisted of a curved, perforated sheet in the center of the tank,
covering the bottom half of the tank's circular cross-section.
This plate was designed to adequately control slosh at minimal
cost and weight by taking advantage of the inherent strength of
a curved sheet.
.
—
The final MISS tank module was the same as shown in Figure 49
except the vent line and valve were increased in size from 1 to
2 inches in diameter to decrease emergency dump time.
Detailed evaluation of reservoir and power module arrangement in
each aircraft is presented in paragraph 4.1. As can be seen from
Figures 15, 20, 21, 22, and 23 of paragraph 4.1, slight variances
from the concept of symmetrical tanks around the power module were
necessary to insure compatibility with all aircraft.
4.6

POWER MODULE

The power module must contain plumbing, valving, electrical
diagnostic equipment and controls,'and a._power''SQurce andjnust be "
designed to mate with all aircraft configurations and meet, floor;-,
loading requirements. During the design" and development effort,
consideration was given to ease of operation, accessibility of f
components, balancing of fluid paths, and weight and safety
~
requirements.
Several preliminary and subsequent designs of the power module
were made to incorporate the various system changes. One early
design is shown in Figure 50 and incorporated J£h.e PE90-7 engine
which was also used on the final design*,. It-had an electromagnetic
induction flowmetar which was later eliminated in favor of dual
turbine-type flowmeters. Captive castors and lifting jacks were
incorporated to simplify aircraft installation and removal. The
operator seat was attached to the power module,, with the control
console located as shown.
The power module, which is almost finalized, is shown in Figure 51.
This module was designed by taking all necessary components and
generating several sketches of different plumbing positioning
concepts. The most functional design was selected, and the actual
hardware assembly was fabricated. During fabrication, the cradle
was simultaneously designed and fabricated to adequately support
the various components. All controls were positioned within easy

105

�CONTROL CONSOLE

PE9Q-7 AIR-COOLED 1KG IHE
(fSN 2805-633-6689)

FLWHETER

^OPERATOR'S SEAT
(REMOVED FOR CLARITY)/""^.
PULLET
(BELT GUARD OHITTW
FOR CLARITY)

A I* COMPRESSOR

DISSEMINATION LIKE
OII-OFF VALVE
OISSLHIKATION LIME OUTLET
01 SUM I NAT I ON LINE XAKUAL THROTTLE VALV
PICKUP LINE ON-OfF YAL?E (?. PLACES)

tECIRCUUTIOII LINE MANUAL TffltOTTlE SALTS
CElTRfFUOAL fUMP

Figure 50.

RtCIRCULATION LINE OII-OFF VALVE (2 PUCES)

-&gt;

Power Module (Early Design)

�DISSEMINATION

RtCIRCULATION

TANK SUCTION

SCREW JACK

COMPRESSOR

PUMP
RETRACTABLE CASTORS (»)

Figure .51.

Pow^r Module (Later Concept)

�reach of the operator, and the operator seat was designed to be
positioned in front of, and separately tied down from, the power
module. The control box was designed with a hinged panel to
permit easy access to the control box components.
The final MISS power module design (see Figures 5, 6, 7 and 3 in
Section III of this report) included some minor cradle and plumbing
changes. The lower cradle channels were inverted to provide
better aircraft floor loading, angled corner cradle supports were
replaced with gussets, an idler pully was ad&lt;3ed to the air compres"sor drive belt, and the system battery and emergency dump air
reservoir were added to a structure behind and above the control
box. A circuit breaker box was added below the main control
panel, and a second primary air reservoir, was ..added underneath
'tffd pump drive train.
4.7

INTERNAL PLUMBING

The MISS internal plumbing includes the tanks/power module agent
hoses, the dump, vent, and engine exhaust systems, and the internal dissemination hoses and hardware. Laboratory agent compatibility tests were conducted on agent hoses to determine acceptable
materials (see paragraph 4.2 of this report). For actual locations of internal plumbing on the various aircraft, see the
respective aircraft Class II modification documentation.
4.7.1 Agent Hoses
Two types of agent hoses are required: High pressure hose used.,
for agent dissemination and recirculation, and, suction hose used
to connect between the tanks and to connect the power module to
the inside tanks. These hoses must be compatible with all MISS
agents. In addition, the hose must be flexible enough to allow
connection at the desired points.
As a result of preliminary laboratory chemical agent compatibility
testing, Teflon*- or nylon-.lined hoses were determined to be
acceptable. A survey of available hoses indicated that nylonlined hosas were not manufactured to rr.eet the MISS requirements,
and TetIon* hoses were extremely costly. Further research indicated that a cross-linked polyethylene-lined hose was available
to meet the 100 psi high pressure hose requirement. Although
extremely stiff, this hose waa selected to reduce costs without
sacrificing system performance. A Teflon®-lined duct was
selected for suction line applications, and tha system was
designed accordingly.
The cross-linked polyethylene-lined hose worked perfectly during
the remainder of the program, but the Teflon*-lined suction duct
exhibited both leakage at the Teflon* liner seam and suction
collapse of the liner. After several attempts by the manufacturer

108

�to correct these problems, they discontinued their effort and
agreed that their product was misrepresented and should not be
for fluid service,
Th«j failure of the suction duct created a problem because it was
'rejKttKsanely flexible and the suction portion of- the system had been
diasigned around this duct flexibility. The resulting search
indicated that no hoses were available to meet the chemical
compatibility requirements, match the duct flexibility, and be
relatively inexpensive. As an interim solution, vinyl hoses were
provided on the prototype system. Vinyl is not compatible with
all agents but sufficed for Air Force system flight testing Using
glycerin and water as an agent simulant. An all Teflon® hose was
located which met the compatibility and flexibility requirements,
but was extremely expensive and lacked good seal-ing at the end
fittings. The final solution to the problem was an all stainless
steel bellows hose with the end flanges welded on. This hose was
then specified for all MISS suction hose applications.
-

-

4.7.2

~*

Internal Dissemination Hardware

High wing aircraft had to use two fuselage hose assemblies to
feed the separate wing boom assemblies, and it was decided to
design the spray system to include fuselage spray stations at the
jump doors. For lower performance aircraft such as the C-123,
this was accomplished by constructing a stainless steel tee which
was bolted to the cargo floor using existing cargo tie-down points.
This tee was designed to accept the single 3-inch-diameter dissemination hose from the power module and distribute the agent to
:&gt;
'the twin fuselage hose assemblies.
',"
'".
•
JAt the point of attachment of the fuselage hose assemblies, nozzle
spray stations were incorporated. For high performance aircraft
such as the C-130, twin 3-inch hose dissemination lines from the
power module were connected to individual elbows which subsequently
fed the fuselage hose assemblies and the fuselage spray stations.
For low wing, low performance aircraft such as the C-47, a single
2-inch dissemination line was run from the power_;module, out through
the side cargo door, under the fuselage, and connected directly
to the wing boom system. Since nozzle stations were placed
uniformly along the wing boom system, including under the fuselage,
fuselage spray stations were not required.
4.7.3

Dump System

The dump system was Originally conceived as exhausting through
the aircraft rear jump door to eliminate metal-cutting operations.
The Mse of modular tanks which could be installed in various
configurations then dictated that the dump system also be modular.
To achieve this, a 10- inch-diameter silicone-coated glar.s duct was
selected for the main dump duct which has sufficient capacity to
accept four tank module 4-inch-diameter dump ducts. A -i2-inch

109

�nodular length was selected for the 10-inch duct, and connections were mede to the 4-inch-diameter tank dump ports with
stainless steel tees and band clamps. A dump chute was located
at the jump door which projected about 12 inches into the windstream to minimize dump contamination of fuselage. This dump
chute was beveled at 4b« facing aft to allow the windstream to
create a slight vacuum condition in the dump line and thus reduce
dump time. The dump chute was designed to be mounted with a plate,
which was bonded to the aircraft floor with silicone adhesive.
4.7.4

Vent System

The vent system consists of modular lengths of a main 3-inch•diameter silicone-coated glass duct attached to the 2-inch-diameter
tank vent ducts with stainless steel tees and band clamps. The
tank vent hoses and vent valves were originally designed as 1-inch
diameter but were later changed to 2-inch diameter to decrease
dump time. A vent chute was utilized in the aft jump door which
projected into the airstream. This vent chute was chamfered 30°
facing forward to allow slight ram air pressurization of the tanks
to decrease emergency dump time.
4.7.5

Engine Exhaust

The engine exhaust was ducted from the engine spray arrester to
the exhaust chute at the aft jump door using 3-inch-diameter
silicone-coated glass duct. Due to the Air Force objection to the
silicone glass duct, it was replaced with asbestos-packed stainless
steel exhaust hose. For certain aircraft such as the C-123, the
exhaust hose was? secured to the overhead pa!heliivg,usTng mounting
brackets,'bonded to the aircraft with silicone adhesive! For
other aircraft, the exhaust hose was secured tc existing aircraft
internal structure using standard hose brackets and band clamps.
4.8

EXTERNAL PLUMBING

Aircraft external plumbing includes the nozzles and nozzle valves,
wing boom system and fuselage hose assemblies. Complete descriptions and installation instructions for the various aircraft MISS
installation wing boom systems can be found in the applicable
aircraft Class II modification documentation. During the MISS
program, Class II modification documentation packages were generated for the C-47, C-123, and C-130 aircraft.
4.8.1

Nozzles and Nozzle Valves

The original nozzle/nozzle valve approach is shown in Figure 52
and used a spring-check valve method of sealing the nozzle when
dissemination was terminated. The nozzle and valve were customfabricated parts. This concept was abandoned when further investigation of the sealing pressure requirements at the nozzle valve

110

�S'.
..

NYLON OR STAINLESS
STEEL CAP

STAINLESS
STEEL
COMPRESSION
SPRING

NYLON OR
STAINLESS STEEL'
POPPET
NYLON OR STAINLESS
STEEL BODY

Figure 52.

Check Valve-Type Nozzle

11
1

�indicated that a spring-check valve could not seal against agent
presssures generated within the wing boom when certain larger aircraft saw maximum lateral airborne g-loadings. In addition, the
custom nozzle approach was expensive and did not comply with the
concept of using readily available hardware when possible. .
Research of standard valves revealed that an inexpensive, small
diaphragm check valve was available (Figure 53). The checking
function of the valve was increased by supplying compressed air
behind the diaphragm at all times except during spraying. When
air pressure is not available, such as during aircraft downtime,
the check valve spring will continue to seal up to 5-psig agent
pressure to prevent leakage at the airfield. The valve is fail
safe in that it will allow spraying even if the air source fails.
In addition, the inherent design of the valve prevents "water
hammer" in the dissemination pluiribing. After testing and
rejecting Teflon'*' and silicone, a fluorosilicone diaphragm was
added to the agent side of the standard fairprene diaphragm to
insure chemical compatibility with the agents. (See Category I
Reliability Test Reports in Appendix II of this report.) The
complete nozzle valve assembly was successfully cycled through a
5-year life during Category I testing, and the ability of the
valve to prevent water hammer was also demonstrated successfully.
Standard, inexpensive, and readily available vee-type stainless
steel nozzles were selected for use with the diaphragm check
valves. For optimum droplet size control, different nozzles are
required for different spray rate ranges. ...
'•
'
4.8.2

Wing Boom System

Several wing boom constructions were considered; Round, elliptical,
full aerodynamic fairing, and aft fairing. The round pipe design
was considered to create too much drag. The elliptical was more
streamlined but presented end connection and mounting difficulties.
The full aerodynamic fairing was optimum from a drag standpoint
but required costly fabrication techniques. The aft fairing
design was selected as being the best tradeoff between drag, cost,
and complexity, and the nozzle valve nylon air line was routed
through the aft wing boom fairing.
Modular wing boom lengths of 8 feet and approximately 4 feet, with
nozzle stations spaced every 2 feet (2 each on 4-foot boom, 4 each
on 8-foot boom), were selected from preliminary layouts of the
wing boom system on all applicable aircraft. Flow rates for the
larger aircraft, such as the C-130, dictated the 2-inch-diameter
wing boom ,?,gent pipe. The C-123 required special wi.ig boom
sections to pass under the nacelle fuel tanks and were equipped
with a spray station located on the nacelle centerline to try and
fill in the spray pattern void created by the propellers. The
C-130 system used special heat-resistant, 4-foot boom sections
behind the engines which were manufactured without nozzle stations
end used copper air line in place of the standard nylon.
11 -&gt;

�OUTLET CONN.

ISLET CONN.

NYLON BODY

ALUMINUM
60NHET

AIRLINE
Co

SPRING
NL
STAINLESS STEEC
DIAPH(
DIAPHRAGM
,
FAIRPRENE ISTD.)

TAINLESS STEEL SEAT

FLOUROSILICONE DIAPHRAGM

Figure 53.

Nozzle Valve Assembly

�At first the wing boom end connections were the non^-flexible tubing
type,, but analysis of the larger aircraft indicated that a rigid
wing boom system would not be compatible with aircraft wing flexufe
during flight. As a result, a flex-type wing boom system, as
shown in Figure 54, was designed. Wing boom connect.rons allowed
axial flexing as shown but prevented axial rotation and end movement. The wing boom strut bolts were positioned to allow the
struts to sway during wing flexure, and an inboard brace was
added to prevent side movement of the wing boom. The C-123
nacelle wing boom sections were equipped with slip joints to allow
the fuel nacelles to be jettisoned, and the boom air line was
equipped with quick-disconnects which actuated after the boom
began to separate. Silicone O-rings were added to protect the
connector, seals from the agents since the standard seals were not
compatible with ail agents.
Contractor testing of the wing boom systems for the C-47, C-123,
and C-130 indicated that the wing boom self-restrained connectors
do not restrain over 100-psi pressure- when used with stainless
steel pipe, although they are rated for 150-psi working pressure.
Also, the connector seals are not adequately protected from the
agents with the added silicone 0-ring, and fluorosilicone seals
cannot be used for self-restrained type connectors. As a result,
it is recommended that the self-restrained connectors be replaced
with non-self-restrained connectors of the same type (allow boom
flexure), fluorosilicone gaskets be used for complete agent
compatibility, and the restraining function be accomplished with
external mechanical ties.
,
Three different wing boom brackets were designed to pllow attachment of the struts. One was designed to mate with the airfoil
porx/ons of the wing boom (Figure 55). This design was vulnerable
to overtorquing the nut and deforming the curved tab at the rear
of the bracket. As a result, a two-piece bracket was designed
which bolted together at both the front and rear. Another bracket
was designed to attach to the boom connectors, and the third
bracket to attach to the wing boom pipe at the nozzle stations.
Both of these designs used band clamps for attachment.., The three
bracket types were required to allow variable positioning of the
bonded mounting plates bonded to the wing surface.
A telescoping strut was designed to allow complete installation
flexibility. The strut uses a band clamp to fix its length during
system installation and is subsequently riveted after the entire
wing boom assembly is installed. The telescoping strut was
originally aluminum but was changed to stainless steel to increase
strength and chemical agent resistance.

�IING

»!NS BOOM
END VIE*
UNFLEXED

FLEXED

Figure 54. Dynamic Wing Boom Operation

�—

Figure 55.

Wing Boom Strap Assembly

f

�*&gt;8'3 Fuselage Hose Assemblies
The fuselage hose assemblies consist of the same type of high
pressure hose as used for internal plumbing and include an
external air line to supply compressed air to the nozzle valves.
The hose assemblies are attached to brackets which are bonded to
"
fuselage skin with silicone adhesive.
.rvn::
-.-..
. ;.
4.9

ELECTRICAL SYSTEM

The design of the electrical system was finalized after the agent
transfer system design was completed. The foremost design objective was to keep the system as simple as possible and thus make
it easy to understand, check out, and repair. Because the MISS
may be used in remote areas and foreign countries, the electrical
"system was designed so that it can be completely diagnosed with .....
a volt-ohm meter. These design criteria ruled out the use of
sophisticated solid state electronics; the MISS uses conventional
relays for all logic circuitry. The use of relays required more
wiring, but the additional wiring expense was justified to keep
the circuitry uncomplicated.
Ai; electrical system relays, switches, and indicator lights are
a single type to reduce logistics. Every individual electrical
circuit is protected by its own circuit breaker. All circuitry
was positioned for easy access and replacement, and each individual wire in the system is coded to correspond to the system wiring
diagram.
..4.10 GROUND OPERATIONS
Ground operations may be defined to include the following:
•

Fill the agent tanks from 55-gallon drums, open agent
containers, or tanker trucks.

•

Drain the system into above containers.

•

Flush the system, including tanks.

•

Wash down the aircraft if contaminated.

During the development effort, it became apparent that the centrifugal pump, used in the MISS agent transfer system, could be used
as the power source for all ground operations and simultaneously
reduce the quantity of ground-based support equipment. A selfpriming p.ump could have been used, but it would have required
hand priming when the system was completely dry, and it would ;
have weighed more than the non-self-priming type pumps. It
became apparent that the air supply, already on the power module,
could be used to actuate a pneumatic eductor, which, in turn,

117

�would create a vacuum condition in the centrifugal pump. By
Attaching a ground suction hose to the suction side of the pump,
the eductor could be turned off and the centrifugal pump would
continue to fill t^e system. To prevent overfilling the tanks,
each tank was equipped with a level switch which would close its
vent valves when the tank was filled. When all. tanks" in a given
system are filled, the engine magneto is shorted. to-'.ptevetnt overpressurlzation of the tanks. Turning off the fill switch allows
the engine to be restarted for recirculation and/or spraying.
Figure 56 shows an operator filling the system from 55-gallon
drums using the drum suction probe connected to the suction fill
hose. The drum suction probe is equipped with a valve which is
shut off when transferring the probe from one drum to another.
Closing this suction probe valve will cause the centrifugal pump
to cavitate but will not -cause pump damage if closed for short
periods of time. Figure 57 shows ground filling directly from a
tanker truck.
Filling the MISS with wettable powder-type agents can be accomplished by filling the system as explained above with the liquid
carrier agent and introducing the powdered agent directly into
the tanks through the 3-inch fill caps. Mixing the agent can be
accomplished by placing the system in the recirculation mode. If
the powdered agent is toxic, it can be mixed remotely using a spare
tank and power module, as shown in Figure 58, and pumped onboard
using the ground power module.
Draining is accomplished by attaching the ground support hose to
the power drain connection on the power module and using the
onboard centrifugal pump to draw agent from the tank$; and pumpt
it into the ground agent containers.
"
.
System flushing is accomplished by suction filling with flushing
agent and operating the system in the recirculation mode. To
minimize the amount of flushing agent needed, a tank washing probe
is supplied (Figure 59). This probe is attached with a hose to
the power drain connection on the power module and moved from tank
T'td-tank as required.
:
-Aircraft washing is accomplished --Jith a trigger-operated washing
gun, attached with up to 100 feet of hose to the power drain
connection. The gun is a variable spray-type, allowing the operator to select a cone spray, solid stream, or complete shut-off
as desired.
All hose/probe/washing gun connections are the quick-disconnect
type to provide leak-tight connections with minimal effort.

118

�vo

Figur'e 56.

Field Fill

�Figuro 57.

Airfield Fill

�ISJ

T^y^y^l^
gy''-Jj'
"~i m in T — -"-•--- •• ._g^-

Figure 58.

Mixing/Filling Operation with Wettable Powders

�FLUSHING PROBE

TO POWER DRAIN
OUTLET ON POWER
MODULE

Figure 59.

Tank Flushing

122

�4.11

RELIABILITY AND MAINTAINABILITY

A basic functional level breakdown of the system is shown in
Figure 60. These diagrams were generated by functionally dissecting each block. The process stops when the next dissection would
result in specific part identification.
~ • .
Analytical reliability and maintainability studies were not
completed due to a change in the scope of the contract. Several
key hardware components were cycle tested through a 5-year life,
as explained in paragraph 4.14, Category I Testing.
Reliability requirements were that the system have a probability
of mission success oC 0.99 at a confidence level of 90 percent
when disseminating an agent with viscosity of 350 .cp at. a .flow
rate of three gallons per acre.
Maintainability requirements were that the system be capable of
operation away from a military installation for periods of up to
six months with a spares kit containing only seals and nozzles.
No field or higher maintenance was to be designed for a service
life of 500 hours when disseminating agents Orange, Blue, and
White. The nozzles {excluding tips, cores, and diaphragms) were
to have a minimum predicted service life of 400 hours when
disseminating agents Orange, Blue, and White. The nozzle tips
and cores were to retain their calibration accuracy for a
minimum time period of 10 hours. The flowmeter was to retain its
calibration accuracy for a minimum period of 10 hours when disseminating agents Orange, Blue, and White.
4.12

SAFETY CONSIDERATIONS

•

Requirements specified that operational use of the dispenser
system, including ground loading, must not be hazardous to
personnel. As a result, the complete agent transfer system
(including tankage) was designed as a sealed system with all agent
vapors vented overboard both during ground and flight operations. '
In addition, both the lead-acid power module battery and the gas
tank vents were routed overboard. All power train mechanisms
{belts, pulley, etc.) were adequately shielded from operating
personnel. A centrifugal pump was used as the prime agent mover
and, due to system design, the pump could be operated at stall
conditions without danger to the equipment or operating personnel.
The power and tank nodules were provided with captive castors to
simplify system installation and removal and minimize danger to
personnel. Pressure relief valves were provided on both the
primary and emergency dump pneumatic systems, and all electrical
systems were protected by individual circuit breakers. Adequate
system instruments and controls provided the operator with
complete system monitoring capabilities. All indicator lights
were the press-to-test type.

123

�i• !

MODULAR

NTERNAL

SPRAY SYSTEM

•

I

1
POWER AND CONTROL
MODULE
STRUCTURE

AGENT
TRANSFER

STRUCTURE

INTERNAL AIRCRAFT

EXTERNAL AIRCRAFT

PLUMBING

PLUMBING

SYSTEM

RESERVOIR
MODULE

1

STRUCTURE

STRUCTURE

1

tO

1

1

EMERGENCY

AGENT

1

AGENT FLOW

SYSTEM

IHSTRUXEN-

STORAGE

DUMP
SYSTEM

r

CONTROLS

PQKER

TAT ION

r

1

ELECTRICAL

I

PNEUMATIC

Figure 60.

MANUAL

X3

o

Functional Level Diagram for the Modular Internal Spray System

;

�'

ELECTRICAL

1

1

1

I

WIRING

SOLID
STATE
DEVICES

CONNECTORS

RELAYS

1
SWITCHES

METERS

to
(J\

1

I

LIGHTS

SOLENOIDS

I
MOTORS

(•)
PNEUMATIC

1

1

I

1

1

VALVES
Figure 60.

1
VALVE
ACTUATORS

FITTINGS

REGULATORS

AIR
RESERVOIRS

COMPRESSOR

Functional Level Diagram for the Modular Internal Spray System (Concluded)

�The entire- system is structurally sound, conforming to all applicable aircraft technical orders. The internal hardware is tied
c?own to withstand normal flight and crash g loads. The external
hardware is designed to withstand the maximum flight speed of
each applicable aircraft.
*4'&gt;.i3'c*"VALtiE ENGINEERING

. . ' * • •

Throughout the development phase, the MISS was constantly analyzed
to reduce costs without compromising performance, reliability, or
maintainability. Specific examples of cost savings are:
• Used standard off-the-shelf hardware extensively.
•

Used Government-furnished engine to reduce logistic
problems.

• Selected modified cross-linked polyethylene high pressure
hose to replace costly TPE hose.
•
•

Designed the agent transfer system to adequately control
e.g. while minimizing the number of hardware components.

•

Selected 500-gallon-capacity tank modules to replace
previous 325-gdlon tanks, thus reducing costs, installation time, and plumbing complexity.

•

Replaced TFE dump and vent ducts with silicone-coated
glass at a substantial cost savings.

•

Changed flange seals to reduce seal, costs by 90 percent
without compromising performance.

•

Designed the electrical system to use a single type of
switch and relay to minimize logistics.

•
4.14

Provided complete ground support capabilities built into
the power module.

Changed to corrosion weight flanges to reduce hardware
costs and parasitic weight.

CATEGORY I TESTING

Category I Contractor Testing was performed by DTL in three
phases: Component Testing, Reliability Testing, and Reliability
Retesting. Appendix II contains summaries of these reports.
Component testing was performed to determine operating characteristics of prime system components such as the pneumatically
operated valves, eductor, air compressor, and fLowmeters. Also
included in the tests were agent/material compatibility, ground

126

�operations, 500-gailon tank sealing, and emergency dump. Reliability re-testing consisted of several cycling tests with the nozzle
valve to verify a 5-year diaphragm life.
All components tested performed as designed and exceeded the 5year life requirement.
4.15

CATEGORY II TESTING

The MISS C-123K system installation and aircraft modification was
performed at Eglin Air Force Base, Florida from 27 April 1971 to
7 May 1971,. The installation progressed smoothly/ and only a few
pieces of minor hardware were modified for improved functionability.
System flight tests were started on 17 May 1971 and included:
•

Dry system flight compatibility.

•

High volume spray, dump and manual dump using water as
an agent.

•

Full takeoff and landing (880 gallons glycerin/water
solution).

•

High volume spray at 240 gpm using glycerin/water
solution; included turns while spraying.

•

Full load flight compatibility.

• Low volume spraying.
During all tests, the system performed well with no major complications. The self-supporting features of the system proved
effective. The aircraft pilot said the system felt solid, did
not adversely affsct flight characteristics, and agent slosh was
not perceptible even with the tanks half full (maximum slosh
condition). The system operator stated the operation was simple,
straightforward, and all controls were positioned for easy
handling.
Slight spray contamination of the right aft fuselage from the
right-hand fuselage spray station was eliminated by plugging that
spray nozzle. The contamination was apparently due to the vacuum
created by the dump chute or due to the direction of the propeller
vortices, since the left-hand fuselage spray station caused no
contamination. Emergency dump contamination of the fuselage was
as expected, but some internal spray-back was apparent since the
diarap chute was mounted forward in the jump door. The dump chvte
was consequently positioned aft in the 'jump door for future MISS
aircraft designs. The pilot felt that manual emergency dumping
took too long for combat missions but would be fine for noncombat-type spraying.

127

�SECTION V
CONCLUSIONS AND RECOMMENDATIONS

1. Flight characteristics of the C-123 aircraft arr not adversely
affected by the installation of the PWU-5/A MIf.L kit.
2. Maximum payload capabilities of all ten applicable aircraft
are effectively utilized.
3. The system self-supporting features perform effectively.
4. The system exceeds required flow rates for all ten aircraft.
5. The system can be readily installed at the organizational
level" using standard tools.
6. The system is safe.
7. The spray nozzle valves effectively prevent agent leakage
during maximum airborne maneuvers.
8. The flowmeter system is functional and meets the contractual
accuracy requirements.
9.

The emergency dump system will dump at least one-half the
agent payload in 45 seconds.

10.

Operator and pilot controls provide effective system monitoring and adjustment and meet human engineering requirements.

11.

The agent transfer system provides effective recirculation
agitation.

12.

The system extensively utilizes standard, readily available
hardware.

13.

The agent reservoir design adequately prevents agent slosh.

14.

The sequential tank-emptying design allows maximum modular
installation flexibility.

15.

Attachment of external hardware and limited internal', hardware by bonding is an effective modification method.

16.

Polysulfide or polysulfide/epoxy adhesive should be investigated to replace the epoxy wing boom bonding agent; the PWU5/A MISS installation would th^n require no permanent
aircraft modification.

129

�17. The self-restraining wing boom connectors should be replaced
with non-self-restraining connectors of the same type and
used with fluorosilicone seals. Connection restraint should
bo done with mechanical ties between wing boom sections.
18. A cable system should be designed to allow manual emergency
dump operation from the operator's console.

130

�APPENDIX I
ELECTRICAL SYSTEM DESCRIPTION
X.I

MAIN POWER SYSTEM

The electrical power system consists of a 24-volt lead-acid
aircraft battery (AN3150-2A), a 30-volt carbon pile voltage
regulator (FSN 6110-373-8691), a 10-ampere maximum reverse current
relay (FSN 2925-554-6956), and a 50-ampere, 28.5-volt aircraft
direct current generator {FSN 2920-873-4396).Figure 1-1 shows a
simplified diagram of the main power circuitry.
When the generator voltage reaches 26 to 27 volts, the generator
is connected to the battery by the reverse cur-rent relay allowing
charging current to flow. The charging voltage is regulated to
30 volts by the carbon pile voltage regulator.
When the engine speed is decreased, the generator voltage drops,
causing a reverse current to flow, discharging the battery through
the generator. The reverse current relay disconnects the generator from the battery when the reverse current exceeds 10 amperes
(engine idle).
1.2

CIRCUIT BREAKERS

The main power is monitored by the ammeter before being distributed
to the secondary circuit breakers by the primary circuit breaker,
CB-1, which is a d.c. 50-ampere, medium delay circuit breaker.
The medium delay allows 'all tank vent valve motors to Start at ,
once without causing nuisance trips. The secondary circuit breakers
are shown in Table 1-1, and their delay curves are shown in'
Figure 1-2. All circuit breakers are double pole.
Each of the circuit breakers is equipped with an auxiliary microswitch which, when the circuit breaker is tripped, will light the
breaker-tripped indicator light on the main control panel. The
toggle action on these circuit breakers is trip-free, making it
impossible to hold the circuit closed against a fault. All circuit
breakers are .weather-proofed.
1.3

FLOWMETER

The flowmeter is supplied with 24-28 Vdc by circuit breeiker CB-2
through connector P-ll, as shown in Figure 1-3. Inputs from the
1-inch and 3-inch turbine meter magnetic pickups are received at
the flowmeter instrumentation package through cables W-4 and W-5.
These are two-couductor shielded cables with the shields; insulated
at the flowmeter connector an&lt;? grounded at the instrumentation
package connector.

131

�—5
AMMETER

••MEG
121

S H

pig jig

1

BAT
CUTOUT
RELAY

122

122

122

123

124
L+

J19

MAIN POWER
TO SYSTEM

I
F+

VOLTAGE REGULATOR

P19

-f—-f

0+

C8-1

ELECTRICAL BOX
POKER MODULE

Figure 1-1.

*

l-

Main Power Circuitry

�TABLE 1-1
SECONDARY CIRCUIT BREAKERS
BREAKER

LOAD ( m a x )

R A T I N G (amps)

DELAY

.080

1,00

1

3.U50

7.50

1

.3WJ

2.50

1

CB-5 PUMP PRIME

*4.920

2.50

1

CB-6 DRAiN

44.500

10.00

2

CB-7 A I R PURGE

.820

2.50

1

CB-8 AGENT LEVEL

.1*00

1.00

1

CB-9 SPRAY

5.980

10.00

2

CB-10 DUMP

20.7M3

30.00

2

19.360

30.00

2

19.360

30.00

2

CB-2 FLOWMETER
CB-3 ENGINE
CB-i* PANEL LIGHTS

OJ

CB-11 VENT
CB-12 PILOT

!

�tmi
E.-:r.T«±=:

-i^m^
pr.".'.rfi'::.Tr-T_;"._"...'.".- ^p_._~ APC oc

convc

(m

'e

^

«a|4*%M

"

-

»«

~

«»*

tat

w*

"*»

•*»

M«

w«

-

!?-"v."Mt ^ ^=?5f **f??!?'?=*^ Ml"'

B &amp;3E:
Pp||P^pa^
^.ta-t-vfe^T
I
N

^™fe^^^^F^fp^^^

—rr - -^-i
tr=;t-.tr-?i:=~
n-f--*—

r

«-

--71

,_. ~.]~ I 7.-. t ijii...rz
I
Figure 1-2.

Circuit Brea.:er Delay Curves
134

�I
I

y-JIH

PICKO.
1 INCH
MFTF1*

dU

! ff

I
1

r~ Jl 3

PI3-\

r

1
-

1

i_

L
PM —i
_
l«

/

-r-L
1

1_

P

&lt;^"
rv

_J

"*,.

\^

1

/-\

^J

i

I

*

i

V
J

PICKUP
ItCH
hETER

f"~
1 I
i
i
i •—
[
'

1

1

""
PM

FLOWMETER
IHSTRUHEHTATIOh
M3

"~"""jf
^~ PIS
1 JU-J*
-c1 1
^T
f \
—&gt;
1 L

MS
JM -v

1

i'
.
-J—

^

STUFF1MG TUBE

/

JI8-L-*-

JI-V -»•
pj-V -*J

BOX

S*^\
-^
Av

POWER MODULE

Figure 1-3.

I
* -JI2

12

s~K
rt , , _ . _ . .

V\

r

-X

1
1
1

-^

L_EI.ECTRICAL

211-28 VOC INPUT

I

\ ' .

x-JIB

.

/

Flowmeter Circuit

•

|

v_ PII
•*--P18-L
•*•-JI8-L
-»--JlJ
,

-.

�1.4

ENGINE

Power is supplied to the engine electrical controls through
circuit breaker CB-3, as shown in Figure 1-4. When the ignition
switch (S-l) is switched on, power is supplied to the hourmeter.,
and ground is supplied to the starter pushbutton (8-13?. When
S-l is in the off position, the engine magneto is grounded and
24 Vdc is supplied to the normally opened contact of the oil
pressure-actuated microswitch (S-16). If S-l is switched off
with the engine running (S-16 actuated to the normally opened
position by oil pressure), 24 Vdc is supplied to the fuel shutoff solenoid until oil pressure decreased, allowing S-17 to
deactuate to the normally closed position. This function prevents
possible engine backfiring if the. ignition switch (S-l) is switched
off with the engine operating at high throttle -settings. If the
oil pressure drops too low with the engine running (S-l), S-16
deactuates and the fuel shutoff solenoid is energized with power
from the magneto.
1.5

PANEL LIGHTS

Power is supplied to the two gooseneck panel lights through CB-4.
Each of these lights has its own intensity-controlling rheostat.
•1.6

PUMP PRIME

Power is supplied to the pump prime switch through circuit breaker
CB-5. The pump prime switch opens the vent valves on the end
tanks, removes power from the closed side of the vent valves, and
energizes the eductor air solenoid valve.
1.7

DRAIN

Power is supplied to the drain switch '-hrough circuit breaker CB-6.
The drain switch opens the vent valves on the end tanks and removes
power from the closed side of the vent valves.
1.8

AIR PURGE

Power is supplied to the air purge switch through circuit breaker
CB-7. The air purge switch energizes the air purge solenoid and
the wing boom nozzle valve air solenoid. The positive power coming
from CB-7 is in series with the spray switch so that the air purge
switch will not function unless the spray switch is in the off
position.
1.9

AGENT LEVEL

Power is supplied to the agent level system through circuit
breaker CB-8. The power is dropped through a 75-ohm, 25-watt
resistor or a 50-ohm, 25-watt resistor, depending on the number
of tanks in the system used. The total number of tanks in the

136

�—I
OIL PRESSURE-ACTUATED
MICROSWITCH
SI6

p —-

fr

*—G
PI-F!JI-F

1— '16

TB5-!)

—16—• •
SI3

P| E Jl £

20 19 17

16NIT ION SWITCH
SI

M'KJJI-K

no
NO

'

STARTER
PUSHBUTTON

I

STARTER
MAGNETO

PI6-T

T

9

FUEt
SHUTOFF
SOLENOID

lO

I HOURHETER

I
I
I
I
I
I
I

f

I
I t

JI-2

JI-Y

P l - O l^_J

LJ.

PI-Y

CB-3

»-i

10

POWER MODULE

J ;
i
I
i
I
i
I
I
I
|

Figure 1-4.

Engine Control Circuit

137

�system used is selected on the number of tanks switch (S-12) at
the top of the control panel. This switch also programs the
automatic engine cutoff circuitry for the number of tanks used.
(Refer to Figures 1-5 and 1-6.)
The agent level system consists of a tank selector switch (S-5)
and a dual meter readout (K-2). The tank selector switch receives
the incoming signals from the tank sending units.
Tanks are selected in pairs to be read out on the dual meter. The
sending units in the tanks consist of a sealed resistance comb
running from the top to the bottom of the tank (70 ohms) with a
sealed reed switch at the top. A floating magnetic runner causes
the resistance of the circuit to change and actuates the reed
switch at the top when the tank is full. The closing of this reed
switch on each tank actuates some or all of relays K-9 through
K-16, depending on the number of tanks used. The relays form part
of a 2 to 8 input "and" gate, which shuts the engine down when all
tanks are full. This automatic shut-down will only occur when the
fill switch is in the "on" position.
I.10

SPRAY

The spray function, as shown in Figure 1-7, is supplied with power
through circuit breaker CB-9 and controlled by switch S-6 on the
main control pnnel and switch S-14 on the pilot's control box.
Thuce two switches are wired in series so that the decision to
spray must involve both the operator and the pilot.
Positive power from cn-9 is supplied to terminals 2 and 11 of the
operator's spray switch, S-6. When S-6 is switched on, the operator's indicator light, L-9, on the main control panel is illuminated arid' positive power is supplied to the pilot's control box
through CB-12, lighting the operator's indicator light on the
pilot's control box, L-15. Terminal 5 of S-6 is part of the six
input "and" circuits which supplys a closed signal to the vent
valves. When S-6 is switched on, this closed signal is interrupted.
Terminal 8 of S-6 is in series with the air purge function so
that air purge cannot be operated during the spray function.
When S-14, the pilot's spray switch, is switched on, the end vent
valves are opened through power from terminal 2. Terminal 5 of
S-14 has received power from S-6 through CB-12. When S-14 is
switched on, the spray solenoid and the wing boom nozzle air solenoid are energized with power from terminal 5. Terminal 3 of S-14
has power provided by CB-9. When S-14 is switched on, the pilot's
spray, light, L-ll, on the pilot's control box is illuminated with
power from terminal 3. The pilot's spray light on the main control
panel, L-10, is also illuminated.
7o summarize this function, when the operator actuates his spray
switch, the operator's spray lights on the main control panel and
&lt;,n the pilot's box are both illuminated. When the pilot actuates
138

�TO JI6-AA

LIQUID LEVEL TANK SELECTOR SIUC.4

«

-^f.

75 OHH.20 W A T T

J4

P4

A.A A

K
K

vv—

TT, 1 1 ,-7f I

•l'

JI7.AA

M!
AGENi LEVEL
KETER

A

B

C

D

E

F

G

H

J

J4

J3

D

C

B

A

J3

A

B

C

0

E

F

G

H

J
„ -&gt;

P4

P3

0

C

B

A

P3

Rl

1
36
|

34

SO C KM. 20 W A T T

t,

.«^r:—

1j

j

J. a

2 * S2 "
^-w -*—&lt; 1 1-« *

34

PI8
Jl{

j,

6 j a

Ji

PI

G { a
i

pi

vk

OF

4 -V C8-8
-/ */

P I 8 J I 8

4* l

GROUHO

i

NUMBER

TANKS
SWITCH

35

h

f T

1—

28V DC
MAIN POWER

vo
39

HI

42 43 44 45 ' "

«&gt;
OL
UJ
1—

119

&gt;

PIS\

119

52

PI9

JI9

at

PI9

HG
.
JK

ac-j
^f

=

JI9 PI9

Figure 1-5.

Agent Level System Circuit

�f

TANK 7
+28VDC

T4NKS

TAKK

"1
x1

T&amp;NK I

1
1

1
'

ec

1^1
1=1

X

l~l
1= 1

1 ee
x

IriJ
1=1

TANK 2

1

TANK H

.TANK 5-

V /
V
6»

12

HUMBER.IOF TANKS
C-47

Figure 1-6. Liquid Level System Automatic Engine
Shut-off Electrical Schematic

—

»• TO MAGNETO

(OMLY OPERATES WHEN
FILL SWITCH IS OH)

�W I N G BOOM
A I R NOZZLE

SOLENOID

Figure 1-7.

Spray Circuitry

�his spray switch, the pilot's box and the main control panel indicators ar6 illuminated/ the end tank vent valves are opened, the
wing boom nozzle air solenoid is energized, and the spray solenoid
is energized. The same order of events occurs if the pilot's
spray switch is actuated before the operator's spray switch.
However, the first switch to be turned off is the one which
de-energizes the two solenoids and closes the vent valves.
1.11

DUMP

The dump function, as shown in Figure 1-8, is supplied with power
through circuit breaker CB-10 and controlled by switch S-7 on the
main control panel and switch S-15 on the pilot's control box.
These two switches are wired in parallel so that either the operator or the- pilot can initiate the dump function.
Positive power from CB-10 is supplied to terminals 2 and 8 of
switch S-7, the operator's dump switch. Negative power from CB-10
is supplied directly to the dump solenoid through P-l and P-21.
When S-7 is switched on, the operator's dump light, L-13, is illuminated, K-18 is energized through P-19 and D-19 cutting off the
closed vent valve signal, the pilot's dump light, L-12, is illuminated, and all vent valves are opened through S-9. The pilot's
dump switch will perform these same functions.
1.12

VENT VALVES

A logic diagram of this system is shown in Figure 1-9, and a
schematic is shown in Figure 1-10. These figures show only one
vent valve circuit since all are similar. Power is supplied to
the vent valve system through circuit breaker CB-11. When the
fill switch, S-8, is switched on, the vent valve is opened through
the normally closed contacts of relay K-l. The open indicator
light on the main control panel for that vent valve will light as
will the closed indicator light when the valve is closed. When
this tank is full, the agent level full switch is closed energizing
relay K-l. The normally closed contacts on K-l open, cutting off
the open signal to the vent valve. The normally open contacts
close providing a closed signal to the vent valve through S-8.
Besides K-l being energized, relay K-10L is also energized, which
forms part of the engine shut-down circuit when all of the tanks
are full. (See Figure 1-6.)
Only when tho fill switch is in the off position is power supplied
to the S-9 open/closed switch. This switch either opens or closes
the vent valves independent of the fill system.
The closed signal to the vent valves flows through a normally
closed pole on:
• K-18, dump relay.
• S-7, dump switch.
• S-G, spray switch.
142

�ELECTRICAL BOX

87

DI9

?!

LL&gt;
P19

JI9
-R

016

TO WIRE #28

-R

44-

• i

•52KI8
il
l

S-9
JI8-M

55

j-

i
I
l_.

J5-0

Jl-e
JI-A6

JI-M

PS-O

PS-F

PI-H

PI-AG

x-K
•
•-

DUMP
SOLENOID

'•

C8I2
-5H-

POWER MODULE

P6-G
J6-G

5552
S-,5

"

LI2
I

I P I L O T ' S CONTROLS

Figure 1-8.

Dump System Circuitry

143

TO

S-9

JI-P

86
1)21

Tf:

_ 6 ^—i

--B-j
pi-p

�RELAY Kl
ENERGIZED
FLOAT
SWITCH

OPEN

'I
"
1
I

CLOSED
RELAY
Kl

TANK
FULL

N.O.
CLOSED

I
.
J

FILL

RELAY
Kl

ON

SWITCH

OFF

POWER TO
OPEN/CLOSE SWITCH

N.C.
IN

OPEN

OPEN ;
INDICATION LIGHT

IN
CLOSED
INDICATION LIGHT

,

Figure 1-9.

VENT

OUT

OUT

PILOT'S
SPRAY
RELAY KI9

Vent Valve Control System Logic Diagram (One Valve)

a

UJ
V)

VALVE

�VEMT VALVE (IN OPEH POSITIOH)
FILL
+28V

Kl

D2

OPES/CLOSE SWITCH
S9
I
OPEM^ |

^T&gt;-2"

FILL SWITCH
SS

OFF • »
/
!
&lt;
|

"•"W
«^..j
i
I
I

K!

Figure 1-10.

Vent Valve Control System Schematic (One Valve)

�• K-ly, pilot spray switch.
• S-3, drain switch.
•

S-2, pump prime switch.

The diodes (D-l and D-2 in Figure 1-10) in the vent valve circuitry
are to prevent unwanted interaction between different tank systems.

146

�APPENDIX II
CATEGORY I
TESTING REPORTS

Category I MISP testing consisted of the following:
• Component Tests
•

Reliability Tests

• Reliability Retests
Summaries of the results of these tests are given in the following
sections. ,
II.I

CATEGORY I COMPONENT TEST RESULTS

II.1.1

Introduction

From 25 May 1970 to 31 August 1970, DTL conducted the following
MISS component tests:
1.

Nozzle Valve

2.

Motor-Driven Vent Valve

3.

Dump Valve with Actuator

4.

Spray Valve with Actuator

5.

Sealing of 500-Gallon Tank Assembly

6.

Agent/Material Compatibility

7.

Centrifugal Pump Eductor

8.

Suction Filling (55-Gallon Drums)

9.

Air Compressor

:

10.

Flowmeters

11.

Emergency Dump System (500-Gallon Tank)

12.

Emergency Dump (4 each 500-Gallon Tanks)

147

�II.1.2

Results Summary

All components met or exceeded design parameters, except emergency
dunp. The 1-inch-diameter vent valve and ver.t tubes restricted
tank venting too severely and dictated the use of 2-iuch-diameter
vent valves and vent lines. In addition, the dump chute and vent
chute, which project into the air stream through the aircraft jump
doors, were designed to allow ram air pressurization of the vent
system and a slight vacuum condition in the dump duct system With
these changes, emergency dump time requirements were met.
11.1.2.1

Nozzle Valve

The valve sealed drip tight against 58-psig water pressure with
40-psig air behind the diaphragm. With 0 psig air pressure, the
valve sealed.against approximately 6.5 psig water pressure. The
valve absolutely eliminates water hammer effects uince it readily
opens at water pressures above the nominal sealing pressure.
11.1.2.2

Vent Valve

At 24 Vdc, the average opening and closing times were 1.9 seconds.
11.1.2.3

Dump Valve

With 100-psig air pressure, the average opening and closing times
were less than 0;4 second.
11.1.2.4

Spray Valve

Opening time Ccin be varied from 0.14 to 1.06 seconds, and closing
time can be varied from 0.45 to 1.25 seconds.
11.1.2.5

Sealing of 500-Gallon Tank Assembly

All tanks were tested to 20.-psig hydrostatic pressure.
remained leak tight and structurally integral.
11.1.2.6

Agent/Material Compatibility

Agents used were:

•

The tanks

Dibrom (4.6 Ib/gal - 3 oz/acre solution)
Orange
White
Blue

Modified Cross-linked Polyethylene Hose

The modified cross-linked polyethylene hose withstood all agents
at 140°F for 3-1/2 months with no degradation.

148

�• TFE Lined 4-inch Suction Duct
The TFE liner withstood all agents at 140°F for two months without degradation. Constant exposure of the duct exterior to agents
may cause slight delamination of the fiberglass layers.
•

Silicone Vent and Dump Ducts

The silicone vent and dump ducts withstood all agents at 140°F
for one month without degradation and withstood Orange, White and
Blue for two months without degradation. The Xylene content of
the Dibrom decomposed the silicone aftar two months of constant
exposure at 140°F. This is equivalent to about eight months of
constant liquid (agent) contact. Xylene will permeate the silicone duct in six days at ambient temperature. After drying,
Xylene will repermeate the silicone after two days.
II.1.2.7
•

Eductor-Centrifugal Pump
50-Foot-Long, 2-Inch-Diameter Suction Hose

Height of
Suction Lift
57 inches
108 inches
16.5 feet

Time
to Prime
(sec)

Maximum
Fill Rate
(gpm)

Engine
RPM

15.4
17.9
26.0

145
130
125

1000
1000
1000

50-Foot-Long, 3-Inch-Diameter Suction Hose
System modification will have to be made to allow connection of
3-inch hose for ground fill - test performed for information only.
'Height of
Suction Lift
57 inches
108 inches
16.5 feet
II.1.2.8

Maximum

Time
to Prime
(seel

Fill Rate

24.4
28.5
41.0

390
390
250

Engine
RPM

(gpm)
1300
1300
1300

Suction Filling (55-Gallon Drum)

These tests were performed using the 50-foot-long, 2-inch-diameter
suction hose with the drum probe assembly attached. Approximately
one gallon of water was left in each 55-gallon drum when the probe
began sucking air.

149

�Maximum
Fill Rate
(gpm)

Time
to Prime
(sec )

Height of
Suction Lift

57 inches

20.0

108 inches
16.5 feet

22.5
27.0

II.1.2.9

Engine
RPM

75
70
50'

1000
1000
1000

Air Compressor

Engine RPM

Time to Fill All Three Air
Reservoirs to 128 psig from
0 psicf ( sec )
283
197
144
120
112

1000
1500
2000
2500
2750 (max )
II.1.2.10 Flowmeters
Size
Flowmeter
(inch)

Flow Range
(gpm)

3
3
3
3
1
1
1
1

Indicated
Flow
(gpm)

0-600
0-600
0-200
0-200
0-60
0-60
0-20
0-20

100
300
:
100
50
41
15
15
1.5

Actual
Flow
(gpm)
100.977
288.11
100.469
51.311
40.644
15.048
15.128
1.5948

Percent
Error
0.97
3.96
0.47
2.62
0.86
0.32
0.85
6.32*

II.1.2.11 Emergency Dump, Single 500-Gallon Tank
Using 1-inch-diameter vent valve and 84 inches of 1-inch-diameter
vent line, time to dump one-half a full tank was 61 seconds.
Water was used.
* Reading e rror was excessive percentage of error shown.

150

�With the fill cap off, the time to dump one-half a full tank of
water was 40 seconds.
Using a 2-inch-diameter ball vent valve with 5 feet of 2-inch vent
hose, time to dump one-half a full tank of water was 41.7 seconds.
Addition of a blower which simulated ram air pressurization of the
vent duct (about 6 inches of water pressure) decreased dump time
by about 3 seconds.
II. 1.2. 12 Emergency Dump, Four 500-Gallon Tanks
Four 500-gallon tanks were manifolded into a single 10-inch-diameter duct. Using the 1-inch-diameter vent valves, one-half the
agent (water) was dumped in 61 seconds.
With the fill caps removed, the tank nearest the dump discharge
expelled one-half of its agent (water) in 42 seconds, and the
fourth tank (furthest from discharge) expelled one-half of its
agent within 48 seconds. The average time was 45 seconds. This
test did not include ram air presaurization of the vent system
nor the slight vacuum condition in the dump duct, both of which
will decrease dump time and will occur during any aircraft flight.
II. 1.3

Conclusions

All component testing has been successfully completed. With the
previously described modifications to the emergency dump system,
all system components are expected to equal or exceed the system
design requirements.
II. 2

CATEGORY I RELIABILITY TESTING RESULTS

I I . 2.1

Introduction

From 13 May 1970 to 9 June 1970, DTL conducted reliability tests
of the following components:
•

Vent valve with actuator

•

Nozzle valve

•

Spray valve with actuator

•

Dump valve with actuator

The context and results of these tests are explained on the Test
Information Sheets that follow. Included, also, is an explanation
of Standard Component Certification.

151

�II.2.2

Vent Valve Test Information Sheet

TEST CATEGORY:
COMPONENT OR SYSTEM:

Reliability
Vent Valve (KcCannaflo 600,
1-inch F602-S3-T ball valve

DATE AND TIME TEST INITIATED:
DATE AND TIME TEST COMPLETED:
TEST OBJECTIVE:

with Ramcon 8B-4 (WP) motor
actuator).
13 May 1970, 0900 hour's
22 May 1970, 1145 hours

The ball vent valve controls venting of the agent reservoirs and operates during filling, pump prime, and
spraying. Normal air pressure on the valve is less than
4 feet of water.
Test objective is to determine valve cycles to failure
or prove active life'is in excess of five years.
5-year life:

15 cycles/mission, 2/missions/day,
5 days/week, 52 weeks/year.

Total:

39,000 maximum cycles/5 years.

TEST DESCRIPTION:

The vent valve with actuator was installed as shown below.
Differential air pressure across the valve was 10 psig
The valve was opened and closed every 10 seconds by
applying 24 Vdc to the Ramcon Actuator using the DTL
Electrical Cyclic Tester.

TEST RESULTS:
The ball valve and motor actuator underwent 39,125
open/close cycles without failure. The ball valve
was bubble tight against 10 psig air pressure.
TEST CONCLUSIONS:
The vent valve assembly will exceed the 5-year life
requirement.

152

�II.2.3 Nozzle Vent Test Information Sheet
TEST CATEGORY:
COMPONENT OR SYSTEM:
DATE AND TIME TEST INITIATED:
DATE AND TIME TEST COMPLETED:
TEST OBJECTIVE:

Reliability
Nozzle Valve (Spraying Systems
No. 12328-NY-3/4, modified)
27 May 1970, 0830 hours
1 June 1970, 1130 hours

The nozzle valve is a diaphragm check valve modified to
allow pressurization behind the diaphragm, increasing
its sealing pressure. Normal air pressure behind the
diaphragm valve will be 40 psig.
Determine cycles to failure or prove active life is in
excess of 5 years.
5-year life: 10 cycles/mission, 2 mission/day,
5 days/week', 52 weeks/year.
Total:

26,000 maximum cycles/5 years

TEST DESCRIPTION:

The nozzle valve was installed as shown below. The
water valves were adjusted so that water pressure on
the diaphragm was 60 psig with the nozzle valve closed
and 20 psig with the nozzle valve open. The nozzle
valve was cycled open/closed by applying 24 Vdc to the
ASCO 3-way valve using the DTL Electrical Cyclic Tester.
Cycles were measured with a digital counter.

DTL 7117

DTL 71 HI
FAUCET
60 PSI WATER ={X}

90 PS' AIR

60442T
ASCu 3 WAY 24 VDC VALVE

SS WHIRLJET NOZZLE

SPRAYING SYSTEMS 12328
3/4 IMCH HYLON CHECK VALVE

153

�TEST RESULTS:

'

A standard nozzle valve was modified to allow air pressure
behind the diaphragm and fitted with a 0.025-inch thick
silicone-coated glass diaphragm. Air pressure was set at
50 psig. This diaphragm failed at 22,000 cycles due to a
sharp edged stainless steel ring inside the valve.
The ring was removed (does not degrade valve); all sharp
edges which the diaphragm would rub against were broken.
In addition, a sealing ridge in the valve bonnet which had
partially cut through the diaphragm was removed. A new
0.025-inch-thick silicone diaphragm was fit and testing
resumed.
The diaphragm failed at 9485 cycles. Inspection of the
diaphragm indicated that the glass fabric was powdering
due to fatigue. Therefore, glass fabric was eliminated
as a design choice.
A 0.050-inch-thick Buna-N coated Nylon fabric diaphragm
was fitted and testing resumed. Buna-N is not compatible
with the MISS agents; the purpose of the test was to
fatigue test the diaphragm fabric. The diaphragm pulled
away from the edges where it was compressed between the
bonnet and valve body. This failure occurred after 200
cycles.
The bonnet was replaced with a standard bonnet complete
with sealing ridge (machined off on previous bonnet). A
0.025-inch Buna-N coated nylon diaphragm was fitted and
testing resumed using 40 psig air pressure. A total of
26,016 cycles was completed without failure. The diaphragm wets removed and visually inspected for damage.
Only slight wear was apparent.
The final diaphragm will be Fluorosilicone-coated

Dacron.

TEST CONCLUSIONS:
Based on the test with Buna-N coated nylon, the final
diapliragm should exceed the 5-year life requirements.
Cyclic testing of the Fluorosilicone/Dacron diaphragms
will be initiated as soon as they are received by DTL.

154

�II.2.4

Spray Valve Test Information Sheet

TEST CATEGORY:
COMPONENT OR SYSTEM:

DATE AND TIME TEST INITIATED:
DATE AND TIME TEST COMPLETED:
TEST OBJECTIVE:

Reliability
Spray Valve (Weco Model 12,
3-inch butterfly valve with
Worchester Model C38W pneumatic actuator)
22 May 1970, 1130 hours
27 May 1970, 1420 hours

The spray valve is a fully open or fully closed valve
which controls agent release to the spray booms.
Test objective is to determine cycles to failure or
. prove active life is in excess of five years.
5-year life:

10 cycles/mission, 2 missions/day,
5 days/week, 52 weeks/year

Total:

26,000 maximum cycles/5 years

TEST DESCRIPTION:

The spray valve was mounted between 150-pound ASA flanges
and mounted to the DTL water lines. Water pressure was 63
psig. The valve was opened and closed by supplying 24 vdc
to the solenoid of the Worchester Actuator using the DTL
Electrical Cyclic Tester. Cycles -were measured with a
digital counter. Air pressure was 100 psig.

^

ORCHESTOft ACTUATOR

c
c
WECO MODEL 12
3 INCH BUTTERFLY

ICYCLIC
TESTOR
^=&lt;R£fi&gt;"AIR
PRESSURE

PS I WATER

MANUAL VALVE
WATER MAIN PRESSURE = 63 PSIG

TEST RESULTS:
After 12,125 cycles, a slight leakage past the butterfly
at the pivot points was noticed. The valve was left
closed for two days, and the leakage stopped.
At 26,025 cycles, the same leakage was noticed. The ASA
150-pound flanges were retightened, and the leak was
reduced to about two drops/minute.

155

�The valve was left closed and mounted for two days. All
leakage stopped. The valve was cycled ten times and
remained leak-free.
Visual inspection showed slight TFE butterfly disc seat
wear.
TEST CONCLUSIONS:

Rapid cycling of the valve (about 12,000 cycles/6 hours)
tended to relax the TFE butterfly disc seat seal and
allowed slight leakage. After setting for two days, the
TFE seat returned to its original sealing position,
eliminating all leakage. Cycling the valve an additional
ten times did not reproduce the leak.
Based on the above, no leakage is expected during a
normal 5-year life if the valve will be cycled about 20
times/day.
II.2.5

Dump Valve Test Information Sheet

TEST CATEGORY:
COMPONENT OR SYSTEM:

Reliability
Dump Valve (Weco Model 12,

4-inch butterfly valve with
Model B38N Worchester actuator
mounted)
DATE AND TIME TEST INITIATED:
DATE AND TIME TEST COMPLETED:
TEST OBJECTIVE:

2 June 1970, 1115 hours
9 June 1970, 1055 hours

The dump valve is a fully open or fully closed valve,
which controls release of agent from the tank to the
emergency dump line. Agent pressure on butterfly is
minimal (only the tank fluid head). Normal air operating pressure is 70 psig.
•

Test objective is to determine cycles to failure or
prove active life is in excess of five years.
5-year life: 2 cycles/mission, 2 missions/day,
5 days/week, 52 weeks/year.
Total:

5200 cycles/5 years.

TEST DESCRIPTION:
The dump valve with actuator was installed as shown
below. The butterfly valve was mounted between
bolted flanges with the butterfly disc irranersed in
water and actuated, using regulated air pressure
through a 4-way ASCO solenoid valve. The solenoid
valve was actuated by applying 24 Vdc using the DTL
Electrical Cyclic Tester.

156

�WORCHESTOR
ACTUATOR
HOUSE A I R

« INCH WE GO BUTTERFLY
MOUNTED IN
CORROSION WEIGHT ORES
FLANGES

ASCO it-WAY SOLENOID VALVE

TEST RESULTS:
Valve would not open at 70 psig but required 110 psig
After five cycles, required pressure dropped to 65 psig.
Operating pressure was increased to 100 PSI. After 2000
cycles the valve was closed and let stand for 2-1/2 hours,
after which 70 psi air was required to actuate (open) the
valve.
One-hundred psig cycling was continued. After 5500 cycles
the valve remained leak tight. Visual inspection indicated
no wear.
The valve was closed and let set for one day; opening
pressure was 72 psig. The valve was closed and let set
for six additional days; opening pressure was 78 psig.
TEST CONCLUSIONS:
The 5-year life requirement has been met and .exceeded.
The original actuation pressure of 70 ' -g will have to
be increased, as will the or^g-'nal aii eservoir pressure
of 100 psig. The air reservoir pressure can be increased
to 125 psig maximum (maximum pressure available from the
air compressor), and the valve actuator pressure can be
increased to 110 psig.
Further testing of the dump valve actuation system will
be performed during Category I Component Testing, Both
the individual valves and the dump system will be tested.
Since minimal fluid pressure is seen by the valve, it
may be possible to provide a spacer between the duir.p
valve and its bolted flanges to allow less compression
of the TFE seat, thus reducing the butterfly seating
torque. This will not decrease the valve's sealing
capabilities for the fluid pressures it will encounter.

157

�II.3

CATEGORY I RELIABILITY RETEST RESULTS

II•3.1

Introduction

From 14 July 1970 to 23 July 1970, DTL conducted reliability
retests of the nozzle"v&amp;lves'-with fluorosilicone diaphragm.
The context of these tests are explained in the Test Information
Sheets that follow.
The final diaphragm configuration was cycled through 38,500
complete open/close cycles without any apparent wear on the
components. A life duration of 7.38 years is equivalent to
38,400 cycles.
II.3.2

Nozzle Valve Test Information Sheet

TEST CATEGORY:
COMPONENT OR SYSTEM:

Reliability
Nozzle Valve (Spraying Systems
No. 12328-NY-3/4, modified)
14 July 1970, 1515 hours
23 July 1970, 1440 hours

DATE AND TIME TEST INITIATED:
DATE AND TIME TEST COMPLETED:
TEST OBJECTIVE:
Previous testing of the nozzle valve during May 1970
indicated that a glass fabric diaphr." gm v;as not applicable since the fabric powdered due to fatigue. A
nylon fabric diaphragm was tested and found to exceed
the 5-year life requirement.

The nozzle valve was subsequently retested as explained
below, using a dacron fabric diaphragm impregnated with
Fluorosilicone (necessary for chemical agent compatibility).
A 5-year life is represented by a total of 26,000 on/off
cycles as follows: 10 cycles/mission, 2 missions/day,
5 days/week, 52 weeks/year.
TEST DESCRIPTION:
'
*
The nozzle valve was installed exactly as was done for
the previous tes -ng (see June 1970 Category I Reliability
Testing Results). Water pressure on the diaphragm was
60 psig with the valve open (no air pressure behind the
diaphragm). Air pressure behind the diaphragm was
regulated to 40 psig.
TEST RESULTS:
A standard Spraying System valve was modified to allow
air pressurization behind the diaphragm, and the stainless steel annu?,us insert was removed as was done for
previous tests. A Fluorosilicone diaphragm was fitted

�and
the
was
the

the valve was assembled hand tight. At 6,500 cycles
valve was disassembled for inspection. The diaphragm
severely cut where the bonnet sealing lip was holding
diaphragm in place.

The sealing lip was sanded down slightly to reduce the
cutting effect, and a new diaphragm was fitted. The valve
was reassembled. Testing was resumed and stopped after
27,621 cycles. The valve was disassembled and inspected.
The diaphragm was cut at tne bonnet sealing lip.
A new valve was modified for air pressure behind the
diaphragm, the stainless annulus ring was removed, a new
diaphragm was fitted, and testing was resumed. After
5,000 cycles, air was passing through the diaphragm.
The diaphragm was again cut et the bonnet sealing lip.
The bonnet sealing lip was measured at 0.027-inch high,
and *:he standard Spraying Systems diaphragm was measured
at 0.027-inch thick. Therefore, it was felt that the
bonnet sealing lip should be cut down to 0.015-inch high
to try to eliminate diaphragm cutting.
A new bonnet was machined for a 0.015-inch high sealing
lip. A new diaphragm was fitted and testing resumed.
After 5,553 cycles, the test was stopped due to air
leakage past the diaphragm. The diaphragm was cut.
Aft'sis point it was fej.t that cutting the Fluorosilicone
could Ijest be avoided by using the Fluorosilicone diaphragm
in front of the standard Spraying Systems diaphragm and
using a standard bonnet. This was tried and the test was
stopped after 26,120 cycles.
No failure was noticed, but the Fluorosilicone diaphragm
was cut in one place (due to sealing lip on bonnet).
The Spraying Systems diaphragm was uncut.
Investigation of the slightly cut Fluorosilicone diaphragm
indicated that overtightening of the bonnet clamping bolts
was very likely the cause of the cutting.
New diaphragms were fitted, the bolts were torqued to
15 in.-lb , and testing was resumed. Testing was stopped
after 30,720 cycles. Inspection of the diaphragms showed
no cutting, but the Fluorosilicone diaphragm did have
impressions of the Spraying Systems diaphragm cloth
pattern.
Bolt torquing tests were performed and at 10 in.-lb the
Fluorosilicone showed no effect; at Is in.-lb , the
Fluorosilicone retained impressions of the Spraying
Systems diaphragm cloth pattern.

159

�Now diaphragms were fitted to the
torqued to 10 in.--lb, and testing
was stopped after 38,400 cycles.
phragms showed no cutting or wear

test valve, the bolts
resumed. The test
Inspection of the diapoints.

CONCLUSIONS^

The Spraying Systems No. 12328-NY-3/4 diaphragm check
valves can be successfully used as a MISS wing boom
nozzle valve by performing the following modifications:
use the Fluorosilicone diaphragm in front of the Spraying
System diaphragm; use a standard bonnet modified only to
accept air pressurization behind the diaphragm; torque
the bolts to 10-12 in.-lb. The standerd bolts should be
replaced with the safety-wire-type bolts to prevent the
possibility of accidental overtightening.

160

�APPENDIX III
STRESS ANALYSIS

This appendix contains detailed calculations for the 500-gallon
MISS tank and cradle. For analysis of the tie-downs and aircraft
external plumbing, refer to each individual aircraft Class II
modification documentation.

161

�TANK SIZE AND WEIGHT
ASME F&amp;D TAN
HEAD I I GA
(.078)
Ud IN. MAJOR
RADIUS
2.88 IK. K I N
RADIUS
I IN. FLANGE

BAFFLE

¥8.0 IN.
OUTSIDE
DIAMETER

X.

14 GA (.078)

9.16 IN.
— 52.0 IHCHES

-70.38 INCHES
OUTSIDE

VOLUME:

Tank Head

-

Cylinder

48-inch, 12 gage standard volume
including dish and inside corner
radius = 38.22 gallons
Ours is 48-inch, 16 gage =
38.3 gal/head
52.0 long by 47.844 diameter
Add 2 inches for heads flange
.. = 54 inches long by 47.844 dia'
meter
Volume ..() (4'-844)2(54) (4. 329 *

Vol

Total Volume

.

420.05

2 heads @ 38.3 = 76.6
i cylinder @
420.05
496.65
Total Volume = 496.65 gallons

AGENT WEIGHT:
SG = 1.0, Tank Pull,
(496.65) (1) (8.34) = 4142

Agent Weight = 4142 pounds
SG =l.o'

162

�WEIGHT
Tank Ends

Based on 48-inch, 12 gage (.109)
with 2-inch flange »"
74.9 pounds
Less 1-inch flange ( ) (H) (48^.109)
1
(.109) (.28) «
4.59
76.31
We have .078- inch thick, not .109
,0

Cylinder
Total

mo
~

(70.31) « 50.31 pounds each

52 inches long (H) (48-.078) (52)
( 0 8 (.28) * 170.9
.7)
2 each tank ends @ 50.31 * 100.62
1 each cylinder
170.9
271.52
Bare Tank Weight = 271.52

TANK &amp; CRADLE ASSEMBLY WEIGHT
Tank
1 each Baffle
15.0
1 each Tank Complete
271.52
1 each Cap, Wisco
0.5
1 each Filler Neck, Wisco
0.5
1 each Valve, Ball, Raincon Motor Driven
8.5
1 each Valve, 4-inch Butterfly, Weco w/Pneu Act 9.0
2 each Flange, 4-inch @ 8.25
16.5
1 each Tube, 4-inch OD x .065 wall
1.86
2 each Ferrule, 3-inch, Laddish @ .43
0.86
2 each Elbow, 3-inch Laddish @ 2.0
4.0
4 each Tri Clamp, Laddish, 3-inch @ 0.5
2.0
4 each Gasket, Laddish @ 0.5
0.1
2 each Elbow, 90°, 3-inch Tube @
3.06
2 each Elbow, 45°, 3-inch Tube @ 1.7.7
1.54
1.3 feet Tube, 3-inch
2.80
1 each Float, Level Indicator, Pneumercator
5. CO (est)
1 each Float Mounting Hardware
?.oo (est)
1 each Miscellaneous Weld Rod, Electric
Wire, Hardware
2C.OO (est)
TOTAL TANK ASSY
365.74 pounds

163

�Cradle

New (final) cradle

144 inches
88 inches.

61 inches"
164 inches"
80 inches

160 inches
200 inches
165 inches:
292 inches'
252 inches

4 each
4
4
4
1
2
2
4
4
1
1
1
1

each
each
each
each
each
each
each
each
each
each
each
each

22.27
Angle 4 x 2-1/2 x 1/4 £ 1.856 Ib/ft
14.57
Angle 4 x 3 x 1/4 @ 1.988 Ib/ft ,
5.97
Sheet .190 x 4 x 80" i .098 Ib/in,
Sheet .190 x 8 x 54" @ .098 lb/inj
16.07
(2 each)
8.53
Angle 3 x 3 x 3/16 @ 1.28. Ib/ft
Angle 1-1/2 x 1-1/2 x 1/8 @ .42 Ib/ft
5.59
(8 pieces 20" long)
Angle 1-1/2 x 1-1/2 x 1/8 @ .42 Ib/ft
6.99
(8 pieces 25" long)
,
16.17
Sheet 1/8 @ .098 Ib/in-^
Sheet 3/16 @ .098 lb/in4
28.62
48.72
Channel 5[2.32 @ 2.32 Ib/ft
Castor, Darnell @ 3.18
12.70
6.24
Strap Assy, Marman @ 3.12
Pivot Block @ 2.9
11.60
Ball Lbk Pins, Carr Lane @ .12
0.50
Lot Aluminum Weld Rod 5356
8.0
0.2
Padding, Strap @ 0.1
Jack, Marvel @ 5.0
10.0
Corner Block @ 4.0
16.0
Eye Bolts, @ 4.0
16.0
Lot Paint
10.0
Electric Box, Elco
5.
Electric Harness Assy
5.
Lot Electric Wiring &amp; Misc
_ 5.
TOTAL CRADLE
279.78
pounds

TOTAL CRADLE ASSEMBLY =279^78 pounds
DRY TOTAL TANK &amp; CRADLE ASSEMBLIES = 645.52 pounds
WET TOTAL TANK &amp; CRADLE ASSEMBLIES = 4788 pounds
Full SG = 1.0 agent

164

�TANK HEAD STRENGTH

P = U.OoDJU
A 6'&amp;e
where

A V*.

T U . J. t

(Pressed Metal Handbook)
__
«. i
rt
pg. -4A-10

P = Design pressure (psi) (Maximum working pressure)
t = Wall thickness (inch) * 0.078
S = Maximum allow _e stress (psi)
» 16,000 psi (200°F) page 2A-8f 304ss
L - Inside crown radius (inch)
48.0
Pmax

(.885)(J8T+ (0.1)(.078)
T

29.37 psi

Maximum loading Pressure = (8g)(Fluid Head Pressure)
Fluid Head Pressure = "£%«"• (-433 if » n^

= 2

«526 psi

Maximum Loading Pressure = (8) (2.526)
Maximum Loading Pressure =20.21 psi
Safety factor on working stress ©r working pressure
§F = 1.45 on working stress (ASME) which
has SF = 4 on material stress

165

�TANK HEAD BUTT WELD STRENGTH

where

S = Maximum allowable stress
t = Wall thickness
E = Joint efficiency
(single butt weld without backing strip)
R = Tank radius

_
_ _ (2) (16,000) (.078) (.6)

F

Pmax « 62.40 psi
Maximum Loading Pressure = 20.21 psi
S.F. = 3.09 on working pressure
TANK SHELL STRENGTH (INCLUDING LONG. WELD)

Pmax =
S
E
t
R

=
=
=
=
P
max ""

S^ T
E

+0

(Pressed Metals Handbook, pg. 2A-18)

Maximum allowable working stress
60% joint efficiency
Wall thickness 14 gage (.078)
Radius
(16,000) (.0.78)
24 + (.6) (.078)
Pmax = 31.14 psi

Maximum Loading Pressure - 20.21 psi (8g forward - pressure §
forward tank end)
S.F. = 1.54 on working pressure

166

�TANK SLOSH PLATE
750 INCH DIAMETER HOLES,
1-1/2 INCH CENTERS
221 OPEN
TOTAL WEIGHT = 15 IB

Pressure:

Assume tank 1/2 full sg = 2.0 agent at 8 g's,
full 35" head is seen by baffle plate.
p = (§ ( . 433
()
!

(2) (8g)

Pmax = 20.21 psi
Stress:

For a 30" radius curved plate
PR _ (20.21) (30)
t ~
r .078
w •w
a = 7773 psi

167

(14 gage-.078 thick)

Assume

�The perforated plate appears like

.0 o o
o oo
LTD o o

2.60 IN.

.75 IN. -J

Cross sectional area is reduced by .75-0 inch in 2.60 inches which
is 28.8% decrease in area or 71% the cross section area of a solid
plate.
Stress concentration:

Approximate like

1.5 IN.

Fron Shigley page 613,
Kfc » 2.18

Therefore, a

&lt;7773
23,866 psi

For 304ss,

SF =

Noto:

o viri

30
23.886

3 kpsi minimum
S.F. = 1.26

This is conservative since full 8g fluid head will never be
:;ocii by the baffle plate.
168

�TANK/CRADLE INTERFACE

Tank (full sg - 1.0)
« 4493 pounds (page 1 &amp; 2)
Maximum Down Load Factor
= 4.5g (normal and crash)
Maximum Forward Load Factor = 8.0g (crash). [3g normal!
Maximum Up Load Factor
= 3.0g (normal)
Maximum Side Load Factor
= 1.5g (normal &amp; crash)
Then, loading of tank is as follows:

t

67HO LB
(35,9*4)

(35,944)
6740 LB

FORWARD (OR LATERAL
DEPEND I Hi OK AIRCRAFT)

13,479 LB

35,944 LB

20,219 LB

169

�Vertical Load per Strap = 13,479/4 = 3370 pounds per strap

1,685 LB

Strap is : MBB90857

.080 thick 301 Cres 1/4 Hard. 3/8 - 24
bolt (9350 yield) 431 Cres

Minimum Band Yield Strength 12,000 pounds (page 45, Aeroquip 821-A)
qp - ^,000

SF

~ 1685
S.F. = 7.12
yield

HORIZONTAL FORWARD LOADING
Tank is prevented from slipping by interference at the lower tank
supports

170

�1

F (STRAP t^AD)

35,944

13.0 IN.
35,W L8
AT 89 CRASH

f

II.0

EM. * 0
A

4-30.5 IN.

(F)(30.5) =(35,944)(13.0)
F » 15,320

Strap Strength = £ » 7660 pounds
SF = 12000
7660

S.P. « 1.57
Load/bolt = 7660 pounds
Bolt strength = 9350 yield

S.P. = 1.22

171

�HORIZONTAL LOAD BEARING
Load/bearing pad

35944

17,972'pounds

17,972
THICK
H- &amp;S
BOTH SIDCS
OF CRADLE WEB.
BOTH SIDES
OF TANK.

1
U.O

ALL DIMENSIONS IN INCHES

Weld Shear
Total of 10" v/eld fillet

1/8 fillet

Shear area = (10)(.125) = 1.25 inches
304ss

° yield = 30 kpsi
e yield ».15 kpsi
(1.25)(15 kpsi) = 18,750 pounds yield
S.F. yield = 1.04 crash conditions

172

�7ANK TEAROUT

I
•

17,972 LB

- --

r

V
^

- ,„.

hi

1

«- 2.0 -J

0.190

ALL DIMENSIONS IN INCHES

Moment = (17,942) (.190) = 3408 in-lb

$

l.&lt;

F = i p = 1704 pounds
z
Weld Shear:

4" weld 1/8 fillet
A = (4) (.125) = 0.50 in2
(15K)(0.50) - 7500 pounds maximum load
7500

SF . , , =» 4.4 @ Crash Condition
yield
Skin Tear Out:

4" long x .078 wall = .312 in2
(.312) (15K) = 4.68K
SF = 4'68K
SF . , , = 2.75 @ Crash Condition

NOTK:

All these calculations are based on conservative assumption that no friction exists at the pads.

173

�I.ATKRAL LOADING

Assume like:
17,972
SAME STRAP LOADS IF
TANX PIVOTS AT BOTTOM
17,972

2 Straps at 8986
Strap Force = 8986
SF

= ^QOPA f • SF « 1.33 @ 8g crash
8986
yield

Bolt Force = 8986
SF =

,

SF = 1.04 e 8g crash
yield
_

174

�STRAP BOLT ATTACHMENT

TWO !/&gt;» INCH GUSSETS IK
LIKE WITH OUTSIDE GUSSETS
TANGENT TO .190 IN. THICK
TANK LOWER WEB SUPPORT

BOTH GUSSETS
5086-H32

-I/if

0.75 IN.

l»— 1.50 —*l

INCH

Shear:

Area = 7" of 1/4" fillet weld + 3/4" 5083-HO (welded)
Area Weld « ( 7 . 0 ) ( . 7 0 7 ) ( . 2 5 ) = 1.24
Area Plate = (1.5) (.75) = 1.13
Allowable Load - (1.2.4) ( 3 . 5 K ) + ( 1 . 1 3 ) ( 8 K )

t
6061-TO
e
yield
=• 13,380 pounds

t
5086-HO
e
yield

Actual Load = 8987
S.F. = 1.4 on yield, @ 8g crash

175

�PLATE BENDING

6986

i
1.0 INCH

ASSUME ENDS FIXED

*J

M (maximum) = 1/8 WL = (1/8) (8986) (1.0)
M (maximum) = 1123 in-lb
« (2.0 - . 5 ) (.75)3

Stress Concentration K=2.0 (Page 613 Shigley)
n

- v®L = (2.0) (1123) (.375)
I
.0527
a = 15,981

Material is 5086-H112, o.

= 16K

SF = 1.001 on 8g crash
yield

176

�A.\GLK SUPPORTS

6986 LB

I
I
I II

38'

I 1/2
x 1/8
5086-

F cos 34° + F_ cos 45° + Fr cos 38° = 8986 pounds
A
B
v,
F
Pi

x ;83 + F0 x .707 + F_x.787 - 8986 pounds
V-

B

Assume load split evenly between the 3 members
.*. Load/Member

8986

= 2995 pounds

Worst Member is @ 45'
.*. Load =

2995

Load = 4237 pounds

177

�Tension:

A = 0.36 in2
o = 11,769 psi

5086-H112

o . ,, = 14 kpsi minimum (HO condition)

SF = 1.19 @ 8g crash
yield

CRADLE STRUCTURE - 8G SIDE LOADING

35.9H1 18 REACTION
4 x 2 - 1 / 2 ANGLE
35,91(4 LB

f

II' i- 4; ;•i r

&lt;

F2

1

^

F

,/-* = 691 L B / I H .

H&lt;

i

1
F

3

.52 IN

»-

69 IN.

•
5528 LB

J*Rs*
4.0 IN.

15.0 IN.

7.0 IN.

0,

(5528) (4) =

(15)

= 1474 pounds
16,497 pounds

178

�Beam fixed at paints F,, F,,'F'3, and F4.
Find beam failure point between F~ and F~.

x 2-1/2 x \h IM.

0.190 IN.
.643 IK.

Angle:

AA = 1.58 in2, I

=0.81

Nt Axis @ 0.57
Plate:

Area = (.190) (4.5) = 0,855 in2
Nt Axis @ 1.3T-

IM00 = 0

(1.58)(0.57) + (.855) (1.35) = y (2.435)
y « 0.843

Angle I—

= 0.81 -f (1.58) (.843 - .57)2 = .9277

179

�Plate I--

= ()

(2.3)3

'
* &lt;-855)-(.843 - .775)2 * 0.3729

Distance between supports =29.0
For beam in uniform loading of
moment in center of beam

* 691 Ib/in with fixed ends,

* '(Jr) (691&gt; ^29) 2
\ax = 24'213
My
, »._i

in lb

- -

= (24.213K)(1.8)
£-_

o max = 33,527 kpsi
Material is 5086-H111 extrusion
°ult =

36 kpsi

SPult =1.07 8g crash

.

This is conservative since the tank was considered to add no
strength.

180

�STRENGTH AT SUPPORTS
I/I IN. GUSIFT
16,917 IB
8G CRASH

1-1/2 x l - t / 2 x
6086-HIII

Shear:

Cannot shear since load puts 1-1/2 x 1-1/2 x 1/8 angle
plus 1/8 sheet in tension.

Tension:

Length of 1/8-inch plate needed to hold 16,947 pounds.
0=

A

A=

o 'Lmin

Sheet is 5086-H32
, . . _
.
_ 16,947
°ult = 4°kpS1' min ~ (40K)(.125)
L . =3.38 inches
Tnin
_
.
Obviously strong enough

181

�LONGITUDINAL BEAM BENDING

The tank support chalks.can be considered rigid members.

• 1 6 , 9 4 7 LB

Assume load is carried equally by all four longitudinal members,
This is conservative since cross-bracing structures actually
distribute load.
W = 16,947

K-

60
ALL DIMCHSIOKS IN

where "S" is summary of all

INCHES

four longitudinal beams

s =. i/y
Upper beams : S = Y~QQ
Lower beams :

x 2=

I-44

S = (3.00) (2) =6.00

in

182

�0 sa

(16947)(18)
7 . 44
.

o » 41 kpsi .
°ult *40
This is okay since cross-bracing and friction forces were neglected.

DOWNWARD G LOADING-

Two cradle straps
-2Fcos 32° = 20419

F = 20419
(4TU8477

6026 pounds

Assume 1/8 x 8 belly strap must support total 6026 pounds
Tension:

o - A = T8TT1/8)
!
•
o = 6026 psi

°yld = 2S kpsi
SF = 4.6

Entire chalk structure is overly strong.

183

�TIE-DOWN LOADS

32,010

-»» 10,330

Maximum loads as determined by
aero tie-downs:

TOP

17,620

SIDE

VERTICAL COLUMN
Compressure load = 17/520 pounds
_

For pinned ends

- (20). ^ (17, 520)
-•
( n 2 ) ( l 0 . 3 - x 106)

I
,
mm

°-0546
Beam is 3 x 3 x 3/16 &lt;

Imih =0.38

SF = 7.60

134

�Convpressure Stress =

x^bft

16 222

*

Psi

'

SF - 18 Yl* comp.

SF = i:n y j eld
•"

""

'"

END

Tensile Load = 32,010 pounds
4 x 3 x 1/4angle A = 1.69
o » 18,940 psi
01 v

SF s

1^7910- ' SF - 1 . 1 1 yld

LONGITUDINAL BEAMS
4 x 2-1/2 x 1/2 angle

SIE; = 21

F75T .

A - 1.58

.
SF » 3.21 yield

185

'

"

�WELD SHEAR (END ANGLE)

To break the weld, block must pull out of corner. Weld length in
shear =2.75 + 4.25 + 2.25 +3.5
Shear length •» 12.75 inches
1/4 Fillet e'ult • 21 kpsi
Strength = (.707)(.25)(12.75)(21K) ~ 47,320 pounds
Maximum load = 32,010
SF - 1.47 ult (crash @ 3g)

x 3 x (/&lt;( IN.
5086

I/"» FILLET WF.LO EH0 ANGLE
TO CLOCK, THEN WELD L O N G I T U D I N A L
ANflLE TO BLOCK AND ENb ANGLE

* x 3 x i/x IN.
/»
5086

CUT TO 1 x 2 1/7. x I / I OR
STO U x 3 x 1/4 IF AVAILABLE

186

�CORNER BLOCK DETAIL

MUST HAVE FUSION OF
ALL 3 PARTS EQUAL TO
lh FILLET

TOP VIW

SIDE VIEW

/'/ / / rl.

•I
ll
il
H
II

/

/'.
\l I

/

o
/

/

/

/

/

187

/

/

/
/
/
/

I-8UHC-28
3 |M. BEEP TYP
C' BORE .675
DEEP TYP

�EYE BOLTS

Use 3014T shoulder eye bolt 1-inch shank, 1-8UNC-2A thread,,
2-1/2-inch shank.
Macarco,

Ult load = 40,000 pounds
If the maximum load imposed is vector sum of maximum component
loads,
• • • • • . '
•
Maximum load = 37,924 pounds
SF = 1.054 ult

This is conservative since more than one tie-down will be used for
the maximum load condition.
Also, maximum normal load = 3/8 crash load.
THREAD SHEAR

'

Thread is 1-8UNC-2B
Engagement - 1.90 inches minimum
Shear area » (J|)(n)(50%)(1.90) = 2.794 in2
Material is 5868H32 ' cult = 25 kpsi

Maximum load permissible = 69,850 pounds
SF = 1.84 ult

188

•

�INITIAL DISTRIBUTION
AF3C CSDHM)
1
HOS USAF (AFXOWO)
1
HOS USAF (KDPA)
1
HOS USAF (SAFKDE1
1
ASD (ENYS)
1
TAG CDORO)
,1
AUL (AUL-LSE-70-239)
• 1
TECH INFO (ARPA)
' 1
DDRSE (TECH LIB)
.'X
DDR6E (OEM TECH)
1
SMUEA-TS-L (TECH'LIB)
2SHJEA-D
1
USA ENGR RSD LABS
.
•
'2
USNWC (TECH LIB)
2
USN WEAPONS LAB (TECH LIB)
; 1
DESERET TEST CTR (TECH LIB)
4
DTC-STEPD-TC-AFLO
1
USA COMBAT DEVCOMD (CSGSB-ST)
1
DDC
2
AMCRD-WB
5
:
VJRAMA (MMCTB)
2
OOAMA (MMNOP)
HQ PACAF (IGY)

DL
DLOSL
DLIF

'

1
1

1
2
1

189 '
(The reverse of this page is blank)

�UNCIASSTFIED
• Srcunt*

DOCUMENT CONTROL DATA -ft&amp; 0
lj Ho*

»f ( I , fcorf,D&gt; «l»in&lt;.t(
II,
OMIC.IMA IIN«i- AC t*»Y» V (C&lt;U|»nfr*

UNCLASSIFIED

Corporation/Defense Technology Laboratories
P. 0, Box 1201, 333 Brokaw Road
San Jose, California 95108

1 . CHOW*
*

IW-5/A MODULAR INTERNAL SPRAY SYSTEM
« oucniPfive NOTcsfTyp* »t r*pw( Mdinchnlw &lt;fa&gt;*«&gt;

Final Report - July 1969 to September 1 7
91
»

AuTM6Rts7ffiratn«Mr,«M4dl&lt;

Larry R, Ramsauer
1

HEPORT D A T E

'

. 194

**. C Q N T R A C t OR ^RAMT NO.

AFATL-TR-72-13

r-1 on

'- Task No. OS
„ Work Unit No. 000

NUU«C&lt;«I|

OMIOINA1OR-I

F08635-69-C-0213
fc. PBOJEC T NO.

lib. HO.'or i

&gt;«. T O T A L wo. or PACE*

January 1972

'

OIH

CR REPORT NCfS) lAnf aUtft nu«b«» AMI «t^r *• M«l«Mff

AFATL-TR-72-13

|O. pISTOIBUTIOM S T A T E M E N T

Distribution limited to U. S. Government agencies only; this report documents
test and evaluation; distribution limitation applied January^ 1972 . Other
requests for this document must be referred to the Air Force Armament Laboiatory
(DLIF), Eglin Air Force Base, Florida 32542.
II. SUPPLEMENTARY NOTES

Available in DDC

12- SPONSORING Mlt.lt A R V A C T I V I T V

Air Force Armament Laboratory
Air Force Systems Command
Eglin Air Force Basc,^ Florida. 52542

The PWU-5/A Modular Internal Spray System has been designed and
developed to fit ten cargo/utility-type aircraft, including the C-47,
C-54, C-123, and C-130. The system was designed to disseminate herbicides, pesticides, and fertilizers in cher.ical solution, suspension
or slurry form, at ground deposition rates-from 3 ounces/acre to 3 gallons/acre with a minimum swath width of 2 times tha applicable
aircraft wing span. The system is completely self-supporting,
requiring no aircraft power/ and includes provisions for suction
filling, agent recirculation/agitation, dissemination, system
flushing, aircraft wasMown, and emergency dumping of the full agent
payload. The system used aerospace adhesive to secure all external
hardware, allowing system installation with minimal aircraft modification. A complete C-123K MISS was installed and flight tested at
Eglin Air Force Base, Florida. The system was subjected to the
complete flight envelope and functioned as designed. Flight- test
results indicated that manual operation of the emergency dump took
too long to initiate. Also, the dump chute should be moved to the
aft portion of the jump door to minimize emergency dump contamination
and the right-hand fuselage spray station should be capped off to
eliminate fuselage spray contamination.

DO,

UNCLASSIFIED
Security Cl*ssificatiM«

�•Sceuii'y CU«tiflc»tion
^

•

V4.

LINK A

K f V WOKO*

NOLI

Modular Internal Spray System
Modular System
Aircraft Spray Dissemination
Herbicide Dissemination
Pesticide Dissemination
Fertilizer Dissemination
Aircraft Modular System
Internal Spray Tanks
Cargo Aircraft Spray System
Utility Aircraft Spray System

•T

. - ' . " .
LINK C

LINK t
NOLI

ROLC

WT

•

I

-

'

:•

.• •

•

-

UNCLASSIFIED
Security C'lassifiCi

•TT

��80X7

UNCLASSIFIED/UNLIMITED

PLEASE DO NOT RETURN
THIS DOCUMENT TO DTIC
EACH ACTIVITY IS RESPONSIBLE FOR DESTRUCTION OF THIS
DOCUMENT ACCORDING TO APPLICABLE REGULATIONS.

UNCLASSIFIED/UNLIMITED

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6723">
              <text>026</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6725">
              <text>0379</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6728">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="39">
            <name>Creator</name>
            <description>An entity primarily responsible for making the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6722">
                <text>Ramsauer, Larry R.</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6724">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;Defense Technology Laboratories, FMC Corporation</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6726">
                <text>1972-01-01</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6727">
                <text>PWU-5/A Modular Internal Spray System</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6729">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6730">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6731">
                <text>herbicide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="1428" public="1" featured="0">
    <fileContainer>
      <file fileId="1243">
        <src>https://www.nal.usda.gov/exhibits/speccoll/files/original/1315041a21c910eaaa5eb001942c60a0.pdf</src>
        <authentication>dd86b9720e49a795f08aaf172cf6baa3</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="60">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="63192">
                    <text>Item ID Number

ou354

Author
Corporate Author

U

-S- Army Test and Evaluation Command, U.S. Army Av

Report/Article Title Report of Test USATECOM Project Numbers 5-4-3001 01 and -02, Integrated Engineering/Service Test of an
Interim Defoliant System Conducted Jointly by the U.S.
Army and U.S. Air Force, Part I - Service Test

Journal/Book Title
Year

1965

Month/Day

Ma

Color
Number of Images

y 25

D

52

^'vin ^- Young had this item filed under the category
"Equipment - How Developed, How Used"; DA Project
No. 1C543603D432; USATECOM Project No. 5-43001-02

Monday, January 29, 2001

Page 354 of 382

�6
UNCLASSIFIED

Project w». t 5-q- jooc owd - ox
Terf"

Defense Documentation Center
Defense Logistics Agency
Cameron Station • Alexandria, Virginia

UNCLASSIFIED

�-•••.• • , . . . . - • . • .
» -•-••••_ ' •• : •.' ..v. •'•-!;•;••'•.•.!'.'•• • - • - . - ; &gt; • ' : • *
.i.-:'/j:f,\--;: J;"v,."^;r.-:&gt;' "'.i/i-';"^'^,!^
:::
:;

'.$•. '-vV^^-'. "?V.''t'^'t^'fi" ;. '^: '

�K

REPORT OV TEST
PROJECT NUMBERS 5-4-3001-01 «nd -02
INTEGRATED ENGINEERINC/SERVICE TEST

OF AN
INTERIM DEFOLIANT SYSTEM
CONDUCTED JOINTLY BY THE US ARMY AND US A» FORCE
PART I - SERVICE TEST. USATECOM PROJECT NO. «-4-30&lt;H-0?
PA PROJECT NO. !CS43(&gt;0-iD432

28MAY1S55
Jli

U S ARMY
AVIATION TEST

BOARD

FORT RUCKER, ALABAMA

TIS A

'

�NOTICE: Hher government or other drawings, specifications or other data are used for any purpose
other than in connection with a definitely related
government procurement operation, the U. S.
Government thereby incurs no responsibility, nor any
obligation •whatsoever; and the fact that the Government nay have formulated, furnished, or in any way
supplied the said drawings, specifications, or other
data is not to be regarded by implication or othervise as In any manner licensing the bolder or any
other person or corporation, or conveying any rights
or permission to manufacture, use or sell any
patented Invention that may in any way be related
thereto.

�COPY
DEPARTMENT OF THE ARMY
HEADQUARTERS, US ARMY TEST AND EVALUATION COMMAND
Aberdeen Proving Ground, Maryland 21005
AMSTE-NB

17 Jun 1965

SUBJECT: Final Report of ES Test of an Interim Defoliant System
Conducted Jointly by U. S. Army and U. S. Air Force,
USATECOM Project 5-4-3001-01/02, DA Project
1B543603D432

TO:

Commanding General, U. S. Army Materiel Command,
ATTN: AMCPM-AI, Washington, D. C. 20315
Commanding General, U. S. Army Combat Developments
Command, ATTN: USACDC LnO. USATECOM,
Aberdeen Proving Ground, Md. 21005

1. References:
a. Report of Test Project 5-4-3001-01/02, ES Test of Interim
Defoliant System, Conducted Jointly by U. S. Army and U. S. Air Force
Parti, Service Test, USATECOM Project 5-4-3001-02, 28 May 1965,
U. S. Army Aviation Test Board. (Incl 1).
b. Appendix n to above, classified CONFIDENTIAL. (Incl 2)
c. Final Report of ES Test of Interim Defoliant System Conducted Jointly by U. S. Army and U. S. Air Force, Part n, Physical
and Climatic Tests, USATECOM Project 5-4-3001-01, May 1965,
Dugway Proving Ground. (Incl 3)
d. Final Report of ES Test of Interim Defoliant System Conducted Jointly by U. S. Army and U. S. Air Force, Part IH, Dissemination Tests, May 1965, Dugway Proving Ground, classified CONFIDENTIAL. (Incl 4)
COPY

�£OP Y '

AMSTE-NB
17 Jun 1965
SUBJECT; Final Report of ES Test of an Interim Defoliant System
'
Conducted Jointly by U. S. Army and U. S. Air Force,
I
USATECOM Project 5-4-3001-01/02, DA Project
1B543603D432
2. The final report consisting of three parts, reference 1, has
been reviewed by this Headquarters and the USA TECOM evaluation of
the Interim Defoliant System is as stated in the following paragraphs.
3. Tanks were filled using gravity flow from 55 gallon drums in .
the absence of standard filling equipment. It is not expected that the
use of hand pump (FSN 4930-255-9132) wil1 create any problems.
4. Standardized ground equipment of the type necessary for
handling and mounting the spray tank did not exist in the Army inventory at the time of this ES test.
5. The maintenance package, which consisted of Review Manuscripts MP 3-1040-240-12 and -20P, was evaluated and considered
unsuitable. The system was not operated long enough to give adequate
data for determination of the spare parts list requirements.
6. Two (2) deficiencies were found during engineering and service
tests, as follows:
a. Rupture of forward coupling hose during a high internal
pressure condition.
b. Rupture of rear coupling hose during a high internal
pressure condition.
Corrective modifications were incorporated into the systems prior to
their delivery to U. S. Air Force for the service test.
7. The system, as tested, complied with the operational characteristics of the approved SDR, except for reliability.
8. The modifications incorporated in the Defoliant Systems delivered to the U. S. Air Force for their service test should correct the
2

COPY

�CO£Y_
AMSTE-NB
17 Jun 1965
SUBJECT: Final Report of ES Teat of.an Interim Defoliant System
Conducted Jointly by U. S. Army and U. S. Air Force,
USATECOM Project 5-4-3001-01/C2, DA Project
1B543603D432
deficiencies and shortcomings found in this test. The U. S. Air Force
testing should be monitored closely to determine the suitability of
these corrections and to compile data to complete the maintenance
package, to evaluate agent transfer equipment and system reliability.
The requirement for a confirmatory or check test should be determined
after results of U.S. Air Force testing has been evaluated.

9. Conclusions:

a. The interim defeliant system should be suitable for Army
use on the armed OV-1C Airplane after the deficiencies and shortcomings
have been corrected.

b. The interim defeliant system was found to be compatible
with the armed OV-1C Airplane..

c. The flight time alloted for the service and dissemination
tests was insufficient to determine adequately the reliability and life
of the system and to compile an adequate spare parts list.

10. It is recommended that:
a. Provided that the reliability requirement is achieved,
the interim defeliant system, modified to correct the deficiencies
and shortcomings, be considered suitable for Army use on the armed
OV-1C Airplane.

COPY

�COPY_
b. The results of the U. S. Air Force serivce test of the
modified system be reviewed to determine any requirement for further
Army testing.
c. The Review Manuscripts MP 3-1040-240-12 and-20P
should be revised prior to production procurement of the interim
defoliant system.
i . , , . •_:
:,
,.-.. .: ,
FOR THE COMMANDER:

r

4 Incls
as
USANC - 5 cys of each Incl
USA CDC - 10 cys of each Incl
.;..:•.
i
Copies furnished:

OLIVER H. ASPINWALL, JR.
Capt, AGC
Asst Admin Officer

CO, USAMC, ATTN: AMCRD-DB (w/1 cy of each Incl)
CO, USAMUCOM (w/1 cy of each Incl)
CO, USA Edgewood Arsenal (w/5 cy of each Incl)
CO, DPG (w/o Incls)
Pres, USAAVNNTED (w/0 Incls)

4

COPY

�DEPARTMENT OF THE ARMY
UNITED STATES ARMY AVIATION TEST BOARD
"Fort Rucker, Alabama 36362
REPORT OF TEST
USATECOM PROJECT NUMBERS S-4-3001-01 and -02
INTEGRATED ENGINEERING/SERVICE TEST
V 'OF AN

INTERIM DEFOLIANT SYSTEM
CONDUCTED JOINTLY BY THE "US ARMY AND US AIR FORCE
PART I - SERVICE TEST. USATECOM PROJECT NO. 5-4-3001-02
DA PROJECT NO. 1C543603D432
DDC AVAILABILITY NOTICE
US Government agencies may obtain copies of this
report directly from DDC. Other qualified DDG
users shall request through Commanding General,
US Army Materiel Command, ATTN: AMCPM-MO,
Washington D.C. 20315.

l Bf niff.nwi
QtJABTEBS PENDING

Colonel, Artillery
President

�I Previous page was blank, therefore not filmed. I

�I Previous page was blank, therefore not filmed. [

ABSTRACT
This report on the Integrated Engineering /Service Test of the
Interim Defoliant System consists of three parts. Dugway Proving
Ground is responsible for the Physical Test and the Dissemination
Test, and reports of these tests will be submitted later. The Service
Test of the Interim Defoliant System on the armed OV-1C was conducted
by the USAAVNTBD at Dugway Proving Ground, Utah, during the period
14 September through 6 October 1964. Two deficiencies and three
shortcomings were found during this test. It was concluded that the
interim defoliant system should be suitable for Army use after correction
of the deficiencies and shortcomings, that the system was compatible
with the armed OV-1C Airplane, that the Review Manuscripts MP 31040-240-12 and -20P should be revised prior to production procurement
of the system, and that the time allotted for test was insufficient to
compile an adequate spare parts list. It was recommended that the
interim defoliant system be considered suitable for Army use on the
armed OV-1C when the deficiencies and shortcomings are corrected
and that the results of the US Air Force service test be reviewed to
determine any requirement for further Army testing.

�previous page was blank, therefore not filmed. I
DEPARTMENT OF THE ARMY
UNITED STATES ARMY AVIATION TEST BOARD
Fort Rucker, Alabama 36362
REPORT OF TEST
PART I - SERVICE TEST
OF AN

INTERIM DEFOLIANT SYSTEM

Table of Contents

Page No.

SECTION 1 - GENERAL
1. 1,
1.2.
1. 3.
1.4.
1.5.
1. 6.
1.7.
1.8.
1.9.
1. 10.

.

References
Authority
Test Objectives
Responsibilities
Description of Materiel
Background
Findings
Discussion
Conclusions
Recommendations

,

SECTION 2 - DETAILS AND RESULTS OF SUBTESTS . . .
2.0.
2.1.
2. 2.
2.3.
2.4.

Introduction. .
.
Installation Requirements
Flight Safety Aspects and Dimension Data . . .
Operational Data. ; . . . . .
Rocket and Machine-Gun Firing During Spray
Operation
2.5. Servicing Requirements
.
2. 6. Evaluation of Safety Aspects.
•

vii

1
1
2
2
3
3
8
9
16
16
16
17
19
19
20
21
22
25
26

�Table of Contents (Continued)
Page No.
SECTION 3 - APPENDICES

27

I. Test Data
IL Comparison with the SDR
(Classified CONFIDENTIAL: presented under
separate cover)
m. Deficiencies and Shortcomings
IV. Detailed Description of Materiel
V. Coordination
VI. Distribution List

viii

l-l
II&gt;1
III-l
IV-1
V-l
VI-1

�SECTION 1 - GENERAL
1.1. REFERENCES.
a. Letter, STEDP-CB, Headquarters, Dugway Proving Ground,
20 February 1964, subject: "Dugway Proving Ground Test Plan
. ...
(OPGTP) C 432, Integrated Engineering/Service Test of an Interim
Defoliant System Conducted Jointly by the US Army and US Air Force,
USATECOM Project No. 5-4-3001-01 and -02, " with one inclosure.
b. Letter, AM3TE-NBC, Headquarters, US Army Test and
Evaluation Command, 30 March 1964, subject: "Test Directive,
USATECOM Project No. 5-4-3001-03, ED Test of Interim Defoliant
System for OV-1 Mohawk, " with two inclosures.
c. Letter, CDCMR-U, Headquarters, US Army Comb&amp;t Developments Command, 4 May 1964, subject: "Department of the Army (DA)
Approved Small Development Requirement (SDR) for an Interim
Defoliant System, " with o n e inclosure.
••• "
d. Letter, AMCRD-SR, Headquarters, US Army Materiel
Command, 25 May 1964, subject: "Department of the Army (DA)
Approved Small Development Requirement (SDR) for an Interim Defoliant
System."
e. Letter, AMSTE-NBC, Headquarters, US Army Test and
Evaluation Command, 19 June 1964, subject: "Engineering/Service
Test of Interim Defoliant System, USATECOM Project No. 5-4-3001-00. "
f. Review Manuscript, MP 3-1040-240-12, "Operator and
Organizational Maintenance Manual, Spray Tank, Biological, Airplane,
E44 (End Item Code 958)," Department of the Army, June 1964, as
corrected 8 September 1964.
g. Summary Report 64-10, "Automatic Spot Counter and Sixer, "
Dugway Proving Ground, July 1964.
h. Letter, BUWEPS RAAD-131/14: CMM, 31 August 1964,
subject: "Model OV-1 Aircraft - Recommended Flight Operating
Limitations (Armament Aircraft); Revision to. "

�i. Review Manuscript, MP 3-1040-240-20P, "Organizational
Maintenance Repair Parts and Special Tools Lasts for Spray Tank,
Biological, Airplane, E44, (FSN
), (End Item Code 958), "
Department of the Army.
1.2.

1.2. 1. Directive.

. ,

Letter, AMSTE-BG, Headquarters, US Army Test and Evaluation Command, 10 December 1963, subject: "Directive for Conducting an Integrated Engineering /Service Test of an Interim Defoliant
System for the OV-1 (Mohawk) Aircraft Jointly with the US Air Force,
USATECOM Project No. 5-4-3001-00," as amended 30 January 1964.
1. 2. 2. Purpose.
To determine the suitability of the interim defoliant system on
the OV-1 (Mohawk) for the purpose of recommending type classification.
1. 3. TEST OBJECTIVES.
1.3.1. Primary.
To determine whether the performance, reliability, maintenance
requirements, and suitability of the Army Interim Defoliant System for
the OV-1 (Mohawk) Aircraft meet the SDR.
1.3.2. Secondary.
1. 3. 2.1. To determine whether the interim defoliant system will
interfere with the defensive capability of the OV-1 armed with machine
guns and rocket subsystems and whether the use of such systems will
adversely affect the spray tanks.
1.3. 2. 2. To obtain data for prediction of contamination densities and
area coverages for a variety of release heights and wind velocities.

�1.4. : RESPONSIBILITIES.

.

1.4. 1. Dugway Proving Ground.
, . -L •"

• . \ ' ' ^' I—•
:

.Dugway Proving Ground was responsible for:

1.4.1.1. Consolidating and coordinating the plan of teat.
',&lt;••,
•
''
1.4.1.2. Providing support for the Service Test accomplished at
Dugway Proving Ground.
, ; :
1.4. 1. 3.

Conducting the Physical and Dissemination Testa.

1.4,1.4. Providing a representative to monitor the Climatic Test
conducted by the US Air Force for the US Army.
*

-, : .v

1.4. i.5. Providing USATECOM with part IE, Physical Te«t (to include
US Air Force Climatic Test) and part m, Dissemination Test, of the
report of test.
;
• .
_ ' • • " * • • .

1

*4'2'

"

US Arm

•

' • . - • • . - ' - - • - ' -

y Aviation Test Board (USA.AVNTBD).

The USAAVNTBD was responsible for:
1.4.2. 1. Providing support for, and participating in, the Dissemination
Test accomplished at Dugway Proving Ground, Utah.
1. 4. 2. 2.

Conducting the Service Test.

1.4. 2. 3. Providing USATECOM with part I, Service Test, of the
report of test.
1.4.3.

US Army Biological Laboratories.

The US Army Biological L/aboratorieB were responuible for
providing the defoliant system for all tests.
1.5.

DESCRIPTION OF MATERjEL.

The defoliant system consists of two E-44 biological onvay tanko
designed to epray chemical agents from an rirplane fitted for external
wing stores. The system was installed on an armed OV-1C Airplane.
A detailed description is contained in appendix IV.

�Figure 1. Nose-cone section with four-bladed ram-air drive turbine.

1. 5.1. Tank.

,

The tacks are modified Aero 1C 150-gallon auxiliary fuel
tanks. The npse-cone section contains a variable pitch, four-bladed,
ram-air drive turbine which is coupled directly to a centrifugal pump
(figures 1 and 2). The pump provides the pressure necessary to
disseminate the agent at a rate up to 350 gallons per minute. The
nose-cone section was protected by an aluminum bulkhead which
reduced the tank capacity to 134 gallons. On the armed OV-1C Airplane,

�Figure 2. Nose-cone section with upper cowling removed.

the tank was further limited to a capacity of 80 gallons of agent by the
store - station weight limitations. The tail section houses a motoroperated gate valve which controls the fluid flow from the chemical
transfer line (pump output) to a spray boom horizontally mounted on the
rear of the tank. (See figure 3.) The spray boom has 32 tapped outlets
which accommodate the number of nozzles for the desired dissemination
rate (figures 4 and 5).

�Figure 3. .Tail section with inspection plate removed showing motoroperated gate valve.

1.5.2. Agent,
The defoliant agent used during testing consisted of a 50/50
mixture of LNA and LNB called "Orange" (Chemical Corps purchase
description: 198-2-47EA, Herbicide Mixtuve, Orange). The agent
was dyed with six grams of Dupont Oil Rerl (C. I. 258) per liter of
agent for test purposes.

6 ,

�Figure 4. Rear view of the interim defoliant system installed on wing
station No. 4, showing the Spray boom with 32 nozzles installed. An
LAU 32/A 2. 75-inch FFAR pod is mounted on wing station 6 with the
XM-14 50-caliber machine-gun pod on wing station 5.

1.5.3.

Controls.

The gate valve and turbine brake are electrically controlled
from the armu.ment panel in the cockpit, utilizing the 28-volt d. c.
electrical system.
"" "

�Figure 5.

1.6.

Close-up view of spray boom nozzles.

BACKGROUND.

1. 6.1. The requirement for the defoliant system is contained in subparagraph 129d(4), appendix E, of the Combat Developments Objectives
Guide.
1.6.2. The US Army Biological Laboratories were the prime contractor
for developing the defoliant system for use by both the US Army and
US Air Force.

�1. 6. 3. The defoliant system was given a safety- of -flight release on
31 August 1964 (reference h).
, &lt;• - * j.
\
' - \* '
. *
t '•
-.
.'V-O/' 1 "^*
f
1.6.4. A coordination' meeting of all participating agencies was held
at Dugway Proving Ground, Utah, on 23 March 1965. The following
resulted:
.
' . - . .^
•*"-

, . - - &gt;

&gt;

1.6.4.1. The USATECOM representative authorized: v
*-*vC*'
1
"". .
'
'
,
"' "'• "W*--1
a. Submission of a three -part report of test instead of one
integrated report. Part I, the Service Test report, contains a complete "Section I - General" (including findings, conclusions, and
recommendations of all the parts of test), and is the responsibility of
the USAAVNTBD. Part II, the Physical Test, includes the Climatic
Test conducted by the US Air Force. Part ffl is the Dissemination
Test. Dugway Proving Ground is responsible for parts n and in and
will submit these parts directly to USATECOM.
'- *** j

•-

-

' ' : ' ' :

. b. Use of pertinent data from the US Air Force test with
the modified tanks to evaluate the maintenance package and refilling
procedures. If possible, previous Dissemination Test data based on
prediction will be confirmed.
&gt;

•

'

.

'

•

.•

•

1. 6. 4. 2. Suitability of the maintenance and refilling data obtained
from the US Air Force service test on the modified tanks will determine
the requirement for a check test. Two tanks will be modified and made
available for a check test if required.
1.7.

FINDINGS.

1.7.1. General.

...,&lt;
l

.

v

1. 7. 1. 1. The system was installed on the armed CV-1C Airplane with
adequate clearances and without exceeding center -of-gravity (e.g.) limits
in any configuration. Initial installation and system check-out including
filling time required 7. 72 man-hours. (Tanks were filled after being
mounted on the aircraft. ) The only reconfiguration of the airplane was
disconnecting the electrical cannon plugs for the Aero 65 racks on wing
stations 3 and 4. The spray tank wiring was connected directly into
the wing outlet located in the pylon; therefore, only manual jettison was
possible.

�-

"" '-''.'
."

^iv%~

.

"- ""-£.' '•'"'7..'V3

-

•

^ ' : ..' &lt;--

%;••:•• :,-| .*&gt;**£&amp;.

-'• ^
: k

\::^-?-.3*i .-.'•!
4

'""""J;.-'4 -' Jt ':^S'^S

^/..V;^'' 7fc« Iv^-^i^/^^^k ''i^ "
• ^ &gt;y fc^
^^5*^- vJ^4f:^^.v-v;-r^^r?4i^V .-. - '
llfe'iS

Figure '6. Gravity-f?o\v filling of
installed spray tank usi:ig a 55gallon drum and an MJ-3 loading
trailer.

10

�Figure 7. The MJ-3 loading trailer with load spreader supporting a
spray tank in position.

1. 7.1. 2. Gravity-flow filling of the system (used to fill tanks mounted
on the airplane) required 1.5 man-hours. No special transfer equipment was provided. Equipment uscr' \vaa a 55-gallon drum with attached
nozzle (figure,6). A simpler and faster method of filling the tank is
needed. No difficulty was encountered in filling the tank when external
stores were carried on wing stations I, 2, 5, and 6.
1.7.1.3. The use of MJ-3 loading trailers which incorporate a lift
platform expedited mounting and filling operations (figure 7). The
only other ground-handling equipment utilized was a utility transport

11

�Figure 8. Utility transport trailer with two spray tanks installed.

trailer (figure 8) capable of carrying two full tanks. This equipment
is not Army standard. Mounting empty tanks on the wing stations and
then filling them with agent was faster and safer than mounting full
tanks.
1. 7.1. 4. The tank and packaging were not damaged and had not deteriorated, and the tank was functional after exposure to the following tests
(details are contained in part U, Physical Test):
a.

High temperature

b.

Low temperature

12

�c. Temperature chock
d. Rain "'
e.

" '

•'

- '• •

Humidity

f.

'

'"'
" ' • " """• '• ;
-:

"- : »*

Salt spray

g. Sand and dust

.. ...

„ .1

h.

Incline impact (except for splitting of cleats in shipping
,

i.

Corner-wise drop

j.

Rough road haul

crate)

. ,

.

_

k . Slosh

.

,

.-..'.".'•;

1. Ground transportation vibration
m. Air transportation vibration (packaging was damaged but
tr&gt;^ tank was operable)
1, 7.1. 5. Safety features of the system were considered adequate;
however, there was nc de-vice to prevent spillage through the overflow
tube during ground handling and accelerations. The agent was a. mild
skin irritant and harmful to macadam surfaces. Spills on a sod field
would cause discoloration which could be an undesirable tactical feature
as it would invite attention to the area by cir craft.
1.7. 1.6. The maintenance package, which consisted of Review Manuscripts MP 3-1040-240-12 and -20P, was evaluated and considered
unsuitable. The system was not operated long enough to give adequate
data to determine a spare parts list required. No special skills or
tools were required for maintenance performed during »hi? tsst.
1.7.2. Effects of the System on the Airplane Performance.
1.7,2.1. Degradation of airplane performance was minimal. No agent
impinged on the airplane surfaces during spraying runs utilizing either
maximum or lesser flow rates. All electrical controls in the system
ops-rated satisfactorily (see appendix I).

13

�.1.7.2.2. Armament firing during spraying was satisfactory. There
was no significant effect on the system operation from the firing of
machine guns and rockets. When rockets were fired from stations 2 and
5, a thin layer of rocket waste materiel was deposited on one side of
the *pray boom. Also, a fin-retainer button released when the rockets
fired made a small dent in the spray boom. Neither of these impingements affected the operation of the system.
1.7.3. Dissemination Performance.
fordetaUsT)

(See part TIT, Dissemination Test,

1.7.3.1. The maximum flow rate of the system was approximately 700
gallons per minute. Lower flow rates were obtained by decreasing the
number of spray nozzles prior to takeoff.
1. 7. 3.2. During 200-Vnot spraying runs utilizing the maximum flow
rate, the system produced a particle-size distribution having a mas«
medium diameter of 250 to 300 microns.
1.7.3.3. A deposit rate of three gallons per acre over an area greater
than or equal to 20 acres can be attained under most operational conditions.
1. 7.4. Deficiencies.
Two deficiencies were found during the Service and Dissemination Tests:
a. Rupture of the forward coupling hose during a high internal
pressure condition (figure 9).
b. Rupture of the rear coupling hose during a high internal
pressure condition (figure 9).
These deficiencies have been corrected and the modifications incorporated
in the systems delivered to the US Air Force for their service test. A
complete list of deficiencies and shortcomings is contained in appendix
1«7.5. Compliance with tlvs Sm«J? Development Requirement (SDR).
*

The system as tested complied with the operational characteristice of the approved SDR.

14

�firm

Figure 9. Ruptured forward coupling hose with torn teflon line (above)
and ruptured rear coupling hose prior to removal (below).

15

�1. 8.

DISCUSSION.

The modifications incorporated in the defoliant systems delivered
to the US Air Force for their service test should correct the deficiencies
and shortcomings found in this test. The US Air Force testing should
be monitored closely to determine the suitability of these corrections
and to compile data to complete the maintenance package and evaluate
agent transfer equipment. The requirement for a confirmatory or check
test could be determined after the results of the US Air Force test are
evaluated.
,
'
'
1.9.

CONCLUSIONS.

1. 9.1. The interim defoliant system should be suitable for Army use
on the armed OV-1C Airplane after the deficiencies and shortcomings
have been corrected.
.
'•
1. 9.2. The interim defoliant system was found to be compatible with
the armed OV-1C Airplane.
•
- ,
1. 9. 3. The Review Manuscripts MP 3-1040-240-12 and -20P should
be revised prior to production procurement of the interim defoliant
system.
1. 9.4. The flight, time allotted for the Service and Dissemination Tests
was insufficient to determine adequately the life of the system and to
compile an adequate spare parts list.
1.10.

RECOMMENDATIONS.
It is recommended that;

1. 10.1. The interim defoliant system, modified to correct the deficiencies
and shortcomings, be considered suitable for Army use on the armed
OV-1C Airplane.
1.10. 2. The results of the US Air Force service test of the modified
system b* reviewed to determine any requirement for farther Army
testing.
•

16

�SECTION 2
DETAILS AND RESULTS OF SUBTESTS

17

�I Previous page was blank, therefore not filmed. I

SECTION 2 - DETAILS AND RESULTS OF SUBTESTS
2.0. INTRODUCTION.
The service teat was conducted at Dugway Proving Ground, Utah,
uuring the period 14 September through 6 October 1964. A total of 13
spraying missions were attempted with the interim defoliant system
installed on the armed OV-1C Airplane; ten missions were successfully
accomplished. '
.
.
&lt;„.-,i
2.1. INSTALLATION REQUIREMENTS.
2.1.1. Objective.

• '•:•••

. - . . • . . - . • • • : - • ::; ,-..-.-»( y V.T.;-.

Y

To determine installation requirements.
2.1.2. Method.

,

t

.

-• .

The defoliant system was installed using both empty and full
tanks. The time and equipment required to uncrate the system and
install it were determined. The tanks were installed using the MJ-3
loading trailers. After a full spray tank was mounted on the Aero 65A
rack on one wing, the MJ-3 loading trailer platform was lowered slightly
to insure that the rack-mounting lugs had locked. The trailer platform
left in this position precluded a high wing condition on the opposite
wing' and assisted in mounting the second full spray tank.
2. 1. 3. Results.
2, 1. 3.1. A total of 6. 22 man-hours was required for initial installation
and checkout. Time and equipment required for uncrating and initial
installation is as follows:
a. Uncrating Time: 6 men @ 25 minutes = 2. 5 man-hours
Equipment used: MJ-3 loading trailer
b. Installation on aircraft (1) First spray tank empty, minus spray boom:

...

Time: 4 men @ 20 minutes = 1. 33 man-hours
Equipment used: MJ-3 loading trailer

19

�...... (2) Second spray tank empty, minus spray boom:"
Time: 4 men @ 16 minutes = 1. 06 man-hours"
.,.,..,-.;•; ^Equipment used: MJ-3 loading trailer ; ., ,
.

.

.

c. -v Electrical check, -

J

J

Time: 2 men @ 10 minutes = 0. 33 man-hour
Equipment used: Airplane electrical system and
armament stores controls .--'..V ••_'-.';•
d.

Spray boom installation - (two tanks)

.• ,

•

,

Time: 4 men @ 15 minutes = 1.0 man-hour '
2. 1. 3. 2. Average time to install defoliant system empty:
Time: 4 men @ 36 minutes = 2. 4 man-hours
•;..: - , Equipment used: Two MJ-3 loading trailers

&lt;

3

2.1.3.3. Average time to install defoliant system full:

•;;

t-

;
(•,:-•&lt;.

.

, Time: 4 men @ 40 minutes = 2. 67 man-hours
Equipment used: Two MJ-3 loading trailers

;

.
•
• - :

',;
...

2. 1. 3.4. Initial installation and system checkout including filling time
required 7. 72 man-hours. The only reconfiguration of the airplane
was disconnecting the electrical cannon plugs for the Aero 65 racks on
wing stations 3 and 4. . • -. .
.••
2. 1. 4. Analysis.
Not applicable.
2.2.

FLIGHT SAFETY ASPECTS AND DIMENSION DATA.

2. 2. 1. Objective.
Determine flight safety aspects and dimension data.
2. 2. 2. Method.
2. 2. 2. 1. Weight and balance were computed for takeoff weight with
full internal fuel, a two-man crew, and each spray tank filled to 80

20

�gallons. Landing weight was computed-for a 30-minute fuel reserve,
two-man crew, and empty spray tanks.
.£..';..
2. 2. 2. 2. Weight and balance were computed for takeoff weight full
internal fuel, a two-man crew, the spray tank full (80 gallons each),
and two XM-14 machine gun pods and two LAU 32/A rocket pods all
with full complements of ammunition. Landing weight was computed
for a 30-minute fuel reserve, a two-man crew, empty spray tanks,
empty machine gun pods, and empty LAU 32/A pods.
2. 2. 2. 3. The installation was measured to determine applicable
dimensions.
2. 2. 2. 4. The system was weighed empty and filled (80 gallons of
agent per tank).
- - . ; . . - . ; . \- : •:-.••;-.-..-,. \-_ •;
2. 2. 3. Results.
2. 2. 3.1. Both configurations were within takeoff and landing e.g.
and gross-weight limitations. DD Forms 365F are contained in
.
appendix I.
...... .
,
.....-,.- / .,/-.
2. 2. 3. 2. Ground clearances were adequate. Clearance from spray
tank to ground was 21. 75 inches.
2. 2. 3. 3. Clearance from the spray boom and the closest point on the
aircraft, the inboard end of the ailerons was 36. 0 inches and was
adequate.
2. 2. 3. 4. Weight of the defoliant system empty was 443. 52 pounds,
and weight with 80 gallons of agent per tank was 2149. 12 pounds.
2.2.4. Analysis.
Not applicable.
2.3. OPERATIONAL DATA.
2. 3. 1. Objective.
To determine operational data on the defoliant system with
specified flow rates of 700 (normal) and 350 gallons per minute.

21

�2. 3. 2.

Method.

2. 3. 2. 1. : The flow rate was set on the ground at 700 gallons per minute.
The airplane proceeded along flight path and altitude designated by DPG.
test officer at a true airspeed of 200 knots. The spray operation was
initiated and discontinued over designated points. The test was performed twice.
-.A-'-;"'.". .' ' - : . .".--. -..-v,' -. ,&gt; V 'i-.-^..r :*;,:; •.,-!•2. 3. 2. 2. This test was repeated using a flow rate setting of 350 gallons
per minute.::;;,;,;.^ ,*,-., - r - ,., i: -,.• :.•-.-:.• = &lt;:,&lt;,•&gt;:; -.: ;/.v ••:ci*z.U»r;;*i: y-fil
J .'•,-&gt; .••
•
a "Q, -2?. '.:.'&lt; :";!:.•

2. 3. 3. Results.
(For dissemination data, see part III, Dissemination Test. )
2. 3. 3. 1. No agent impinged on the aircraft.
2. 3. 3. 2. ON-OFF control was effective; however, after closure of the
gate valve, agent remaining in the spray boom was emitted as a fine : :
!
mist for approximately eight seconds.
•
:
2. 3. 3. 3. Degradation of airplane performance was minimal.
2. 3.4., Analysis.
Not applicable.
2.4.

ROCKET AND MACHINE-GUN FIRING DURING SPRAY OPERATION.

2.4.1.

Objective.

To determine the effect that firing of rockets and machine guns
has on the defoliant system and its operation.
.
2.4.2.

Method.

2.4.2.1.

Test Configuration 1.

.. With defoliant system tanks mounted on wing stations 3 and 4,
LAU 32/A 2. 75-inch FFAR pods mounted on wing stations 1 and 6,
and XM-14 50-caliber machine-gun pods mounted on wing stations 2

22

�Figure 10. Front view of interim defoliant spray tank
mounted on wing station 3, LAU 32/A FFAR
pod on wing station 2, and XM-14 50-caliber
machine-gun pod on wing station 1.

and 5 (figure 4), delivery of the spray was initiated in the firing range
area. Rockets and machine guns were fired during spray delivery.
2. 4. 2. 2.

Test Configuration 2.

With defoliant system tanks mounted on wing stations 3 and 4,
LAU 32/A 2. 75-inch Folding Fin Aerial Rocket (FFAR) pods mounted
on wing stations 2 and 5, and XM-14 50-caliber machine-gun pods mounted
on wing stations 1 and 6 (figure 10), delivery of the spray was initiated
in the firing range area. Rockets and machine guns were fired during
spray delivery.

23

�2. 4. 3.

Results.

2.4.3.1. Test Configuration I.

",

2. 4. 3. 1. 1. Rocket and gun blast had no apparent effect on defoliant
system operation.
1;

••,

&gt; 2.4. 3. 1.2. Rocket and machine-gun blast had no effect on spray system '
components. Spent rounds and links ejected downward from the machinegun pods were well clear of the spray boom. V
,
'.
2.4. 3. 1.3l No difficulties were encountered in using firing controls
while disseminating spray. As the ON-OFF controls for the spray
tanks a-&gt;-e on the BOMB fuze circuit, the rocket and gun-firing circuits
are not affected.
..
,
(,
•::.

""'-.' - ; V'

,'.

•

'

•":

:

' '., • V

'

'

'
'

. 2.4. 3. 1. 4. The spray tanks can be installed and filled with the weapon
' systems mounted in this configuration.
2.4.3.2. Test Configuration 2.
• '"

'

-

.

,

.

.

:

•

„ _

-

~

,

-

'

2. 4. 3. 2. 1. Rocket and gun blast had no apparent effect on defoliant
system operation,
,.
,
2. 4. 3. 2. 2. Gun blast had no effect on spray system components. Rocket
blast, deposited a thin layer of waste material on one side of the spray
boom. One rocket fin-retainer button dented the forward edge of one
side of the spray boom.
2. 4. 3. 2.'3. No difficulties were encountered in using firing controls
while disseminating spray. As the ON-OFF controls for the spray
tanks were on the BOMB fuzing circuit, the rocket and gun-firing
circxtits were not affected.
2. 4. 3. 2. 4. The spray tanks can be installed and filled with the w pon
systems mounted in this configuration.
2. 4. 4. Analysis.
,
Because of impingement on the spray boom of burned material
and the fin-retainer button, continued use of test configuration 2 could
have a damaging effect on the spray boom.
'

24

^

�2.5. SERVICING REQUIREMENTS.
2. 5.1. Objective.
To determine time, equipment, and personnel requirements
to fill the spray tanks.
_ ,
„,_ i - r ; . v ,_:
2.5.2. Method.

.

i;

'

^ ^ '

- The tanks were installed full 11 times. Twice the tanks were
installed empty and filled on the airplane. The time, equipment, and
personnel required for each filling operation were observed and recorded. Ease of filling was evaluated. Scales were used for test
purposes and would not be required for tactical employment.
- i i:

- . . _ : * •

.

•

•

'

-

2.5.3. Results.

-

.

•• -

..•*•.

.

'

2. 5. 3. 1. Standard filling equipment was not available with the defoliant
system during the period of the Service Teat. The filling equipment
consists of a hand-driven, dispensing pump (FSN 4930-255-9132).
Gravity-flow filling using one MJ-3 loading trailer to elevate the supply
drum required three men an average of 30 minutes (1. 5 man-hours)
to fill two spray tanks mounted on the airplane.
2. 5. 3. 2. A comparison between loading filled tanks (80 gallons) using
the MJ-3 loading trailer and filling the tanks when installed on the airplans was made. Time required to load filled tanks averaged 2. 67
man-hours. Time required to fill the tanks installed on the airplane
averaged 1. 5 man-hours.
2. 5. 3. 3. The filled spray tank, loaded on the MJ-3 loading trailer,
could be moved around without difficulty on smooth terrain by three
men. A minimum of two men was required to move the fully-loaded
spray tank on the MJ-3. Three men accomplished this task with more
ease and efficiency. The lack of baffles within the tank permitted
sloshing during movement; therefore, one man stabilised the filled
tank while two pulled the trailer.
2. 5. 3. 4. Using two MJ-3 loading trailers to remove the two spray
tanks from the airplane, place on scales for measured filling, pick up,
reinstall, and hook up on the airplane required an average e'«.psed
time of 47 minute*. This action was accomplished by four men.

25

�2.5.4. Analysis.

Not applicable.
2.6. EVALUATION OF SAFETY ASPECTS.
2.6.1.

;

Objective.

;,

;

.;,,,.

.
To determine data for compliance with USATECOM Regulation
385-7, "Safety Confirmation."
2. 6. 2.

Method.

Safety aspects were evaluated during system operation. Effects
of the system on aircraft operation were qualitatively evaluated.
2.6.3. Results.

.

.:

. . .'.. ., .:

2.6.3.1. Safety features were adequate.
2. 6. 3. 2. The spray tanks were jettisoned safely at Patuxent River,
Maryland (reference g, section 1).
• ?••'.
2. 6.4. Analysis.
Not applicable.

26

�SECTION 3 - APPENDICES

27

�APPENDIX I
TEST DATA

�WEIGHT AND IAUNCE CLEARANCE FORM F

r. o. JW»
Air •»»

TACTICU.

17 S«Dt»nbtr 19*4

MOT

10

62-58S1

C*j*. Ktach

KBehMlAAP

MMHT

ZDtfoIiutSpny

9 4. 5

M«C MWUIK ( A*B CWM O

Tufa oa Wlnf

5.

$Utfa»185 (3«ad4)
DOTDMtmOH Or UMD

i 00

400
? Tufty

OWVTU HAW MI

1

fWt/MM taMraxUM«. «*. »tfto&lt; f«t •*#&gt;&lt;•* toMf &lt;uirf
CIOTT rfwA* tmlfftH* JM««« •

4I

9 7.1

comtEcriom &lt;«* in

•on/

160 K»Uoai uci*

B.T n (

297

0,

HttWHL (

»&gt;nii MJ. run (

MTO c« mro

TOTM. WDCHT KMOVia

10

TiiuoorT cmaincii (fknmcM)

TOTAL KIOKT WOCO

TAODIT C-«.»I%M. o.c.b«m.

•CT wnmcs (*/. in

i_i
159

2 4 .2 Q. i
76

UTOOCl MTO

UMITATICNS
1AWMT &lt;»0

tsiso

(ttJ

11994

• PtXMISSIKE
C.G.TAK10TT

3.
Sprty 160 *»lloni
crniuTio Lioona amcmo*

&gt; Bmntf r«/M«* /real owrMnt &gt;ypHffl&gt;»&gt;» T. O.
&lt; ApplivM* 1* *«a* v«4At (*•*. Ml.
• AffUoOti* lofmt &lt;**tl&lt;t («•/. /».

DD

1 ,{'
2.1.
nniuno UMOM c «. p flaeaMtMxw. 154.60
&lt;arwr&gt;r&gt;)
/ a / F. J. Kir sen

WCtf KT AMO »ILAMCt AUTMOKTT

L

7 k. t

�WEIGHT AND BALANCE CLEARANCE FORM F
DATE

17 September 1964
Masnvnup/rueMT'iia
Teat

r o. i-if-tt *

TACTICAL
&lt;vst KtveKse FOK THAHSTORT missions}
WVLAWTYPI
moM
JOV-1C
Michael AAF
SCRHU.NO.
10
62-5851
Michael AAF

REMARKS

REF

2 Defoliant Stray Tankt
on Wing Station 185(3
and 4)

Ft. Rocker, Ala.
PHOT

Cape. -Kindt

ITEM

1

OIL (

1

MOM/

I 0 S 3 2
3 S

CM.)

$

• INDEX OR

WEKHT

•ASK AMPLANC (FV«« Ov( C)

2

2 XM-14 Caliber .50
Machine Gun Podi on
Wing Station 21 3 (2
and 5)
2 IAU 32/A 2.75H
FFAR Rocket Launcber
Pods on Wing Station
237 (1 and 6)

fMOI-tf-tf
HOME STATION

r

9 1. S
S. 3

OKTRIOIiriON OF LOAD
fRIW

a

CAMS mo
not

«««

i^P*.

.*»; '*&gt;*/W's5

185

2 Tanks

k,i»..i: '^in&gt;. f*1. **-jw3
4 0 0
t 4 4

213

2 M.C.
Podl

4 &gt; fl

if J , ft

237

2 LAU
32/A

8 1

1 p. 5

NO

2

•tlGHI

400

2 t. 0
7 3. 4

COMPUTER PLATE NO. (tfMtf)

fmrtl n*nt i furructfMU to tho pilot lor •hitting tomd antf
&lt;h».'K4 Imktot .~/ ImiuliKt «*ouM kt «&lt;,(«/. 60..

4

S

1 2 D 8 3 1 9 9 2. 6

O^IUTING WEIGHT
COMPT.

CALIBER

ROUNDS

wsm^iMi&amp;s

CORRECTIOKS (Kif. II)
CHAN6CS (-f IT -)

rim

COMrT.

1 INDEX OH
MOM/

WEIGHT

1
5
e
«

Is
S
7

FORWARD

t 7 0 6
4 4 2
2 5 2

160 gtllota acent
me 1500 rdi. immo.
14 2.75" rockets

2 1 2. 5
7 9. 9
t 2. 1

1 9 3 0

3 1 0. 6

EXTERNAL
KOCXCTI

297

BUILT IN (

«*0

BOM* RAT (

&lt;M-&gt;

EXTERNAL (

(M.)

I

WATER MJ. FUND (

0*U

9
10

JATO OR RATO

11
12
13
14

CORRECTIONS

d
'

TOTAL WEIGHT REMOVED

-

TOTAL WEIGHT ADDED

+

+

*CT DIFFERENCE (Rtf. Ill
LIMITATIONS
tCROS* WT. TAUOFF (»..

1S413
I PERMISSIBLE
C. O. TAKEOFF
• PERMISSIBLE
C. C. LANC1NS

P
t

12S63

&gt;£nt.r cottmtmnt ui» J.
App lembt* to trot* weight (A*/. JJ).
*App Ue«ftA» to tfrow weight (/?•/. /J).

™^r»

1

• dinf vafiM* /rom current mpplic*t&gt;l» T. O.
9

TAKEOFF C O. IN SI 14.

A.

c. OR m.

1 6 4 1 3 2 |6 3 7.
160.71

7

JATO OR RATO

AMMUNITION ttrayIrocketx,50caL,
FUEL

2 4 0 3
1 4 5 0

3 3 4. S
2 3 3. 7

?&lt;£$****

156.36
156.36

ttfff^vlrtf}

TAKEOFF CONDITION (GprrRftrf)

BOMBS

1 GROSS WT. LAKCMhG (M.)

rww

TAKEOFF CONDITION (CAmmcM)

15
16

ESTIMATED LANOING CONOTTION
CSTIMATtD LANDING C. G.

COMPUTED BY (-SifnarBrt)

Bgtff&amp;IStom

/s/ F. J. Kirsch

WEIGHT AND ftALAHCC AUTHDRITy &lt;&lt;tfful«r&lt;)
PILOT (Slf.1«f«r«)

1 Z S 6 3 2 0 6 9, 5
*.
164.73

�APPENDIX n
COMPARISON WITH THE SDR
(Classified CONFIDENTIAL,; Presented Under Separate Cover)

�APPENDIX in
DEFICIENCIES AND"SHORTCOMINGS
- -.'•.•/'.•'" 'Tif-ftTi-'

'I' •'

A. Deficienciea. The following deficiencies were found during the
Service and Dissemination Tests:
•,,* - • ; ; . ; , ; ../•- •-,&gt;'.
Deficiency

Suggested
Corrective Action

1. The forward
coupling hose
(centrifugal pump
to transfer line)
ruptured during s. 700gallon-per-minute dissemination and
rocket firing run at
approximately 200
knots true airspeed.

Replace with hose
which can withstand
high pressures generated during spraying.

2. The rear coupling
hose (gate valve to
spr.ay boom) ruptured
during 350-gallon-perminute -dis s eminatica
flight at approximately
200 knots true airspeed.

Replace with hose
which can withstand
maximum pressures
generated during
spraying.

Remarks

x

This suggested
modification
has been in- ,.
eluded in the
tanks sent to
the USAF.
;

This suggested
modification
has been included in the
tanks sent to
the USAF. ...

B. Shortcomings. The following shortcomings were found during
the Service and Dissemination Tests:
Shortcoming
1. Removal of the
nose cone upper cowling (a structural
member of the nose
cone) for inspection
and/or msiwouuii-' 2.
caused the lower
,

Suggested
Corrective Action
Weld the lower half of
the cowling to the tank
section.

in-i

Remarks
This suggested
modification
has been included in the
tanks sent to
the USAF.

�U: Suggested .
Corrective Action

Shortcoming
hall of the cowling
to displace downward. The resulting misalignment
caused difficulty
in reinstalling the
upper cowling.

Remarks

;

2. 'There was no
method of preventing agent over-flow
after filling the tank
to 80 gallons in a
level attitude, when
the tank was tilted,
raised, accelerated,
transported or during
normal ground handling.

Change to a different
method of limiting the
tank capacity to 80
gallons.
'

3. Wire to the ram air
turbine solenoid control
separated in flight.

Exercise better quality
control in wiring the turbine controls.

4. The cleats split in
the bottom of the shipping crate.

Provide shock-resistant
cleats and fastenings for
Level-A packaging of the
item.

Ill-2

' This suggested
" modification
has been included in the
tanks sent to
the USAF.

The wire was
too short and
was under
tension.

�APPENDIX IV
DETAILED DESCRIPTION OF MATERIEL
1. General.
defoliant system consists of two F— 44 biological spray
tanks. The spray tank is a modified Aero 1 .50-gallon auxiliary "- '
fuel tank'.' The capacity was. limited to 80 gallons of agent by an over- ;
flow stand pipe. ' The system is operated by the 28 -volt d. c. electrical
system controlled from the armament panel in the cockpit. The spray
unit develops pressure for spraying by means of a centrifugal pump, "
directly coupled to a variable pitch, four-bladed, ram-air driv turbine. The centrifugal pump transfers fluids from the main tank section
through a suction line, and forces the fluids at high pressure through
the transfer line to a gate valve control, to the spray boom.
'
I'-i'HY;- •-•':-.- ',:'-.•••-• .l;-i.r •; &gt; :•*»•;'•:&lt;:-'.••" o.';r: , • • • - ; • . ' • ; . • . 4 •••.-; ;?b 7,-^ »:•••..••;••£ \-iV't
2. Major Components. .... , . ., .. % . .,, K... ...,,„.,.,,...; :v/,i* ,,&lt;*} hi - ' • • . ( , : ; - . •:.•'••;

:•:--••

:.-',-". _-&lt;-&gt;r, •••

&gt; .-. -•' ! .-.-. -.-

. :,.,,.

. . - ; , • ( - . , . .... , ^ r • ,.,f. ~ - . . , v ; . v . . :

.. ,: The spray tank consists of three major components; the nose-,
cone section, tank section, and tail section.
,
,
t

: ,,....., a.

Nose-Cone Section.

........

&gt;..,'•-,..

The nose -cone section contains the variable pitch, fourbladed, ram-air drive turbine which is mounted on a support plate.
The rain-air drive turbine is directly coupled to the centrifugal pump.
The centrifugal pump is connected to the suction line transfer lines by
two teflon-lined rubber hoses. Electrical wiring is introduced into the
nose -cone section through a conduit line. Access to the nose -cone
section is accomplished by removal of the upper cowl.
, b. Tank Section.
This section contains the suction line and a check valve
to keep the pump primed during intermittent operation. This section
also contains the transfer line and an electrical conduit through the
tank body. Drainage is provided by a drain plug on the bottom of the
tank. Two access plates are provided on the left mid-section of the
tank to accomplish maintenance and inspection of the fluid storage area.
Suspension lugs with 14-inch spacing are provided. A cable with a
quick-disconnect fitting on the tank end provides for electrical control

IV-1

�from the airplane. An attached lanyard on the quick-disconnect fitting
allows emergency separation if the spray tank is jettisoned.
c.

Tail Section.

•MMWV^^MMMBMBMH^W

•

.,

., I ,'„!

.Ll

f

?c j

••*&gt;•••

. *"i.

,
*

t

I

....... The tail section houses an electric-motor-operated gate
valve which controls the fluid flow from the transfer line to the spray
boom. The spray boom is connected to the gate valve by a teflon-lined
hose. The spray boom is attached to the horizontal fins with six
mounting clamps. An access door is provided for maintenance and ' '
inspection of the aft section. A modified Aero 1C tail cone fairing fits
over the spray boom. - , . , . . . v . - . , . , . . - , . . . ' • . . . — ..r..,,..,, . ,.., :,..,; .*,. ,,,-*.,.. ', ( .
'"'3. •' Details of Operating Components and Operation.

;;

•'"*•'

The ram-air drive turbine incorporates a solenoid-operated
brake. In the de-energized state, the ram-air drive turbine is in a
braked condition with the propellers feathered. When the solenoid is
energized, the propellers unfeather and rotate in a counter-clockwise
direction until the ram-air drive is in the governed range of 3600 to
4000 r. p. m. at 200 knots. The ram-air drive is directly coupled to
the centrifugal pump and at a drive speed of 3800 r. p. m., the pump is
capable of delivering 300 gallons per minute, depending on the number
of nozzles selected for the spray boom. The slide-terminating motoroperated gate valve io controlled by a stepping solenoid. Controls for
operation are on the BC MB fuze circuit on the armament panel in the
cockpit. The TAIL position of the BOMB fuze circuit energizes the
ram-air drive brake solenoid only, and the NOSE and TAIL, position
energize the ram-air drive brake solenoid, the gate valve stepping
solenoid, and the gate valve motor. After the desired airspeed is
attained, the armament circuit breakers are pushed in, armament
power is switched on, and the BOMB fuze switch is placed in TAIL,
position. To begin spraying, the BOMB fuze switch is moved through
the SAFE position to the NOSE and TAIL, position, which opens the
gate valve. The switch is then returned to the TAIL, position. To
terminate the spraying operation, the switch is again moved to the
NOSE and TAIL position, which permits the gate valve to close. The
switch is then placed in the SAFE position.
4. Weights and Measurements of the Defoliant Tank.
a.

Capacity:

80 gallons

IV-2

�b. Weight: Empty
Full

221.76 pounds
1074.56 pounds

c. Overall Length:

166.10 inches

d. Diameter:

21.16 inches (maximum)

e. Center of Gravity: Empty
Full

77. 50 inches
79.18 inches

f. Spray Boom: Length

73.0 inches

Number of orifices: 32

IV-3

�APPENDIX V
COORDINATION
The following ageacie* participated in the review of the final
report:
US Army Aviation School
US Army Combat Developments Command Aviation Agency

�AP

US Ar»r Arlrtta* T«» ktW, tat tactar. Atetoav. »»»•« «t UtMtCOM Nifrg *». % 4 MM-M.
FM I S«*fc» TMI rf •» hurt* Ctafattuc S*tm M^BCM *Mlr kr *• US A»r •* «» A* N»w. CM
IW)Mt N^ ICMMOXMU, n Mn- IMS. K r*^S »» OM. TW US-AMr *•«•«*• TM iMHl
»» •*!««« U» »«rHc« M« w &lt;W I ..... i nifcHm »&gt;•«• «• tt» mM4 ov-»
HIM 1^ rii.il,

mat Omt dw M«!M W UM US AJ&gt; ta« «r*lM Ml

AD

US Atmr ArtMMB TM *OM&lt; tat tachw. AtofcMm. M^ni W U1ATICCM T»i|nt I
Hit I - Wnta TM. &lt;&lt; UMTICOM IW^A

�» "•'

i.'4 • "

•

• • ' Vv

""•'"•'.•'

&gt; * • • - / ."L

/'^

•

•• •' :iW'V«fr' ". X t V i •.#••• T -

irV

y . i"* ' '
1 ,'"

'^Sl'irTjr?,-W3^:*W '/•*•'

" •• tr'1'*

r

.r-'**

r

'JH'

* '

•&gt;

* • JC "**•

*•'? ,

** '

**•'

-«•(»"'*'• "-

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="30">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="4687">
                  <text>Alvin L. Young Collection on Agent Orange</text>
                </elementText>
              </elementTextContainer>
            </element>
            <element elementId="41">
              <name>Description</name>
              <description>An account of the resource</description>
              <elementTextContainer>
                <elementText elementTextId="49809">
                  <text>&lt;p style="margin-top: -1em; line-height: 1.2em;"&gt;The Alvin L. Young Collection on Agent Orange comprises 120 linear feet and spans the late 1800s to 2005; however, the bulk of the coverage is from the 1960s to the 1980s and there are many undated items. The collection was donated to Special Collections of the National Agricultural Library in 1985 by Dr. Alvin L. Young (1942- ). Dr. Young developed the collection as he conducted extensive research on the military defoliant Agent Orange. The collection is in good condition and includes letters, memoranda, books, reports, press releases, journal and newspaper clippings, field logs and notebooks, newsletters, maps, booklets and pamphlets, photographs, memorabilia, and audiotapes of an interview with Dr. Young.&lt;/p&gt;&#13;
&lt;p&gt;For more about this collection, &lt;a href="/exhibits/speccoll/exhibits/show/alvin-l--young-collection-on-a"&gt;view the Agent Orange Exhibit.&lt;/a&gt;&lt;/p&gt;</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
      <elementContainer>
        <element elementId="52">
          <name>Box</name>
          <description>The box containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6670">
              <text>024</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="53">
          <name>Folder</name>
          <description>The folder containing the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6672">
              <text>0354</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="54">
          <name>Series</name>
          <description>The series number of the original item.</description>
          <elementTextContainer>
            <elementText elementTextId="6675">
              <text>Series II</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="41">
            <name>Description</name>
            <description>An account of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6671">
                <text>&lt;strong&gt;Corporate Author: &lt;/strong&gt;U.S. Army Test and Evaluation Command, U.S. Army Aviation Test Board, Fort Rucker, Alabama</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6673">
                <text>May 25 1965</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6674">
                <text>Report of Test USATECOM Project Numbers 5-4-3001-01 and -02, Integrated Engineering/Service Test of an Interim Defoliant System Conducted Jointly by the U.S. Army and U.S. Air Force, Part I - Service Test</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6676">
                <text>spray equipment</text>
              </elementText>
              <elementText elementTextId="6677">
                <text>Ranch Hand aircraft</text>
              </elementText>
              <elementText elementTextId="6678">
                <text>herbicide application</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
</itemContainer>
